Instrument Engineer : Resume CV

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Instrument Engineer : Resume CV

    Reji Rafeek
    rejirafeek AT gmail.com
    Instrument Engineer / Instrument QA QC Engineer

    COVER LETTER :
    Reji Rafeek,
    email : rejirafeek AT gmail.com
    30th March 2011

    The Recruiting Manager,
    The Respective Organization.

    Dear Sir
    Sub : Instrument Engineer / Instrument QA/QC Engineer
    I am interested in working as Instrument Engineer / Instrument QA/QC Engineer for your organization. I am an Instrument Engineering Graduate with 6 years' experience to offer you. I enclose my resume as a first step in exploring the possibilities of employment with Oil & Gas Projects.
    My most recent experience is working at Kentz in association with Kellogs Brown & Root, Qatar, for PEARL GTL – SHELL Project & RALF Project in association with QG. My previous employer was Hyundai Heavy Industries (HHI), Kuwait for Kuwait Oil Company (KOC) Project. I am responsible for the overall E & I Construction-specialized in Instrumentation, including the Quality Assurance/Quality Control. In addition, I have Offshore experience when I worked at Blue Water Calm buoys, Kuwait and also Oil Field Instrumentation (OFI), Mumbai.

    As Instrument Engineer with your organization, I would bring a focus on Quality and Effectiveness to your product. Furthermore, I work well with others, and I am experienced in course planning.

    I would appreciate your keeping this enquiry confidential. Hope you will call me in a few days to arrange an interview at a time convenient to you. Thank you for your consideration.

    Yours faithfully
    Reji Rafeek

    E-Mail : rejirafeek AT gmail.com

    Objective :
    To work for a stable and fast growing organization that gives me an opportunity to exploit my potentials and capabilities to the maximum, where by I am able to contribute my talents, not only for gaining work satisfaction, but also for assisting the organization into becoming a leader of its trade in the market.

    Projects :
    Real Time Industrial Plant Automation System
    Project Duration : 1 year
    Development of an interface card between PC & external devices in a process station for the purpose of sensing & controlling its parameters

    Embryonics Approach Towards Integrated Circuits :
    Project Duration : 3 months
    Development of VLSI circuits that can partially reconstruct themselves in case of a minor fault (self-repair) or completely reconstruct the original device in case of major fault (self-replication). My report tries to bring out the basic concepts in the embryonics approach to realize VLSI circuits.

    Mobile Command Center :
    Project Duration : 6 months
    Transportation of a command centre using the principle of magnetic levitation.

    Rozgar :
    Project Duration : 1 year
    Web Application Demo - Job site using J2EE Programming in Struts framework.

    iPatientPassport. :
    Project Duration : 16 months
    The embedding of patient records, health status, diagnosis field and evaluation for an ayurvedic heritage hospital using smart cards. This project was in progress and would have be completed by Dec 2008.

    Professional Experience :
    KELLOGS’ BROWN & ROOT, OIL & GAS. :
    PEARL GTL, SHELL, QATAR May 2009 – Till Date
    INSTRUMENT QA/QC ENGINEER
    Job Responsibilities- Working in Project E & I Construction department and involved in Preparation of Scope of Work related Method of Statements, Installation, Inspection, Monitoring, Tracking of Construction & Commissioning activities related to Instrumentation including Process Control & ESD Systems, Fire & Gas System, Radio Communication & Public Address/General Alarm Systems.
    Jobs handled :
    - Review Project Drawings, P & ID’s, data sheets & specifications.
    - Carry out Inspection in designated area or specific discipline, within project time frame, to ensure work conforms to standards & ITP requirement.
    - Prepare Technical Queries during Job Enforcement & Surveillance.
    - Participate in final walkthrough with Shell.
    - Preparation of Test Plans & Method of Statements for Instrument Activities.
    - Supervise & Monitor the Instrument Activities as per Company’s Quality Plan & according to ISO standards.
    - Inspection & Witness of Instrument Activities (Calibration, Testing & Installation).
    - Carry out Quality Analysis of jobs, Prepare Statements w.r.t Scope of work according to company’s standard & DEP (Design Engineering Procedures).
    - Develop Quality Control Procedures (QCP) & Inspection Test Plan (ITP).
    - Understanding Instrument symbols, P&ID drawing, Instrument loop drawing, and Logic drawing.
    - Interfacing with Construction Contractor/Sub Contractor for Installation, Fabrication and/or Operational Testing Activities to ensure conformance to Engineering Design & Shell Criteria and are carried out without compromising Quality & HSE policies & practices.
    - Co-ordination to the Shell for requirement to follow-up Instrumentation drawing and technical evaluation.
    - Evaluate Field Installations & recommend Design Modifications and ensuring Cost Effective Solutions are applied.
    - Daily site surveillance of Instrument works which are in progress, checking if construction is working according to Shell’s specification, details, drawings and project’s quality plan.
    - Responsible for preparation of instrument loop package, documentation of loop tested and packages and updating of instrument database and maintaining up to date documentation, preparation and submitting of as-built drawings and data sheets.
    - Prepare Daily Accomplishment Report & Incoming Inspection Reports at Shift Ends.
    - Assist the Chief of Engineering to consider all the scope of requirements with regards to the contract, special Shell’s request and applicable statutory or regulatory requirements and Records maintained.
    - Assistance & Inspection for the Installation of Field Mounted Instruments, Junction Boxes, Local Panels, Pneumatic Leak Test of Air Line Tubing.
    - Design & Assure appropriate Instrument Loop Diagram (ILD), Instrument wiring/terminal diagram, cable schedule etc.
    - Support and guidance to the Construction team to clarify for proper Installation of the field Instruments to follow as per the International standards.
    - Quality assurance and control of the project requirement.

