August 10th, 2011, 05:20 PM
Post Count Number #1
www.intactautomation.com Intact Automation Pvt Ltd Pune : Panel Testing Technician
Company Name : Intact Automation Pvt. Ltd.
Location : Pune
Designation : Panel Testing Technician
Job Title : Technician
Job Summary : INTACT having expertise in the field of Commissioning & Switchgear Servicing & Retrofitting of MCC/PCC Panels. We are looking for Technicians for its Commissioning Support & Overhauling & Servicing of Switchgears & MCC / PCC Panels.
Experience : 2-3 years of experience in Wiring & Testing of MCC / PCC Panels.
Qualification : ITI / NCTVT / Dipolma Engineer in Electrical
Position : 10
Location : Pune but ready to travel all over India
Job Title : Panel Testing & Numerical Relay Programming Engineer
Job Summary : INTACT having expertise in the field of Commissioning & Switchgear Servicing & Retrofitting of MCC / PCC Panels. We are looking for Electrical Engineer for its Commissioning Support & Numerical Relay Programming & Communication with DCS Systems.
Experience : 2-3 years of experience in Energy Automation & Electrical MCC / PCC Panels Designing.
Qualification :Diploma / BE Electrical Engineer
Position :4
Location : Pune but ready to travel all over India.
Send us your resume to r.singh@intactautomation.com
Contact us :
Intact Automation Pvt. Ltd.
23 Mangal Arcade,
Opposite Panchashil Hotel,
Chinchwad Pune 411019,
Maharashrta.
Web : http://intactautomation.com
August 24th, 2011, 04:08 PM
Post Count Number #2
IJT addict
Name : SENTHIL MURUGAN JAYAPANDIAN
Email : mailme_jsm AT yahoo.co.in
Designation / Skillset : Electrical /Design/Testing
RESPECTED SIR/MADAM,
SUB :APPLYING FOR THE POST OF Electrical Design/Testing Engg
I would like to apply for the post of Electrical Design Engg . in ur esteemed concern.i am enclosing herewith my resume for ur kind reference .
Expecting an early and favourable reponse from u regard.
THANKING YOU,
Resume :
Objective
A quality minded, conscientious ELECTRICAL TESTING AND COMMISSIONING ENGINEER who can excels at resolving complex engineering problems and improving processes with the ability to evaluate and commend alternatives and communicate recommendations effectively.
Professional Experience
Summary of professional Experience
Over 6 years experience of dismantling construction, installation, inspection, maintenance, Pre- commissioning and Commissioning of Equipments in electrical, instrumentation and control systems with safe, timely efficient and cost effective manners in Power plants, Gas Insulated Substation (GIS) and Commercials.
Foreign Experience
SAUDI ELECTRICITY COMPANY,Kingdom of Saudi Arabia.
From Oct 2010 – Still
Position Held
- Electrical Testing and Commissioning Witness.
MAIN DUTIES AND RESPONSIBILITIES :-
Testing And Commissioning Witness for
- POWER TRANSFORMERS
- 115/13.8KV GIS COMPLETE TEST
- HV AND MV POWER CABLE’S AC/DC HIPOT
- CURRENT AND POTENTIAL TRANSFORMER
- POWER AND LV CIRCUIT BREAKER
- PROTECTIVE RELAYS
- SWITCH GEAR AND CONTROL & RELAY PANEL’S
- METER’S
M/s. AL - OSAIS INTERNATIONAL HOLDING CO, POWER DIVISION
Kingdom of Saudi Arabia
www.alosais.com From June 2008 – July 2010
Position Held
- Electrical Testing and Commissioning Engineer.
Major activities During Testing and Commissioning : As per standard T & C procedure, Testing and Commissioning of all types of Transformer, NGR, Connection of CT & VT for GIS, HV & MV Power Cables Hipot, Busbar Hipot, All types of CB, ACDB and DCDB Panel’s, Switch Gear Panel’s and Control & Relay Panel’s, Control Circuit, condition of termination, Connection tightness, Checking & Testing of Relay setting of Microprocessor relays AREVA, ABB & GE relay’s.
MAIN DUTIES AND RESPONSIBILITIES :-
POWER TRANSFORMERS :
- 50/60/80 MVA / 132/13.8 KV/ YNyn0+d/ ONAN/ONAF1/ONAF2
Make : PAUWELS TRANSFORMER.
