Edac Engineering : Spic Gel : Dubai/ UAE Abu Dhabi : Shutdown Maintenance : Project Manager
Edac Engineering (Spic Gel)
http://www.edacengineering.com/
Company Profile
EPC Company
Experience:
9 - 13 Years
Location:
Dubai/ UAE
Education:
UG - B.Tech/B.E. - Mechanical
PG - Post Graduation Not Required
Industry Type:
Oil and Gas/ Power/Infrastructure/Energy
Functional Area:
Site Engg., Project Management
Posted Date:
24 Jul
Job Description
Supervision of maintenance & overhauling of rotating & static equipments
. Handling break down Maintenance & Trouble Shooting, commissioning of equipments like pumps, heat exchanger, columns, heaters etc
. Raising purchase requisition, material inspection, vendor coordination.
. Preparations of Preventive Maintenance schedules & compliance.
. Well versed with International standards & codes like ASME, API,ANSI, Welding procedure etc.
. Implementation and adherence to safety hygiene and quality standards.
. Annual budgetary, cost control, inventory control & resource planning.
. Planning, Scheduling, Organizing, Staffing & Controlling Of Plant Shutdown and Breakdown, Boiler Shutdown and Breakdown maintenance
. Implementation of project for new pthalic anahydride and DOP plant.
Desired Candidate Profile
Supervision of maintenance & overhauling of rotating & static equipments
. Handling break down Maintenance & Trouble Shooting, commissioning of equipments like pumps, heat exchanger, columns, heaters etc
. Raising purchase requisition, material inspection, vendor coordination.
. Preparations of Preventive Maintenance schedules & compliance.
. Well versed with International standards & codes like ASME, API,ANSI, Welding procedure etc.
. Implementation and adherence to safety hygiene and quality standards.
. Annual budgetary, cost control, inventory control & resource planning.
. Planning, Scheduling, Organizing, Staffing & Controlling Of Plant Shutdown and Breakdown, Boiler Shutdown and Breakdown maintenance
. Implementation of project for new pthalic anahydride and DOP plant.
Key Work
. Maintenance, commissioning and overhauling of centrifugal pumps, Multistage pumps, co axial split casing pumps.
. Maintenance of Screw compressors, Reciprocating compressors, Overhung blower
. Water tube Boilers, Agitators, Cooling tower fans, Flakers, Belt conveyors,
Roller conveyors
. Maintenance and commissioning of static equipments such as Multi tubular fixed catalytic reactors
. Vacuum distillation columns, Various types of Heat exchangers, Cooling Tower
Should have Gulf Experience. Candidates are preferrable only from Petrochemical industry, Refinery & Oil Sectors.
Job Location:Abhu Dhabi
Executive Name:
Ms.Deepa
Address:
Southern Petrochemical Industries Corporation Limited
SPIC HOUSE,
No.88 Mount Road,
Guindy.
Chennai,TAMILNADU,INDIA 600 032
Email Address:
deepa@edac.in
Telephone:
91-044-22350558
Reference ID:
Proj Mgr-Maintenance
Keywords: shutdown manager
-
May 26th, 2009, 06:42 PM
Post Count Number #2
Re: Edac Engineering : Spic Gel : Dubai/ UAE Abu Dhabi : Shutdown Maintenance : Project Manager
KAMALAKANNAN.D
Cell (+91) 9840116620 ~ E-Mail: nasa08@rediffmail.com
________________________________________
Seeking assignment in Supply chain management / Production Operations/Project Management / Process Enhancement in with a growth oriented organization of repute
Professional Snapshot
Over 8 years of experience in Supply Chain Management, Production Operations, Process Enhancement, as well as Quality Control. Currently designated as Sr Engg-Materials In Durr India Pvt Ltd. Adept at handling the complete operations entailing planning, resource utilization, maintenance & manpower management. Adept at Production Planning & scheduling, Man Power Planning, and related jobs. A keen planner and strategist with skills in team building, organization building capability and proven abilities in planning and managing resources both; man and material.
Organizational Details
Since Dec’00-Jul’06 with L&T Demag Plastic Machinery Ltd. as Supply chain management / Production operations.
