    Naval Dockyard Visakhapatnam

    Applications are invited for absorption of Ex-Naval Apprentices of Dockyard Apprentice School, Visakhapatnam only for following posts in the prescribed format as given at Annexure-1 so as to reach the Admiral Superintendent, Naval Dockyard Visakhapatnam-14 within 30 days of publication of this advertisement.

    Post : Electrical Fitter
    No. of Vacancies : 30 Posts

    Post : Computer Fitter
    No. of Vacancies : 01 Posts

    Post : Radar Fitter
    No. of Vacancies : 11 Posts

    Post : Radio Fitter
    No. of Vacancies : 25 Posts

    Post : Sonar Fitter
    No. of Vacancies : 05 Posts

    Post : Machinery Control Fitter
    No. of Vacancies : 11 Posts

    Post : Electrical Fitter
    No. of Vacancies : 34 Posts

    Post : instrument Fitter
    No. of Vacancies : 01 Posts

    Post : Boiler Maker
    No. of Vacancies : 03 Posts

    Post : Engine Fitter
    No. of Vacancies : 17 Posts

    Post : Machinist
    No. of Vacancies : 07 Posts

    Post : Ref & AC Fitter
    No. of Vacancies : 16 Posts

    Post : Welder
    No. of Vacancies : 08 Posts

    Post : Painter
    No. of Vacancies : 16 Posts

    Post : GT fitter
    No. of Vacancies : 02 Posts

    Post : ICE Fitter
    No. of Vacancies : 15 Posts

    Post : ICE Fitter Crane
    No. of Vacancies : 2 Posts

    Post : MT Fitter
    No. of Vacancies : 01 Posts

    Post : Pipe Fitter
    No. of Vacancies : 5 Posts

    Post : Blacksmith
    No. of Vacancies : 02 Posts

    Post : Plater
    No. of Vacancies : 16 Posts

    Post : Lagger
    No. of Vacancies : 13 Posts

    Post : Rigger
    No. of Vacancies : 10 Posts

    Post : Shipwright
    No. of Vacancies : 19 Posts

    Grand Total : 270

    Pay Scale : Rs. 5200 – 20200/- with Grade pay of Rs. 1900/-

    Age : Minimum 18 years and maximum 25 years of age.

    Qualification : Candidate should have passed matriculation examination and have completed apprenticeship training with at least 1 year of experience in the trade.

    Selection Process : Written Test/Interview

    More Details : http://www.davp.nic.in/WriteReadData...2_92_1112b.pdf

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : venkatachalapathi
    Email : ogvenkat72 AT yahoo.com
    Dear sir.
    I applied your exsteemed client organization . Here with attached my CV for welding inspector for your review.
    Thanking you
    With Best Regards
    venkatachalapathi

    Resume :
    CURRICULAM VITAE

    OF

    G.VENKATACHALAPATHI


    Post Applied For : QA/QC Welding Inspector HomeNo-0091-4632243260
    I have worked with TANMIA FOR OIL& CONSTRUCTION LIMITED,Yemean as a Welding Inspector and also 15 years working Experience as a QC Welding Inspector with Consolidated Contracting International Company S.A.L-Qatar, Dodsal Pte Limited-Qatar, Lahoud Engineering limited-UAE and in India with Petrochemical, OIL/GAS and Refinery Industries ,.
    Having valid Driving Licenses D.L.No-TN69z20030000635 (LMV) for India
    Computer skills on MS Word, MS Excel & MS Power Point

    Academic Qualification :
    B.Sc Degree (Physics) 1992-1995 with First class in S.R.N.M.College,
    Madurai Kamarajar University, Tamil Nadu, India

