    CURRICULUM VITAE :
    SYED AHMED KALEEMUDDIN
    Email : syed.hashmi383 AT gmail.com

    ABOUT ME :
    I am Civil Engineer Professional with around 3 years of Experience. Committed to reach departmental goals, My Experience in civil engineering technique, enables me to serve the beneficial services to my employers & Initiate my contribution to the organization into progressive levels by my knowledge & responsibilities.
    Being as Quantity Surveyor & Civil Engineer I have analytical mind & able to work in rigid time schedule & I developed my technical platform to give best & innovative engineering service in INDIA and GULF in QC & QS sector.

    PROFESSIONAL EXPERIENCE :
    Name of Organization Duration Year Designation :
    Carillion Alawi LLC OMAN 25th JANUARY 2009 to Till date 1 year 8 months Quantity Surveyor
    IMI Soft Engineering Pvt Ltd, BANGALORE 19th JULY 2007 to 18th NOVEMBER 2008 1year 6 months Junior Engineer

    Organization : CARILLION ALAWI LLC OMAN
    An Integrated Management System BS EN ISO 9001 :2008 ISO 14001:2004 OHSAS 18001:2007 PAS 99:2006.
    Carillion Alawi LLC is an undertaking of CARILLION plc of UK & is in OMAN in last 40 years having branches in Middle East, North Africa & Caribbean.
    Position : Quantity Surveyor
    Reporting : Commercial Manager
    Projects Worked in OMAN :
    Completed the Works in ROYAL OPERA HOUSE in MUSCAT (Client Royal Court Affairs i.e. Government Project) from JANUARY 2009 to DECEMBER 2009. (Total cost of project 119.5 Million Omani Riyals)(Total Area of project 80000 square meters)
    Worked on Project of MAJLIS OMAN (Parliament of Oman) (Client Royal Court Affairs i.e. Government Project) from JANUARY 2010 to till date (Total cost of project 179 Million Omani Riyals) (Total Area of project 101000 square meters)

    RESPONSIBILITIES & TASKS :
    Production of Productivity report
    Material reconciliation
    Preparation of final accounts
    Contra charges to subcontractor other than the scope of works.
    Obtaining and using site record sheets for use as part of an additional works submission.
    Agreeing measures with subcontractors or the client’s quantity surveyor
    Measure, quantify and value the works on site in accordance with construction drawings.
    Successfully claimed the Various EI’s from client.
    Successfully maintained & prepared the list of day works in compliant with the standard instruction like RFI CVI & SM for monthly claims client and contra charge to subcontractor.
    Contributed in monthly evaluation of the executed works & variation orders for claims of cost & duration of the contract
    Preparation of the labor productivity report for frame work
    Preparation of weekly 2 week LAP (look ahead plan) for incentivisation of frame work activities on the basis of working strategies according to project execution plan
    Assisting in preparation of loss and its prevention measure submissions
    Perform quantity surveying works and materials take-off to check accuracy of quantities in the Bill of Quantity (BOQ) and compare it with materials on site.
    Preparing & updating the coding system & the WORK BREAK DOWN STRUCTURE for the Framework construction.
    Take the lead in the development and maintenance of any periodic (daily, weekly & monthly) reports to keep informed on the project progress. These reports may include labor productivity, schedule status, Cost & Benefit Reports (CBR) on construction activities that are a part of the work.
    Preparing the quantity break down of materials & manpower
    Preparing & reviewing the lists of quantities for civil works.
    Involving in preparing sub contractors payment certificate.

    Organization : IMI SOFT ENGINEERING Pvt Ltd, (Telecom Infrastructure Service Consultant)
    An Integrated Management System ISO 9001 :2008 ISO 14001:2004
    IMI is a Telecommunication & Electrical tower design and Telecom tower construction contractor in all telecom circles of INDIA and in KSA.
    Position : Junior Engineer
    Reporting : Circle Manager
    RESPONSIBILITIES & ACHIEVEMENTS :
    Tower Foundation Inspection
    Verification of Excavation, Dimensions & material procured.
    Complete monitoring of the works & time management.
    Detail checking of Reinforcement, Quality & Quantity of Concrete as per given in the drawing & schedule.
    Checking of concrete thickness in foundation pad, chimney, Checking of Grade of concrete & Alignment of columns, Template fixing &Verification of tests report.
    Maintaining the concrete pour clearance record for poured concrete
    Preparation of weekly programmed for work to be done.
    Preparing monthly records with actual as per site.
    Building Structural Analysis
    Performing NDT (Non destructive test) to identify grade of concrete and reinforcement details & analyzing building stability.
    Preparation of structural drawing of existing building with physical dimensions & reinforcement details for design of telecommunication tower & to apply extra load over building

    EDUCATIONAL QUALIFICATION :
    DIPLOMA IN CIVIL ENGINEERING passed in MAY-2007 from Government Polytechnic, Gulbarga under Dept. of Technical Education, Bangalore.

    SUMMARY OF EDUCATIONAL BACKGROUND :
    Knowledge of Soil Mechanics in the outcome of the forces into the design of foundations & walls;
    Analyze, design & form the structure of buildings & other infrastructure to withstand gravity, earthquake & other forces;
    Develop technical solutions needed to solve or control water & soil behavior.
    Examining different environmental impact assessments executed from several proposed construction developments.
    Clear understanding of construction techniques of relevant laws and rules in practices;
    Impact of priorities in design change and variations
    Applied Mathematics, Land Surveying, Fluid mechanics, Railway Airport Road & Harbor Engineering
    Areas of conflicts between environmental concerns & construction requirements such as air, water & noise pollution & techniques of minimizing or avoiding these conflicts & waste management
    Understanding the implications of different building codes & contract in current use

    DECLARATION :
    I hereby declare that, the above information is true, correct and complete to the best of my knowledge and belief

    SYED AHMED KALEEMUDDIN

  2. Post Count Number #2
    On probation
    Join Date
    January 15th, 2013
    Location
    Renigunta
    Posts
    1

    Quantity Surveyor

    CURRICULUM VITAE :
    Pramod kumar .Bonapalli.
    Email : pramodhkumar002 AT gmail.com

    Career Objective : To work in a challenging environment that utilizes my skills and abilities and offers ample learning opportunities.