Growth Path
- Dec’00-Dec’2002 SST (first six month QA then as a buyer)
- Dec’2002-Mar’2005 Buyer/vendor development
- Apr’05-Feb’ 07 Production In-charge (Assy of Injection Moulding machines)
- Mar’07-Till Date Sr Engg-Materials (Durr India Pvt Ltd)
Sap Experience: 2 years and above in functional side over MM module.
Supply Chain Management :( Technical Buyer/Vendor development) Mar”07-Till Date
- Individually handled the projects like TATA Lucknow, TATA Singur, Ford India Ltd, Volkswagen, Mahindra etc., paint shop fabrications and its bought touts like Fan, Pump, Heat Exchanger, Valves, Special coatings, Valves etc.,
- Involved in the HVAC Ducting, Piping, and Insulation with design department to make into the lean concept.
- Involved in preparing scope of work for entire paint shop fabricated items erection like PT_ED tanks, Tunnels, Ovens, Heat Exchanger, Utility and process piping, Ducting for entire paint shops and its insulation etc.,
- Contributed in Global sourcing committee for localization.
- Played a key role in reducing the wastage time in fabrication by applying the optimization with the available vendors.
- Indigenized imports components like Ovens, tanks, heat exchangers, conveyor machining components etc.,
- Handling individually 22000 tons of fabrication over the span of 18 months time for the procurement activities which involves the vendor selection, placing the RFQ, Negotiation etc.,
- Localization of purchasing parts had implemented by making of data sheets inline with design.
- Achieved minimum 15% discount over the each order by applying Zero based costing.
Production Operations Apr’05-Feb’07
- Executing production operations in coordination with the other and deciding the best suitable production & machining process for the job parts.
- Managing the workmen for achieving the periodic production targets and responsible for developing and implementing technology to improve productivity.
- Scheduling material procurement plans and ensures optimum inventory level and carrying out the production as per schedule.
- Preparing and managing data recording activities and relevant documentation for production operations for the unit and maintaining MIS/ reports for facilitating decision making by the management.
Supply Chain Management:(Buyer/Vendor development) Dec’02-Mar’05
- Monitoring and analyzing the loss in transit and undertaking measures to control the same.
- Interfacing with factories for communication of delivery schedules, developing production plans and following up for the same to ensure on time delivery of consignments at clients’ end.
- Managing various activities like ordering to the MRP qty, stock verifications and responsible for handling problems and troubleshooting for the smooth flow of operations.
- Played a key role in reducing the wastage time in inspection by developing the supplier to Self-certification.
- Played a significant role in reducing ordering time by invading in single part no (TOP BM no:) set theory.
- Distinction of developing local vendor for import components by supporting proper tool and by manufacturing process for the smooth flow of operations.
- Totally handled 700 categories of components such as bought out for L&T drgs, bought out for catalogue items like brgs,seals,hyd cylinders,etc.,
- Developing new vendors for prototype products (New innovations).
- Bringing the component in JIT concepts since it has made in kit concepts.
Quality Assurance Dec’00-Dec’02
- Ensuring compliance to the production standards & continuous improvement in process capabilities during the manufacturing process.
- Implementing system & process changes for qualitative improvement in productivity & for reducing the rate of rejection.
- Adhering compliance of various quality measures thereby by ensuring quality of the final product in compliance with quality standards.
Process Enhancement / Cost Control
- Handling operations for improvement in existing products based on market trends & requirements.
- Monitoring production processes as well as implementing VA/VE initiatives to achieve standardization & reduce costs.
- Achieving productivity improvements & eliminating non-value added operations.
- Executing cost saving techniques/ measures and modifications to achieve substantial reduction in Operation & Maintenance expenditures and work within the budget
Notable Contributions
- Successfully reduced the rejection rate by process improvement (Snap Gauge Developed) and also reduced the rejection rate by educating supplier about the functional requirement.
- Instrumental in annual cost reduction of around 5 to 6 Lakhs through value engineering by alternate method of MTL selection, manufacturing method without compromising the quality.
- Distinction of developing local vendor for import components by supporting proper tool and by manufacturing process for the smooth flow of operations.
- Successfully introduced set theory for local components for injection unit as well as Mech assy components with the focus on enhancing operations.
- Effectively reduced the assy time by introducing mandrel, jacks, etc. & served as green belt in six sigma project for introducing modular assy thereby reduced through put time from 14 days to 8days per M/c.