    B.Tech (Mech)
    (Rajasthan Vidhyapeeth University)
    Technical Qualification :
    AWS-CWI- (CERTIFICATE NO-10022711)
    CSWIP 3.1 (CERTIFICATE NO- 47221)
    ASNT LEVEL II- RT, UT, MT & PT
    Key Skills
    1. Codes and Standards :
    API 1104, ASME B.31.3, ASME 31.4, ASME 31.8, ASME SEC IX, ASME SEC II, API 5L, ANSI B.16.5.AWS D1.1
    2. Documentation :
    WPS, PQR, welder qualification, As-built drawing preparation, construction quality procedures and method statements.Daily welding reports and NDT requests
    3 Pipe and Pipeline Inspection :
    Welding and Piping for Petrochemical Plant, Gas Plant, Refinery and cross country Pipeline.
    EMPLOYMENT HISTORY IN ABROAD-5 Yrs
    1. Project : KHARIR CCU EXTENSION
    Company : TOTAL E&P YEMEN
    Organization : TANMIA FOR OIL & CONSTRUCTION LTD,YEMAN
    Period : From 25 Sept 2010 TO Still Now working in Yeman
    2. Project : Ras Gas Onshore Expansion project Phase II
    (Train 6,7 & AKG II EPC)
    RasLaffan,Qatar.
    Client : Chiyoda Technip Joint Venture
    Company : RasLaffan Liquefied Natural Gas Co Ltd
    Organization : Consolidated Contractors International Company
    Position held : QC Welding Inspector.
    Period : From Nov 23 -2007 To Nov 05-2009..
    3. Project : Qatar Gas 3&4 Onshore (LNG) project.
    RasLaffan, Qatar.
    Client : Chiyoda Technip Joint Venture.
    Company : Qatar Gas Co Ltd/shell/conoco Phillips.
    Organization : Consolidated Contractors International Company
    Position held : QC Welding Inspector.
    Period : From Nov 06 -2009 To Dec19-2009
    4. Project : Upstream and Compression Facilities (Gas Project)
    Ras Laffan, Qatar.
    Client : JGC Corporation
    Company : Dolphine on/off shore Engg
    Organization : Dodsal Pte Limited
    Position held : Welding QC Inspector
    Period : From 29/01/2006 To 02/09/2006
    5. Project : ULG/LSGO Project, Ruwais Refinery, Abu Dhabi.
    Client : Technip, Italy
    Company : parson Engg
    Organization : Lahoud Engineering Co. Ltd., Dubai
    Position held : Welding Inspector /NDT Co-ordinator
    Period : From 22/08/2003 To 03/03/2005
    EMPLOYMENT HISTORY IN INDIA -10yrs
    6. Organization : Plus Tech Engineering pvt ltd
    Client : LARSON &TOUBRO LTD, HAZIRA, SURAT
    Company : ONGC
    Project : BCP-B2
    Position held : Welding Inspector
    Period : From Nov 2006 To Oct 2007
    7. Organization : Bridge & Roof Co (India) Ltd,
    Project : Chennai Petroleum Corp. Ltd (CPCL) Project
    Position held : Welding Supervisor/NDTCo-Ordinator
    Period : From May 2001 To March 2003
    8. Organization : Gulf Engineers And Constructors (P) Ltd – India
    Project : Group Gathering Station (Ggs) Project
    Position Held : Welding Foreman
    Period : Jan 1997 To Jan 2001
    9. Company : Gopec Engineering (P) Ltd – India
    Project : Adkm 01 – Adkm 09 Project (Ongc)
    Position held : Trainee Foreman
    Period : July 1995 To June 1996
    JOB RESPONSIBLITIES
    - Implementation and monitoring of CQP, method statements.
    - Control Weld quality as per ITP, Procedures and Standards. Maintain QC records
    - Inspection of cross-country pipelines, piping, and utility piping..
    - Control, management and execution of all project activities as per specification codes and witness procedures.
    - Knowledge of plant piping & Fittings.
    - Inspection of piping spools, fittings & other Materials.
    - Experienced in WQT, PQR and Preparation of WPS.
    - Witnessing Welder Qualification and Welding Procedure Qualification
    - Experience in piping / Systems:
    - Process / Power Piping Works for Oil Gathering Stations / Centers and Gas Plants, Petro-Chemical Plants, Power Plants as per ASME B31.1, B31.3, BS 1113 and Shut down .
    - Pipelines and Flow lines for Transportation of Oil & Gas products as per API 1104, ASME B 31.4, B31.8 and Clients Specification. Worked for BELHAF EPRS PIPELINE PROJECT
    - Structures and Duct works for Piping Rack, Gas Turbines and Boilers (Including Heavy Columns and Girder Beams of Boilers)
    - Analysis of failures, solving the same and providing Technical supports for elimination / reduction of defects / distortion and improving the productivity.
    - Knowledge of film interpretation/evaluation of Radiographic Films of Welds and Witnessing / Interpretation of Ultrasonic Testing of Welds, Plates, Pipes, MT/PT of welds
    - Material Checking (ISO Bill of material, Color coding, stamping)
    - Checking weld joint preparation, fit up, alignment & dimensional inspection as per drawings
    - Review of received filler and consumable Test Certificate (TC).
    - Monitoring of consumable storage, handling, packing and drying temperature as per project approved procedure.
    - Monitoring of Pre heat, Inter pass temperature and inter pass cleaning as per WPS.
    - Visual inspection of welded joint profile, surface finish and defects.
    - Monitoring PWHT, Hardness checking, PMI checking of pipe spools.
    - Test Pack review and documentation.
    - Witnessing hydro test and pneumatic test.
    - Familiar with Welding processes as GTAW, SMAW, FCAW, and SAW.
    - Coordinated and communicated with fabrication supervisor, fitters, welders and inspection personnel of clients
    The followings are from my experience generally covers in the Quality assurance through Inspection of
    - Carbons steel : ASTM A106 Gr.B, ASTM A105, A234 WPB,
    API 5L X52 PSL2,API X70,A672-C65&Galvaized CS etc.
    - Carbon steel for low temperature : ASTM A333 Gr.6, A671-CC60, A350-LF2, A420 WPL6…
    - Low alloy steel for high temperature : ASTM A335 P11,A234 WP11,A691-1,A182-F11
    - Stainless Steel : A312-TP304,A358-304L,A182-F304L,A403-WP304L,
    A240-304L.
    - Nickel Alloys steel : ASME SA 204 Gr,ASME SA 203,
    - High alloyed corrosion resisting : INCONEL-82, KOBELCO TGX-308L.