- Testing and Commissioning of 5MVA, 33/11kV Power Transformer (Make IMB Transformer).
- 1000 KVA 13.8KV/ 230V/ Dyn11/ Auxiliary Transformer/Make : STC
- Carry out all routine and type tests for Power Transformer’s according to the latest I.E.C standard.
- Mechanical Inspection and Visual Check.
- Electrical Check List.
- ELECTRICAL COMMON TEST :
- Core Insulation Resistance Test
- Winding Insulation Resistance Test.
- Polarization Index
- Transformer Turns Ratio Test (TTR).
- Vector Relationship Test.
- Winding Resistance Test (For all taps).
- Transformer Stability and sensitivity checking.
- TRANSFORMER BCT’s TEST :
- Ratio Test (Both Voltage and Current Method).
- Polarity, Secondary Winding Resistance, and Insulation Resistance Test.
- CT Magnetizing (Saturation Current Test).
- OTHER SPECIAL ELECTRICAL TEST :
- Short Circuit Test / Percentage Impedance Voltage Test.
- Zero Phase Sequence Impedance Test.
- Magnetic Core Balance Test.
- TAN DELTA OR POWER FACTOR TEST :
- AC Insulation Power Factor Test AT 10kv
- Winding Excitation Current Test AT 10kv
- Bushing Power Factor Test AT 10kv
- Buchholz Relay Test- Air Injection and Mechanical Simulation Method.
- Pressure Relief Device for Main Tank and OLTC- Mechanical Simulation Method.
- Breakdown Voltage Test (BDV) for Transformer Oil.
- Functional Test for Transformer OLTC and Cooling System.
- Transformer LCC Auxiliary Devices Test.
- Transformer Cooling fans Test.
- Transformer Temperature Measuring Gauge’s.
- Winding Temperature Indicator. (WTI)
- Oil Temperature Indicator. (OTI).
- Analyzing the test results and issue reports.
- Supervise the inspection process in each stage during production and on completion.
- Continuation journeywork for the delivery committees.
- Signature all reports and certificates.
- Sharing to solve the complains of our clients with customer service sector.
- Planning & scheduling preventive & shutdown maintenance to ensure smooth operation of plant & equipments.
- Management of Technical Documents.
Testing & commissioning of Distribution Transformers (Make-WESCOSA)
- Testing and Commissioning of 0.3, 0.5, 0.750, 1, 1.5MVA,13.8kV/480V/208V Distribution Transformer.
Testing & commissioning of Dry Type Transformers (Make-GE).
- Testing and Commissioning of 0.1125, 0.150, 0.225MVA,480V/208/120V Dry Type Transformer.
115/13.8KV GIS COMPLETE TEST :
- Testing and Commissioning of CT’s,VT’s,SF6 Gas Density Switch test ,SF6 Gas Leakage test,SF6 Gas Purity test,GIS Busbar Contact Resistance Measurement test, Busbar High Voltage test,10kv Isolation test on ES with Enclosures,SF6 Circuit Breaker Timing test, Earth Switch Timing test, Disconnecting Switch Timing test, and SF6 Dew Point test in GIS
HV AND MV POWER CABLE’S AC/DC HIPOT :
- HV and MV cables insulation resistance, HIPOT tests. Using VLF test kit
(Rating 13.8Kv) – As per SEC Standard.
- HV and MV cables insulation resistance, HIPOT tests. Using AC/DC test kit
(Rating 13.8Kv) – As per Aramco Standard
CURRENT AND POTENTIAL TRANSFORMER :
- Testing Current Transformer insulation resistance test, Polarity test, Ratio test, Magnetization test and winding resistance test. (800-400/1A and 3000/1A).
- Testing and Commissioning of Current Transformer (Range : 800/5A, 1000/5A,1200/5A,1600/5A).Using CTER Test Kit.
- Testing and Commissioning of Current Transformers (Range : 50/1A, 75/1A, 100/1A & 3000/5A) Using ACVT Test Kit.
- Testing and Commissioning of Potential Transformer (Range : 480/120V)
- Testing Potential Transformer insulation resistance test, Polarity test, Ratio test and winding resistance test. (Range : 13.8 kV/115 V Make - ABB). Using CPC 100.