- Actively involved in making Fool Proof for some critical piston assy by changing drawings through ECR.
- By Global sourcing achieved a cost reduction of 6 Lakhs/month for SHS & RHS form china.(WooZung)
Academia
- S.S.L.C. from Sir M Ct. M. Hr. Sec. School, Chennai in 1997.
Professional Qualifications
- ME in (System engg & Operation Research) form the Anna University (2006-2009)
- AMIE in Mechanical Engineering (A/540003/2) from the Institution of Engg (India), Kolkata in 2005.
- Advance Diploma in Hardware & Networking from Advantage Pro in 2001.
- CAM from Canada India Institutional Co-operation Project, DOTE, Guindy in 2000.
- Diploma in Mechanical Engineering from Central Polytechnic, Tharamani in 2000.
- AUTO CAD 2000 from Canada India Institutional Co-operation Project, DOTE, Guindy in 1999.
IT Skills
Operating System : MS Dos, Windows 9x / 2000 / XP / ME
Software Packages : Office Automation (MS Office 2000)
Web Technologies : HTML, XML,Java,C++,UML
Personal Details
Data of Birth : 19th May 1982
Passport : B2775883 (27.9.2000 to 26.9.2010)
Address : No. 111. 5th Cross Street, T.P. Chatiram, Chennai – 600010
Marital Status : Single
Languages Known : English, Tamil
Present CTC : 5 Lakhs
Expected CTC : 6.5 Lakhs
-
February 24th, 2010, 02:10 PM
Post Count Number #3
Aaron herbert singh
Guest
Re: Edac Engineering : Spic Gel : Dubai/ UAE Abu Dhabi : Shutdown Maintenance : Project Manager
Email: herbrtsingh AT gmail.com
Mobile: # 00966-543378113 (KSA)
Mobile: # 0091-9894847090 (IND) AARON HERBERT SINGH G
Phone: # 0462-2575859 (IND) (Mechanical Piping Engineer)
CAREER OBJECTIVE:
Work with fullest dedication in a competent environment that can promote my abilities through achieving the challenging tasks with precision in a qualitative manner aggregating ample practical exposure in professional field.
GULF EXPERIENCE:
- Handled construction works as Mechanical piping construction Engineer for SAUDI ARAMCO’s Waste water Project under BEMCOARABIAN & TRUBARABIA contractors for a period of 7 months (March ’09-oct ’09 )
- Handled shutdown works as QA/QC Engineer for JUBAIL fertilizer “AL-BAYRONI” for SABIC’s Di-oxy-Phenyne plant and diethyl propane plant under AYTB, contractor for a period of 2 months
- Handled shutdown works as QA/QC Engineer for JUBAIL fertilizer “SAUDI KAYAN” for SABIC’s under NSH contractor for a total period of 2 months
- Currently handling Maintenance Work as QA/QC inspector for “APPC” for SABIC’s under SISCO contractor
WORK EXPERIENCE:
- Erection works handled as “site engineer” for “SUNNET- INDIA ltd” (Approved by Federal Government of INDIA) located at Chennai, INDIA (July ’07-feb ’09)
RESPONSIBLITY:
- Review scope of work for the project, specifications, procedures and requirements such as approved for construction drawings P&ID, isometric, project quality plan, ITP, WPS, PQR and codes, standard (ARAMCO/ SABIC).
- Site surveillance to ensure the compliance of construction and monitoring inspection, erection and installation.
- Material handling and execution of fabrication, welding, site surveillance and monitor erection, installation activities of structural, piping, and equipment
- Checking materials as per codes and process standards specifications (ASME B31. 3, API 1104,ASTM)and built revision of isometric drawing and P & ID,
- Verifying calibration records for testing and inspection equipments and witnessing tests, visual, dimensional, hydro- testing of Pipe lines.
- Verify and Inspection of fit-up & welding joints of shop fabrication of piping spools and supports and insulation, clearance of QC punch list items, QA/QC documentation, inspection report preparation, (RFI).
- Coordination with client/contractor and subcontractor corrective and ensure all approved welding procedures, certificates as welders are qualified to carry out specific welding activities in strict compliance with applicable codes.
- Inspection of the welding of the piping work and witnessing of the associated NDT.
- To ensure that calibration equipment / instrument poses proper calibration certificate for validation and record are maintained.