    Declaration
    I hereby declare that the above furnished information’s are true to the best of my knowledge and belief.
    Yours Faithfully,
    G.VENKATACHALAPATHI
    -------------------------------------------------------
    More Information about this submission and submitter:-
    ___________________________________________________
    Submission ID : 4259877
    Date & Time : 16th Jun 2011 6:44 AM (UTC)
    IP Address : 117.206.81.156
    Browser Info : Mozilla/5.0 (Windows NT 6.0; rv:5.0) Gecko/20100101 Firefox/5.0
    Predicted Country : India

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CURRICULAM VITAE
    SHAMSUL HAQUE BARBHUIYA
    - email address” barbhuiya100 AT yahoo.co.in
    NAVAL ARCHITECT WITH 10 YEARS OF OVERSEAS EXPERIENCE
    Industry : Ship Repair/Ship Building/Shipyard/Docks/Marine and off shore.

    Functional area : Naval Architecture/Mechanical Engineer/Ship Building/Ship Repair/Management/Maintenance/Docking/Off Shore.
    Professional Experience
    May 2009-
    May 2011
    Position : Ship Repair Manager
    Employer : INTER OCEAN SHIP REPAIRS, LLC, DUBAI
    - Preparation & Tracking of the projects involving Ship Repair, Ship Building, conversion and off shore repairs.
    - Assisting in docking/undocking of vessels in Dry Docks, Synchro Lifts and Floating Docks.
    - Identification, monitoring & streamlining of critical paths running through the Project.
    - Job allocation to Engineers of all Discipline and follow up for daily job progress.
    - Ensure mobilization/demobilization of resources and out sourcing as required.
    - Commercial negotiation with clients. Cost control by optimized utilization of resources.
    - Follow up progress, needs and deliverables, contract milestones, Estimating budget quantities, costs, durations and resources.
    - Coordinating with clients and subcontractors.
    - Generation of reports Weekly/Monthly basis.
    - A very good experience in Dry Docks World Dubai procedures..
    - Accomplished projects onboard large size FPSO, FSO,VLCC, oil tankers, Chemical Carriers, Barges, Supply vessels and Off Shore Rigs etc.
    - Taking charge on Work Shop Supervisors, Project Supervisors, Foremen etc effectively.
    Dec 2001
    -Dec 2008
    Position : Project Manager
    Employer : ZAMIL OPERATIONS & MAINTENANCE LTD, SAUDI ARABIA
    - Planning/ Scheduling Projects involving repair/maintenance of Saudi AARAMCO Vessels.
    - Monitoring progress of projects and resolving difficulties to meet EDC.
    - Liaise with Sub-Contractors, clients/docking authority and maintaining records/returns regularly.
    - Conducting daily/weekly production meetings with ARAMCO and vessel representatives.
    - Cost control by employment of adequate resources.
    - Processing procurement of materials / spares etc.
    - Updating PPM data
    - Taking charge on production Supervisors, Work Shop Supervisors and all other supporting resources effectively.
    Oct 2000 –
    Oct 2001
    Position : Project Engineer
    Employer : Al Bucheeri Industrial Services, Abu Dhabi, UAE
    - Planning/Scheduling and preparation of scope of works for structural steel repair of ADNOC(Abu Dhabi National Oil Company)’s large size crude oil storage tanks, gasoline storage tanks etc.
    - Keeping clients updated for progress of projects.
    - Ensured timely accomplishment of project with adequate quality control.
    - Co-ordinate with subcontractors to accelerate progress and reduce project cost.
    - Ensured HSE requirement are met with.
    May 1996-
    May19 97
    Position : Overseer
    Employer : (Deputed by Indian Navy) ADMIRALTY SHIPYARD ST. PETERS BURG, RUSSIA
    - Monitoring progress of construction works of Fleet Tanker, INS Jyoti, displacement 40,000 Tons as per standard specification approved by Indian Ministry Defence.
    - Co-ordination with Admiralty Shipyard Authority and holding daily/weekly production meetings.
    - Maintaining all project related correspondence between two countries via Indian Consulate.
    - Training ship’s crew on various systems, equipment, their operation, repair and maintenance onboard.
    Interpretation of drawings and manuals in English among Indian crew.
    Jan 1984-
    May 1999
    Position : Chief Shipwright Artificer
    Employer : Indian Navy
    - Maintenance of water tight integrity of ships through strict Hull Inspection, Maintenance and trials.
    - Preparation of PPM(Planned Preventive maintenance) schedule for new Naval Ships.
    - Scheduling dry docking and periodic refit of ships.
    - Preparing scope of work for vessels, forwarding to Dockyard Authority for undertaking repair works, liaise till the works are completed.
    - Assisting dry dock authorities in docking and undocking.
    - Preparing drawings and recommendation for modification of structures.
    - Identification and procurement of stores and spares.
    - Training subordinates. Having an upper hand in counseling and motivation.
    - Ability to work under pressure.
    Education
    Equivalent Degree Mechanical Engineering with specialization in Ship Building and Naval Architecture.
    - Diploma in Mechanical Engineering with specialization in Ship Building and Naval Architecture.
    - Short course in Russian Equipment.
    - Advance Management Course. INS Agrani-Coimbatore.
    - Advance Leadership Course. INS Agrani-Coimbatore.
    - Holding valid Indian CDC.
    - Certificate course in Nuclear Biological and Chemical Defence including Damage Control and Fire Fighting (NBCD). INS Shivaji-Lonavla.
    - Certificate Course in Industrial Security. From IIS Nasik.
    - Received professional awards from SAIPEM while working in conversion project FPSO Aquila at Dry Docks World Dubai.
    - English, Hindi, Urdu, Assamese, Bengali, Russian(basic), Arabic(Reading)
    - Windows XP, Ms Word, Excel, Power point, SAP B2B, Mainframe, Internet, email etc.

