April 8th, 2011, 11:18 AM
Post Count Number #1
IJT addict
Wireless Instrument Maintainer : Resume CV
CURRICULUM VITAE :
Name : sudhakar upadhyaya
Email : sudhakaru25 AT gmail.com
Educational Qualification :
Sl. No. Qualification Board/University Year of passing Subject taken Marks obtained Division:
01 Matriculation U P Board 1970 Science, Maths, English, 56.8% 2nd Div 02 Intermediate U P Board 1975 English, Hindi, Social Study 43.0% 3rd Div 03 ITI (Elect.) ITI,Chandausi (UP) 1978 Elect. 65.7% 1st Div
WORK EXPERIENCE :
01. From 04/11/1976 onwards worked in 3rd Signal Btn. CRPF with the capacity of HC/RM, Gr.II
02. Break up of different capacities in NTPC w.e.f. 20/01/1982 to till date
Sl. No. Post Period Deptt. Organisation:
01 Wireless Instrument Maintainer Gr.II Fm 20/01/82 to 31/12/85 MGR (O&M) NTPC/Singrauli, Distt. Sonebhadra (U.P.)
02 Wireless Instrument Maintainer Gr. I Fm 01/01/86 to 30/06/87
03 Jr. Foreman (S&T) Fm 01/07/87 to 30/06/90
04 Foreman Gr. II (S&T) Fm 01/07/90 to 31/12/93
05 Foreman Gr. I (S&T) Fm 01/01/94 to 31/12/97
06 Sr. Foreman (S&T) Fm 01/01/98 to 31/12/2000
07 Asstt. Engineer (S&T) Fm 01/01/2001 to 31/12/2004
08 Sr. Asstt. Engr. (S&T) Fm01/01/2005 to 31/12/2006
09 Engineer (S&T) Fm01/01/2007 to 31/12/2010 NTPC/Rihand and NTPC/Singrauli
10 Sr. Engineer (S&T) Fm01/01/2011 to till dateNTPC/Singrauli, Distt. Sonebhadra (U.P.)
Experience :
Presently working in NTPC/Singrauli (MGR) deptt. with the capacity of Sr. Engineer (S&T), and looking after the following maintenance activities as well as other works of the deptt.
We are having our own signaling system for coal rake movement to meet the coal requirement for Super Thermal Power Station. The signaling (MACLS) system is facilitate with Panel Interlocking and Route Relay Interlocking.
Activities :
1. Maintenance and failure rectification of signaling system.
2. Maintenance of Wireless sets.
3. Maintenance of battery banks.
4. Maintenance of electrical and electronic equipments.
5. Maintenance of self designed unloading system of bottom discharge wagons.
6. Working on SAP and ERP.
7. Raising indents for procurement of material on SAP system.
8. Applications of ESS.
9. Knowledge of SAP system by Raising Indents, SIVs, note sheet etc.
10. Imported coal rake movement and unloading activity of coal at Track
Hopper of Thermal Power Station
11. Managing and motivating the staff by giving the tips of maintenance, 5-S, professional circle, Quality Circle, Safety aspects, Firefighting etc.
12. Miscellaneous activities of MGR work shop.