- Conduct line checking orientation, punch listing and line re-instatement for piping installation based on the test hydro test packages with safety procedures according to standards.
TECHNICAL SKILLS:
- Platform: Windows XP and 2000.
- Package : AutoCAD, PRO-E wildfire.
- NDT II : RT, UT, MPT, DPT.
- Well versed with SABIC and ARAMCO Engineering Standards.
- Certified level II in RT, UT, MPT, DPT on non destructive testing.
INDUSTRIAL TRAINING:
- Underwent Training at INTEGRAL COACH FACTORY, Chennai (Manufacturers of Railway Bogies).
- Underwent Training at WORLD WIDE SERVICES, Tuticorin (Marine Surveyors, Valuers & Loss Assessors).
- Underwent Training at SHAKTHI FOUNDARIES LIMITED, Erode.
EDUCATIONAL QUALIFICATIONS:
- B.E. (Production Engineering) from Karunya Institute of Science and Technology, Coimbatore, affiliated to Anna University in 2007. (Secured with 6.09 CGPA)
EXTRA CURRICULAR ACTIVITIES:
- Represented as captain for college football team in Anna University matches.
- Secured Second place in south India level Football Tournament.
- Played a significant role in our football team which emerged as runner up in TIES
AREAS OF INTEREST:
- Quality inspection.
- Erection, Fabrication & construction
PERSONAL DOSSIER:
Name : Aaron Herbert Singh. G
Father name : Gnanasigamani. R
DOB : 10th January 1986
Sex : Male.
Marital Status : Single.
Nationality : Indian.
Passport No : G4695170 Valid till August 2017.
Languages Known : Arabic, English, Hindi, Tamil, and Malayalam
DECLARATION:
I hereby declare that the above mentioned information is true and correct to the best of my knowledge and belief.
AARON HERBERT SINGH
-
July 21st, 2011, 06:47 PM
Post Count Number #4
CURRICULUM VITAE
GOPALA KRISHNAN.B
gkkrishnan007 AT gmail.com
OBJECTIVE
To contribute my perseverance and talents for the development of the Organization and to shape myself as a sagacious professional while serving the Organization.
PROFESSIONAL SYNOPSIS
- Total of 6 + years experience in Electrical field
- Two years worked as Electrical Supervisor in Saudi Arabian oil company project (Saudi Aramco)
- Two years worked as Electrical Supervisor Imperial Trading & Contracting Company-Qatar
- One year Worked as a Operation & Maintenance Supervisor in CBRE at RMZ Infinity-Bangalore
- One year Worked as a Operation & Maintenance Technician in HAL(Hindustan Aeronautics Limited)-Engine Division-Bangalore.
- Diploma in Electrical and Electronics.
EXPERIENCE DETAILS IN ABROAD
Organisation : M.R Al khathlan Est., Saudi Arabia.
Client : Saudi Arabian oil company (Saudi Aramco)
Designation : Electrical Supervisor
Duration : June 2009 to June 2011
1. Project : Replacement of Electrical Equipments AT
GOSP (Gas and Oil Separation Plant)
PROJECT OBJECTIVE
The objective of the project is to replace the ageing obsolete 4.16 KV switchgear’s and MCC’s ,480 V MCC’s in switchgear van’s and the 115KV systems in the transformer yard equipped with obsolete switchers and power transformers at 5 southern area GOSP crude handling facilities with The 115KV, 4.16KV and 480V systems are secondary selective or double ended system
This power automation system replaced with advanced RTU and OSAS (Open substation automation system) .The all power and automation system fully equipped with IED and SST devices .Crude handling facilities can control by ESD and DCS, PLC systems .
DUTIES AND RESPONSOBILIES :
- Installation of 115KV double ended transformer yard systems. It consist of 108KV Surge arresters , 108KV Capacitive voltage transformers with PQ sensor,.115KV ,1200A SF6 circuit breakers , 115KV Disconnect switches(double break centre rotation)
- Erection, installation of 26MVA, 115/4.16KV with AOLTC transformers, 2.6 MVA 4.16KV /480V Transformers. Transformers are Self cooled(OA) and first stage force cooled(FA)
- Erection , installation of 4.16KV Secondary selective switchgear with 3500A, 1200A VCB’s and 4.16KV MCC’s (SCHNEIDER –SQUARE D ) with 400A vacuum contactors
- Installation of 480V Secondary selective switchgear with 300A, 1600A ACB’s with SST and 480V MCC’s system’s .Material receiving, installation of 5KV,480V cables and multi core, pair cables
- Familiar with protection systems for Buses, transformers,SF6 breakers, feeders with advanced IED and SST relay systems such as (SEL 387E,487B,2411,751A,710 and Magnum MDS 832).