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    RESUME

    RESUME
    V.D.V.CHALAPATHI
    Email : dwarakavudi AT gmail.com

    Career Objective
    To secure a challenging position in the Electrical field and to fully utilize my
    Skills in the field. Also to pursue my job with challenging responsibilities this helps
    The Company and me to grow in tandem.
    Academic Profile
    - SSC with 58%, v.z.p.h school, narayanapuram.

    SOFTWARE SKILLS :
    - Operating Systems : Windows98, Windows XP.
    - Packages : M.S-office
    Technical Skills
    - ITI electrical from Denduluru ITI with 84%
    - Hardware & networking
    Experience Summary
    3years Experience in the field of Electrical Projects, Operation & Maintenance in ultimate continuous process industries. Present Employment
    Working as a shift supervisor IN M/S SILICA CERAMICA PVT. LTD.
    (Narayanapuram, Unguture, west Godavari District.)
    Responsibilities

    - Installation, maintenance and Trouble shooting of AC variable Frequency Drives up to 315KW. (Make : ABB, OMRON & YASHKAWA)
    - Operation & Maintenance 1250 KVA, 500 KVA Diesel generators. Make
    - Operation & Maintenance of PCC’S, MCC’S and D.B’S
    - Maintenance and Trouble shooting of all Process Equipment. (Continuous Ball mill, Spray Drier, Presses, Driers, Kilns and Polishing Edge cutting machines & Easy lines etc.,)

    Project Experience
    - Commissioning of PCCs, SMDBs & MCCs.
    - Commissioning of Control Panels of Press, Kiln, UPS & Emergency diesel generators (40 KVA), Spray Drier, Glaze line panels, Variable frequency drive panels.
    - Commissioning of Loading and Unloading Machines, Polishing
    Edge cutting machines and Easy LINES
    Strengths

    - Ability to work in groups as well as independently with minimal
    Supervision.
    - Ability to handle multiple tasks and works independently as well as
    In a team
    - Experienced in interacting with Technology groups.
    - Process good communication skills and Inter- Personal skills.
    - Experience in automation with PLC’S.