    Educational Background :
    QUALIFICATION (Area) BOARD INSTITUTE YEAR OF PASSING % MARKS :
    Class X State board of secondary education Andhrapradesh S.V.E.M High School school Renigunta , A.P 2006 75%
    Diploma in Civil Engineering State Board of Technical Education and Training A.P Govt Polytechnic Venkateswarapuram Nellore, A.P. 2009 71.25%
    B.TECH(Civil) JNTUH Hyderabad Pursuing 3rd Year

    Job Profile :
    ORGANIZATION DURATION EXPERIENCE (IN MTHS) DESIGNATION From To :
    Nagarjuna Construction Company Ltd June-2009 March-2011 17 Months Diploma Engineer & J.E
    VR INFRA Projects (P) Ltd March-2011 Sep-2012 18 Months Planning Engineer/Quantity Surveyor
    Coastal Projects Limited Sep-2012 Till Date Billing Engineer

    Responsibilities : Nagarjuna Construction Company Ltd.
    ( Construction of flyover at kapurbawadi junction on Thane Ghodbunder road Mumbai)
    Client : Maharashtra State Road Development Corporation.
    Consultant : SN Bobe Associates.
    - Maharashtra State Road Development Corporation introduced a project Construction of flyover at kapurbawadi junction on Thane Ghodbunder road Mumbai due to increase of heavy traffic. Cost of the project is 131 Crores, length of the flyover 4 Kms, friction pilling for foundations.
    - In this project at first to divert the traffic service road is required. I did laying of P.Q.C Road of 2Kms and completed successfully.

    ( Construction All India Institute of Medical Science ( AIIMS )College & Hostel Complex Package - 1 BHOPAL)
    Client : Ministry of Health & Family Welfare New Delhi.
    Consultant : Enarch Consultants.
    - Ministry of Health & Family Welfare New Delhi introduced a project setting up of college & Hostel complex at AIIMS Bhopal Package – 1. Project contains 12 buildings and cost of project 147 Crores.
    - In this project my scope of work is Quantity Surveyor, Preparation of RA bills, Escalation bills, sub contractors bills, Hire bills & PRW bills .Periodical reconciliation of payments as well as resources. Maintains of Drawings received register, Preparation & Maintains of D.P.R, M.P.R.

    (Indian Oil Corporation Limited Paradip Refinery Project )
    Client : Indian Oil Corporation Limited.
    Consultant : Udhe India Pvt Ltd.
    - Indian Oil Corporation Limited constructing Refinery Project in Paradip, cost of that project 35000 Crores, in this our company scope is 1200 Crores with 4 packages.
    - I worked for Package-II Vacuum Gas Oil Unit 147 Crores with three unit’s i.e VGO, HCDS, DHDT having foundation works with anchor bolts and structural erection works. My scope is Quantity Surveyor, Preparation of RA bills, Escalation bills, Secured Advance bills for materials, sub contractors bills, Hire bills & PRW bills. Periodical reconciliation of payments as well as resources. Maintains of Drawings received & issue register, Preparation & Maintains of D.P.R, M.P.R.

    Responsibilities : VR Infra Projects Pvt Ltd.
    Performance Based Maintenance Contract Package-I, Roads in Tamilnadu.
    Client : Tamilnadu Road Sector Project, Chennai.
    Consultant : MSV International Inc, Gurgaon.
    - Tamilnadu Road Sector Project, Chennai introduced a new Package to maintain the roads.
    - In this Package-I, contain four roads around 296 Kms 3 State Highways and 1 MDR, these four roads covers under 5 Districts cost of this project is 61 Crores.
    - In first year Initial Rectification Works, Periodical Maintenance Works, Minor Improvement Works, Emergency Works, Ordinary Maintenance Works with Mobile Unit, 40 Crores has to complete by renewing the roads after completion of first year maintain the roads for 4 years.
    - In this project I worked as Planning Engineer/Quantity Surveyor, Preparation of RA bills, Escalation bills, sub contractors bills, Hire Bills & PRW bills .Periodical reconciliation of Hot Mix Plants, Payments as well as resources. Preparation & Maintains of D.P.R, M.P.R, preparation of estimates for change in proposals , Conducting Roughness Survey with rough meter-III for roughness index and road condition report,

    Responsibilities : Coastal Projects Limited,.
    13. Construction of Single line B.G tunnel No.12 (Approximate total length 4694 Rm) at Km 63626 to Km 68320 km in between Khongsang- Tupul in connection with construction of new Railway line project between Jiribam-Tupul..
    Client : North East Frontier.
    Consultant : AIICOM.
    - In this project I worked as Billing Engineer, Preparation of RA bills, Escalation bills, sub contractors bills, Hire Bills & PRW bills .Periodical reconciliation of resources. Preparation & Maintains of D.P.R, M.I.S Reports etc,.

    Software's Known :
    - MS office
    - Autocad
    - C Language

    Areas of interest : Quantity Surveying.

    Declaration : I hereby declare that the information and facts stated above are true and correct to the best of my knowledge and belief..

    Date
    :
    Place :

    SIGNATURE
    (Pramod Kumar .B)