- Implementation of RTU and OSAS system for protection and control systems for SF6 breakers , Incomers and General substation alarms and process area feeders are controlled by DCS and PLC system
- All the loads of the Desalting Facilities are transferred from old Substation to New substation such as 3000HP, 4.16kv motors, 480V loads (Pumps, MOV’s, Transformers, CP Rectifier, Distribution and lighting panels, Flood lighting’s.
- Familiar with Termination of 400mm2, 240mm2, 180mm2, 35mm2 cables and all size of LV cables and Multi core cables.MV
- Installation of Substation grounding grid Using Exothermic Welding, All equipments grounding and Bonding, System grounding (Solid Grounding, Low Resistance Grounding(2.4KV,10 Sec)
- Also familiar with Battery Banks , Battery Charger, HVAC, FACP systems
2.PROJECT : UPGRADE SEWAGE TREATMENT PLANT WASTE WATER
(RABIGH)
PROJECT OBJECTIVE
The objective of the project is to upgrading community sanitary wastewater treatment facilities by installing the new membrane bioreactor(MBR), pumps and associate equipments with 380V Double ended switchgears and MCC,EMCC,ATS,MOVP
This process are controlled by PAC system (GE Fanuc)
DUTIES AND RESPONSOBILIES :
- Erection, installation of 750kVA, 4.16KV/380V transformer. 380V switchgear with 1600A, 800A ACB’s and 380V, 800A, 600A MCC’s.
- Erection, installation of 380V,400A ATS For EMCC
- Cable laying and termination for Pumps, MOV’s, Distribution and lighting panels, Flood lighting’s
- Familiar with termination of 240mm², 180mm²,120mm²,35mm², ,25mm²,16mm²,10mm² cables and all size of LV cables and Multi core cables.
- Installation All equipments grounding and Bonding, System grounding (Solid Grounding)
- Installation of RGS,EMT,PVC conduits and Electrical Duct Banks
Organisation : Imperial Trading & Contracting Company-Qatar
Client : Sheikh Nasser Faleh Al-Thani
Consultant : South West Architecture
Designation : Electrical Supervisor
Duration : 2007 to 2009
DUTIES AND RESPONSOBILIES
Hands on experience in Planning, Estimating, Implementing and Installation of
Following MEP tasks :
- Analyzing Electrical, Telephone, HVAC, Plumbing, Drainage, Fire Alarm, Fire Fighting, CCTV and PA system Technical drawings in coordination with all civil drawings.
- Planning for all the MEP works in accordance with cash flow and early finish of the project for the company.
- Implementation of the work efficiently in site together with quality by supporting the team in all aspects.
- Arranging and conducting site inspections with consultants for every stage wise completion of MEP works.
- Estimating materials quantity required for MEP works.
- Making markings for excavation of trenches for external underground services like (power cables, telephones, sewer drainage, storm water drainage, waterline, Irrigation and fire fighting services).
- Giving elevations and invert levels for constructing manholes for external underground electrical, drainage and telephone services.
- Internal & External Electrification like lighting
EXPERIENCE DETAILS IN INDIA
1. Organisation : Sri Narayana Enterprises, Bangalore.
Client : CBRE at RMZ Infinity-Bangalore
Designation : Electrical Supervisor
Duration : 2006 to 2007
2. Organisation : VEDA PRAKASH ELECTRICAL, Bangalore.
Client : HAL(Hindustan Aeronautics Limited)-Engine Division
Designation : Electrical Technician
Duration : 2005 to 2006
JOB RESPONSIBILITY IN INDIA
- Maintenance of DG operation (1500KVA*12nos) Cummins, MTU &
Caterpillar
- Maintenance of Transformer (1600, 1500 & 2000KVA) .
- Maintenance of Chiller, Pump and split AC.