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    pleaes check it my resume

    CURRICULUM VITAE
    Dileep.A
    Email :dilraju123456 AT gmail.com
    Objective : To build a strong career in the industrial sector and improving the standard of the firm by involvement of my hard work in all fields of the job given to me and energizing my surroundings to achieve the highest expectation of the firm.
    Technical Qualification : : –(1) I.T.I in Electrician (2008-2010) passed with 82%
    VISWABHARATHI I.T.C. KOTHAVALASA,
    VIZIANAGARAM.
    (2) Working Knowledge in Computer application Software
    (M.S. Office) (web designer) 2 years Experience

    Academic Qualification; : –(1) Studying (I.T.I Electrician) at VISWABHARATHI I.T.C.
    KOTHAVALASA, VIZIANAGARAM DIST.
    (2) S.S.C Passed on JUNE 2006 with 52% at Z P HIGH
    SCHOOL - R VENKATAPURAM

    Total Work Experience : – 1 YEAR Experience (FOURESS ELECTRIX ENGINEERS &
    Contractors)

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    electrical eng job

    good evening hi

  7. Post Count Number #7
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    resume

    RESUME
    Name : SIVAKAMESWARA RAO NELLURU
    Email ID : sivakameswar AT gmail.com
    Career Objective :
    To secure a challenging position, I assure effective contribution of my skills, possessing competent technical skills.
    EXPERIENCE :
    1.5+ Yrs of Experience.
    CURRENT PROFILE :
    I have been working as Asst. Engineer in Mechanical Department, Supervising and Maintaining in CONCAST FERRO INC, DUSI.
    Educational Qualifications :
    S.No Qualification Institution University/Board Year of Passing % of marks
    1. B.Tech (Mechanical) AITAM, Tekkali. JNTU, kakinada. 2005-2009 62.08%
    2. Intermediate Sri Chaitanya Junior College, Srikakulam. Board of Intermediate Education, A.P 2003 – 2005 63.9%
    3. SSC Sri Vani High School, Amadalavalasa. Board of Secondary Education, A.P 2002 - 2003 80%
    Software Skills :
    - Languages : C, C++, JAVA.
    - MS-Office : MS-Word, MS-Excel, MS-PowerPoint.
    - Mechanical Software : AUTO CAD, CATIA.
    PROJECT DETAILS
    MAIN PROJECT DETAILS
    TITLE : “Design, Fabrication & Experimental Analysis of VORTEX TUBE”.
    TEAM SIZE : 6 members.
    DURATION : 4 Months.
    AREA/LOCATION : Mechanical Dept., AITAM, Tekkali.
    DESCRIPTION : It is a device which uses compressed air as a power source, produces hot air from one side and cold air from other side simultaneously.
    MINI PROJECT DETAILS
    TITLE : “PRE FABRICATION AND SUB ASSEMBLY”
    TEAM SIZE : 6 members
    DURATION : 4 Weeks
    AREA/LOCATION : SHIP CONSTRUCTION, PRE FABRICATION Dept.,
    HINDUSTAN SHIPYARD LIMITED, VISAKHAPATNAM.
    DESCRIPTION : Deals with various types of welding techniques & making of panels on skids and sub assembly of panels of ships.
    FIELD OF SPECIALIZATION :
    - Preparation of P.O.Rs, P.Os & inspection reports of materials & equipments.
    - Experience gained in Blast Furnace
    Maintenance of Pumps
    Maintenance of Conveyors
    Maintenance of Compressor
    - Having capacity to manage the team people as team leader.
    - Having knowledge in basics of Electrical, Instrumentation items.
    - Responsible for implementing safety measures at work site.
    - Having Capable to take more work loads & perform efficiently under any pressure.
    Achievements :
    - Earned 1st prize in singing at school level.
    - Bagged 1st Prize for efficiency in the “WORD POWER” competetion-2007 in Aditya Institute of Technology And Management, Tekkali.
    - Obtained a certificate for participation of the paper “PHOTO VOLTAIC CELL” in National Level Paper Presentation Contest-2008, in Aditya Institute of Technology And Management, Tekkali.
    - Got 1st prize for participation of the paper “SAFETY” in Essay Writing Competition-Mar’2010 in the eve of 39th Safety Day Celebrations in Concast Ferro Inc, Dusi.
    Extra Curricular Activities :
    - Played role of a representative in annual function at school level.
    - Organized Industrial Tour Visit, as a coordinator from AITAM, Tekkali in the year-07.
    - Organized the Quest “INERTIA-09” as a team representative member and accountant from AITAM, Tekkali in the year 2009.

    Declaration :
    I hereby declare the above information provided by me is true to the best of my knowledge.
    PLACE : AMADALAVALASA
    DATE:
    (N.SIVA KAMESWARA RAO)