POWER AND LV CIRCUIT BREAKER :
- Troubleshooting of All type breakers (ABB, ACB, VCB, SF6) - Make GE, ABB, SIEMENS & CUTLER HAMMER.
- Testing the Breaker’s closing / tripping time by testing kit make EGIL.
- Checking Insulation resistance, Oil level, Vacuum/ GAS Pressure, Contact Resistance, moving and fixed parts lubrication, Closing and Tripping coil condition & resistance.
- Testing and Commissioning of Molded Case Circuit Breaker (MCCB) and Three phase power meter.
- Tested Circuit Breakers – Range (250A, 400A & 800A) Make – Siemens.
- Tested Circuit Breakers – Range (175kv) Make – HUNG.
- Tested and Commissioning of LV Power Circuit Breakers (1600Amp), and MCCB (1250Amp).
- Vacuum circuit breakers insulation resistance test, Timing test and contact resistance test.
PROTECTIVE RELAYS :
- Calibration, testing and commissioning of electrical protection relays such as Bus bar High Impedance relays(MFAC), Bus Supervision relays(MVTP),Under voltage &Over voltage relays, Under frequency Over frequency and Auxiliary relays.(Make :Areva).
- Protections relay testing by Secondary Injection of over current protection relay and Earth fault protection relay.(Micom P122/P120) using FREJA 300
- Testing and Commissioning of Ground Fault Relays (Make-GE).
- Testing and Commissioning of Motor Management Relay 369 (Make-GE), MIFII Relay (Transformer neutral CT Protection),
SWITCH GEAR AND CONTROL & RELAY PANEL’S:
- Testing and Commissioning of 480V Switch Boards (Total 23 No’s) Make-GE.
- Testing and Commissioning of 13.8kV switch gear and relays and recycle gas compressor in refinery.
- Testing and Commissioning of 132kV Control and Relay Panels (Make-ALFANAR and WESCOSA Panel)
- Testing and Commissioning of 4.16kV switch gear and control gear and motor management relays in refinery.
- Testing and Commissioning of 480V switchgear and control gear and management relays for motor circuits.
- Testing and Commissioning of 480/277V, 3Ph, and 4W Switch Rack Panels.
- Testing and Commissioning of 33kV Control and Relay Panels (Make-Venison Panel) and Static Relays.
- Testing and Commissioning for ACDB and DCDB panels.
- Control wiring insulation resistance check.
- Operation and Function test of Electrical Equipment according to Schematic Diagrams.
METER’S:
- All Meter’s and RTK Annunciators.
Project Handled
PROJECT’S:
- Khurais Residential & Recreation Complex, Khurais, KSA.
- Yanbu Refinery-Yanbu, KSA.
- Gas Insulated Substation No # 8829, East of Unayza, Qazzim, KSA.
- Gas Insulated Substation No # 8122, Al moroj Area, Riyadh, KSA.
- Rabigh Power Plant Extension Stage-7, Project No.38 to 49, Rabigh, Jeddah, KSA.
- Industrial Security Training Center (ISTC), Dhahran, Dammam, KSA.
- Karan Gas Plant, Khursaniya, Dammam, KSA.
- North Park Office Complex (NPOC), Dhahran, Dammam, KSA.
CLIENT:
- Saudi Electricity Company (SEC-COA, WOA, EOA).
- Saudi Aramco.
- National Contracting Company.
India Experience
M/s. SOUTHERN PETROCHEMICAL INDUSTRIES CORPORATION LTD, CHENNAI.DIVISION: SPIC-SMO (EHVT)
From July 2006 – To May 2008
PROJECT : RAJIV GANDHI GRAMEEN VIDYUTIKARAN YOJANA (RGGVY)
CLIENT : Power Grid in Uthra Pradesh (U.P)
DESIGNATION : Electrical site / testing & commissioning Engineer.
MAIN DUTIES AND RESPONSIBILITIES:-
- Testing and Commissioning of 5MVA, 33/11kV Power Transformer (Make IMB Transformer).
- Testing and Commissioning of Outdoor Type Current Transformer (Range: 400/200/5A).Make-KAPCO ENGG.