- Maintenance of lighting and power house including panel board
- Maintenance of VCB, ACB Circuit Breakers
- Maintenance of Motor, Fans, Starter And Heaters Etc,
- STP (Sewage Treatment Plant) & Water Body Operation
- HT, LT operation and maintenance
EDUCATIONAL QUALIFICATION
DIPLOMA in Electrical &Electronics Engineering
I hereby declare that the above information is true to the best of my knowledge and belief.
Place : Signature
Date : (GOPALA KRISHNAN)
-
December 12th, 2011, 07:45 PM
Post Count Number #5
CURRICULUM VITAE
SABIR MALLICK
Email - id : - mallick_1965 AT yahoo.co.in / kalamallick AT yahoo.com
Qualification : Higher Secondary (P I E C, Patna)
Technical Qualification : DIPLOMA IN MECHANICAL ENGINEERING 1985 TO 1988
: NAVEEN RAJKIYA POLYTECHNIC (first division)
Details of working experience
Name of the organization : ABB Spa (Italy)
Client : Bp/Sonatrach /Stat oil
Designation : Insulation & Refractory Expert
Period : 05th April to 21st July TAR-2011
Name of the organization : JGC / KBR
Client : Pearl GTL shell
Designation : Refractory & Insulation Supervisor
Period : 6th March 2010 to 30Th February 2011
Name of the organization : IHI CORPORATION (JAPAN)
Client : Sonatrach (Algeria) GP1/Z PHASE 111 Project,
Designation : Fire proofing & Insulation Supervisor
Period : 27th May2009 to 19th Feb 2011
Name of the organization : JGC MIDDLE EAST FZE
Client : Dolphin Energy Onshore upstream Project (Doha Qatar)
Designation : Refractory & Insulation QA/QC
Period : October 2006 to Till December 2007
Name of the organization : Mitsubishi Heavy Industries Ltd.
: DP Project Site (Haldia)
Client : Mitsubishi Heavy Industries Ltd. (Japan)
Designation : Sr. Insulation Supervisor
Period : 15th April 2000 to 20th July 2000
Name of the organization : TOYO Engineering India Ltd.
: Sister concern of TOYO Engineering Corporation, Japan
Client : Haldia Petrochemicals Ltd.
Designation : Sr. Insulation & Refractory Supervisor (Naphtha Cracking Unit)
Period : 1st April 1999 to 31st March 2000
Name of the organization : Meisei International Pte ltd (Singapore)
Client : Mitsui Bisphonal Ltd.
Designation : Sr. Insulation Supervisor
Period : 11th October 1998 to 9th March 1999
Name of the organization : Larsen & Turbo (Oman) LLC
Client : Oman Steel
Designation : Sr. Refractory supervisor & Ceramic Module/ Insulation
Period : 15th September 2000 to 27th September 2001
Name of the organization : Consolidated Contractors International SAL (CCC)
Client : ADGAS 3rd LNG Train Project Das Island (Abu Dhabi) UAE
Designation : Sr. Insulation Supervisor
Period : 31st March 1994 to 17th March 1995
Name of the organization : Ahmed Mansoor AL A Ali Co.
Client : Mitsubishi Heavy Industries Ltd. (GPIC Bahrain)
Designation : Sr. Refractory & Insulation Supervisor (Primary & Secondary
Period : 10th January 1997 to 15th September 1998
Name of the organization : Cape East Ltd
Client : Fujeriah Cement Industries UAE
Designation : Sr. Refractory & Insulation Supervisor
Period : 3rd May 1995 to 20th December 1995
Name of the organization : Karrena Germany Ltd SAFCO Project Saudi Arabia
Client : UDHE ARABIA LTD.