- Testing and Commissioning of 33kV Control and Relay Panels (Make-Venison Panel) and Static Relays.
- Measurement of Earth resistance using the earth megger.
- Installation of Structure and Equipment.
- Erected 33/11kV Substation Equipments like Outdoor type CT, PT, PCVCB, and 5MVA Power Transformer.
- Earth mat Execution for Eight Substation (Total 13No’s).
- Co-ordination with Customer and Witness-Testing of Control & Relay Panels.
Industry-2 : M/s. FOREAST ELECTRONICS PRIVATE LTD, CHENNAI.
From June 2005 – To May 2006
DESIGNATION : Electrical production/ T & C Engineer.
MAIN DUTIES AND RESPONSIBILITIES:-
- Managing the field quality control procedures.
- Control of field tests and inspection records for electrical work Daily inspection Reports, Design Document preparation of Scope before commencement of every step of work.
- Testing and Commissioning of Automatic Power factor Controller and Servo Stabilizer Panels.
- Operation and Function test of Electrical Equipment according to Schematic Diagrams.
Skills and strengths
STRENGTHS:
- knowledgeable in many electrical subjects who can make convincing discussions
- Consistent, loyal performer who can make an immediate contribution.
- Proactive attitude with ability to anticipate & solve problems.
- Having the interest in design of distribution &power transformer and keen to adopt as the carrier.
- Full fathomed for the following standards which related to the above products and its materials
I.E.C 60076-parts 1-2-3-4-5-8-10-11-14 (power transformer)
I.E.C 60296-60422-60599-60156 -60475 (Transformer oil)
IEEE std C57.113-1991, C57.111-1991(power transformer
Familiar with the following Test Kit’s
- SINGLE PHASE RELAY TESTER- SVERKER 760.(Make- GE Energy)
- THREE PHASE RELAY TESTER-FREJA 300.(Make- GE Energy)
- PRIMARY CURRENT INJECTION KIT - ODEN.(Make- GE Energy)
- TRANSFORMER OHM-METER.(Make-Megger)
- INSULATION RESISTANCE TESTER. (Make-Megger).
- MICRO-OHM METER- MOM600A.
- DIGITAL LOW RESISTANCE OHM-METER-DLRO-10X.(Make- Megger)
- 3Ph-TRANSFORMER TURNS RATIO TESTER- TTR.(Make- Megger)
- CURRENT TRANSFORMER EXCITATION,RATIO,AND POLARITY TEST SET- CTER 91.(Make- Megger)
- CT & PT TESTER -AUTOMATIC VOLTAGE CURRENT TRANSFORMER - AVCT.(Make- Siemens)
- DELTA 2000 TESTER (Make - Megger )
- CPC 100 TESTER (Make – OMICRON)
- VLF AC HIPOT TEST KIT.
- CURRENT TRANSFORMER ANALYZER – CTA. (Make – OMICRON)
- PRIMARY CURRENT INJECTION KIT-COTEL.
- AC/DC HIGH VOLTAGE TEST KIT-PGK 150HB. (Make – BAUR)
- CMC Relay Test Kit. (Make-OMICRON).
Academic Qualifications
GRADUATION:
- BE in Electrical and Electronics Engineering/Year 2003-2005/ /1st Class
Institute: Sri SaiRam Engineering College/ Anna University - Chennai.
DIPLOMA COURES:
- Diploma in Electrical and Electronics Engineering/Year 2000-2002/1st Class
Institute: Kumaran Polytechnic College, Mathur, Thiruvannamalai-TamilNadu.
Declaration
Being a capable, honest and enthusiastic person, I present myself as a diligent professional who will serve the needs with full devotion, dedication, confidence and punctuality. I’ll keep proactive attitude with ability to anticipate and solve problems. Moreover, information given above is correct and true to the best of my knowledge.
Place :
Date : (J.SENTHIL MURUGAN)
-------------------------------------------------------
More Information about this submission and submitter:-
___________________________________________________
Submission ID : 4243409
Date & Time : 12th Jun 2011 12:45 PM (UTC)
IP Address : 2.90.171.164
Browser Info : Mozilla/5.0 (Windows NT 6.1) AppleWebKit/534.30 (KHTML, like Gecko) Chrome/12.0.742.91 Safari/534.30
Predicted Country : --