Designation : Sr. Supervisor Refractory works primary & Secondary Reformer
Period : January 2005 to May 2005
Name of the organization : Karrena Arabia Company Ltd (Saudi Arabia Hadded)
Client : DANIELI (ITALY)
Designation : Sr. Supervisor Refractory works for Walking
: Earth furnace (120 Ton per hours)
Period : May 2005 to December 2006
Post Applied For Senior Refractory & Insulation Supervisor
20 years experience in different project site, in India & Abroad, all type of furnace work and insulation work experience:- in detail, Naphtha Natural Gas Reformers, Process Fire Heater, Petrochemical Cracking Furnace, Catalytic Reforming unit, Tunnel Kilns, Electric Furnace Ladle Refining Furnace, Thermal Incinerator, In Line Heater and DSO Incinerator, Thermal Reactor, I ma Work PLIBRICO Japan co. Ltd, GOUDA vuurvast, KARREENA Gmbh, KARREENA Saudi Arabia , JGC MIDDLE EAST FZE,
KOBE STEEL BHARAIN GIIC, TOYO ENGINEERING CORPORATION, MITSUBUSHI HEAVY INDUSTRIESE LTD, TOYO ENGINEERING INDIA LTD, LARSEN & TOUBRO OMAN LLC, CCC ABUDHABI, Meisei International Pte Ltd Singapore, CAPE EAST Abu Dhabi, INECO ALMANA From Ras Gas & Qatar Gas, IHI CORPORATION JAPAN GP1/Z PHASE 111 Project Algeria, JGC/KBR PEARL GTL SHELL QATAR, ABB Spa (Italy) From Bp/Sonatrach /Statoil TAR 2011- (JV Gas Algeria)
Training & Seminars
- Safety induction training
- PTWS (Permit to work system) training
- Project quality plans
- got training by JGC/KBR for the insulation work of Pearl GTL SHELL Project Qatar
- got training by bp/ sonatrach/ statoil for the golden rules and authorized process PA for PTW.
Senior Supervisor/ Quality Control Inspector for Insulation/Refractory
Refractory / Insulation supervisor with all type of Refractory furnace work for the last 20 years in different Project site in India & Aboard.
Professional Experiences
I am adequately experience in the field of Thermal Insulation ( HOT & COLD) Acid / Alkali proof lining Refractory, Anti-corrosive treatment works and PUF- Insulation work and have worked in several Esteemed organizations in various plants such as fertilizer, chemical, Refinery, Petrochemical, Cement Plant, Steel Plant. Etc, I am familiar in all type of insulation and fabrication, cladding, fire proofing acid Proof lining, Water proofing work, Experienced in handling man power for a valuable output and doing all the paper works, I use to have meeting with subcontractors as well as with client for sorting out the Problems, Familiar in working as per P & ID and GAD and Isometric,
I am experienced in working with multinational employees of different back ground and field Specialization; I declare that the above statement is true to the best of my knowledge.
-
January 15th, 2012, 10:21 AM
Post Count Number #6
INSTYRUMENT TECHNICIAN
I Have getting 4 years exp. instrument field . and i have working in chemical with petrochemicals plant.
I know field and panel instrument calibration. and loop checking, troubleshooting of control loops.
-
June 9th, 2012, 11:38 PM
Post Count Number #7
QA & QC
M.Shanmuganathan
mshanmuganathan48 AT yahoo.co.in
Objective
To work in a challenging position and to contribute the best by fully utilizing my potential being a part of your esteemed organization.
Professional Knowledge
- Having good work experience in a Heavy Engineering Industry.
- Having more work experience in Production, QC / QA and Commercial
- Good exposure in Project Management.
- Possess good communication and interpersonal skills
Summary :
1 Over 41 Yrs of Experience in Heavy Engineering Industry at M/s Bharath Heavy- Electricals Limited
(A Government of India under Taking Company), Trichirappalli, Tamil Nadu – 620 014.
2 Exposure to manufacturing and QA/QC activities of Boiler Components, Heat Exchangers,
Pressure Vessels and Nuclear Steam Generators
3 Possess good communication and interpersonal skills
Work Experience :
1 Working with M/s.B.H.E.L, Trichy – 14, as a Craftsmen ( Fitter ) from 1965 to 1980
2 Working with M/s.B.H.E.L, Trichy – 14, in various Level from Jr.Engr to Senior Additional Engineer
II from 1980 to Feb, 2006
Experience in Production Department : (1965 to 1980):-
Manufacturing of High Pressure and Industrial Boiler Components such as Water Walls, Super Heaters,
Economizers, Re-heaters, Steam Cool Walls etc. Work involved in Material Preparation, Pipe Bending,
Panels Assembling, Hydro Testing, Painting and Dispatching to Shipping Department. Attending Complaint- work during Erection of Boiler Components at Sites (All over India).
Inspection work on assembling of Nuclear Steam Generators (NARORA STEAM GENERATRS) :-.
All stage inspection work like Fit-up, Assy, Moke up test for Tube Sheet Drilling, Tube Expansion check, Hole Finish Check, Tube to Tube Sheet welding - Minimum Leak Path Check, Hydro Testing. Helium Leak – Testing. Alignment Test using Optical Alignment Telescope. Welding inspection like Visual – Check, Liquid Penetrate Test, Magnetic Particle Inspection, Radio Graph Test, Ultrasonic Test etc., Heat Treatment like Spot Heat Treatment, Furnace Heat Treatment Chart Verification. Optical Pyrometer Check during Heat Treatment etc.
Inspection work in High Pressure Boilers :-
Water Walls, Super Heaters, Economizers etc. Heat Treatment, Hydro Test, Shipping Inspection work. Third Party Inspection Clearance from Boiler Inspectors, NTPC, LLOYDS, EIL, TATA Consulting Engineers.
Inspection work in the manufacturing area of Heat Exchangers and Pressure Vessels :-
Welding inspection, Assembling Tube Bundle, Tube to Tube Sheet Expansion, Tube end welding.
Minimum Leak-Path Testing, Hydro Testing, Heat treatment Chart Verification, etc.
Inspection work at Ancillary Development Industries :-
Structural Fabrications like Columns, Ceiling - Girders, Ducts etc. Machining Components. Valves Components
and Oil Field Equipments.
Inspection work in Procurement :-
Raw Material Inspection on Plates, Sheets, Pipes and Tubes, Fittings, Forgings, Castings etc
Verification of Raw Material Test Certificates. Getting Third Party Clearance from Boiler Inspector, NTPC, LLOYDS, EIL, and TATA Consulting Engineers.
Experience in Thermal Power Stations :-
High Pressure Boilers Maintance Work at Thermal Power Stations. Dadri (NTPC Power Station) :– Pressure parts maitanence Work. Talcher (Super Thermal Power Station):– Pressure Parts Maitanence, Evaluation of Thickness of all tubes to Asses the Remaining Life time.
Experience in Commercial Department : (2002 to 2006):-
All Commercial activities. Contracts Co-ordination Work with Customers. Production follow-up. Co-ordination work with Purchase Department, Engineering, Operation Planning & Control, Material Planning,
Sub Contracting / Vendors etc. Shipping and Site co-ordination work, Invoicing, Billing, Cash Collection from Customers.
Computer knowledge :-
1 Project Planning Management System
2 Working knowledge in MS-Word, Excel, Power-Point.
3 Internet Surfing / Email
Technical Qualification :-
“FITTER” – 1963 to 1965 at Govt : Industrial Training Institute, Palghat, Kerala State.
Academic Qualification :-
Secondary School Leaving Certificate – March’ 1963, at S.B.K. High School, Aruppukottai,
Virudhunagar District, Tamil Nadu 626 101.
Date of Superannuation : 24-02-2006
Retired from M/S.Bharath Heavy Electricals Limited, Trichirappalli-14, Tamil Nadu-620 014
On 24-02-2006 after the successful completion of 41 years service to the Nation in producing POWER.
Total Work Experience
Name of the Company Designation Period of Work
From To
Thiraviam Engineering Private Limited, Tuticorin Consultant / Quality 17th Nov, 2011 18th April, 2012.
M/s.Ribo Industries Private Limited, Trichy. Head / Quality 6th Aug, 2010 10th Sep, 2011
M/s.Acoustics India Private Limited, Trichy. Head / Quality Dec, 2009 5th Aug,2010
M/s.Ansaldo Caldaie Boilers India (P) Ltd, Trichy. Consultant / Quality May, 2007 Nov, 2009
M/s.Cethar Vessels (P) Limited, Trichy. Consultant / Quality March, 2006 May, 2007
M/s.Bharath Heavy Electricals Limited, Trichy-14 1965 - Fitter Gr II
TO
2006 - Sr.Additional Engineer April, 1965 Feb, 2006
I do hereby declare that the above furnished details are true to the best of my knowledge.
Yours truly,
[M.SHANMUGANATHAN]
-
July 18th, 2012, 04:27 PM
Post Count Number #8
mechanical engineering
i need a mechanical job, i am completed B.E-MECHANICAL ENGINEERING