    HYUNDAI HEAVY INDUSTRIES & BLUEWATER – OIL & GAS :
    CRUDE EXPORT FACILITIES PROJECT KOC SITES, KUWAIT December 2007 – March 2009
    INSTRUMENTATION ENGR.
    Worked as Field Instrument Engr on BlueWater Offshore Calmbuoys & also KOC (Kuwait Oil Company) sites.
    Job Responsibilities :
    Responsible for Construction and Commissioning, Detailed Engineering, - Quality control, Quality assurance of Kuwait Oil Company`s (KOC) Crude - oil export facilities project at STF,NTF,NPP&KNPC(Kuwait National - Petroleum Company)
    Jobs handled :-
    - Reviewing instrumentation scope of work, drawings and executing - the construction and maintenance activities in line with the project - specification and standards.-
    - Planning/scheduling information and man-hour estimates to complete - the instrumentation scope of works.-
    - Supervision of Installation, Termination & Testing of field instruments, - U/G and A/G conduits, cable trays and tubing for instruments, - Instruments lab calibrations, marshalling panel, LCR cabinets-
    - Involved in installation, Calibration of instruments such as - transmitters, pressure switches, level switches, control valves, - temperature sensor, fire and gas detector ,mass flow meters, radar - tank gauging, Motor operated valves(MOV)-
    - Co-ordination of Installation and pre-commissioning of automatic - dewatering system, tank gauging system (SAAB ), fire fighting - system ,gas detection and monitoring system of crude oil tanks.-
    - Associated with Loop Checking, Testing/Pre-commissioning - Activities of all types of instruments.-
    - Involved in the removal and maintenance of the existing defective - instruments and repairing, calibration, installation and pre-- commissioning.-
    - Supervision of field Activities like Instrument Erection, Cable Laying - and Termination, Panel Erection and other Structural works.-
    - Assistance in maintenance and supervision of works during shut - down period.-
    - Material planning and its flow control, safety co-ordination, attending - safety and progress meeting.-
    - Responsible for the Supervision, Inspection, Monitoring, Preparation - and Implementation of QA/QC plan in Instrumentation activities.-
    - Prepare request for inspection to client for inspections and - acceptance of installations and Testing.-
    - Coordinate Quality procedures to construction department, Project - management and client Inspectors and Corrective actions for client - inspection comments/punch list.-
    - Responsible for clearing the Technical Query’s with consulting client - engineers and design department.
    - Associated with preparation and checking following types of - drawings, Hook-up drawings for field instruments, Instrument - Location & Cable Routing diagram, Instrument duct/Trench layouts, - Cable Routing Layout, Cable Tray Layout, Control Room Layout, JB - location drawings and cable schedule.-
    - Preparation and checking of JB Termination Drawing, Instrument - Loop schematic and Wiring diagrams, I/O list, Cause and effect - diagrams, Fire and gas detection drawings, P&ID drawings and Logic - diagrams.-
    - Modification of design drawings using AUTOCAD (ver.2005).-
    - Preparation of As-built drawings and Documentation.-

    OIL FIELD INSTRUMENTATION (INDIA) LTD. :
    GHATKOPAR, MUMBAI June 2005 – Dec 2007
    SERVICE ENGINEER, PRODUCTION - RIG
    Job Responsibilities- Rig Instrumentation & Services for drilling rigs like Pressure Indicators, Diaphragms, Drillers Console, Recorder, maintaining the following Features :-
    - Rugged & Intelligent Data Acquisition System
    - Flexible Job Execution to suit the Client requirement
    - Different Levels / Modules can be integrated in different stages over the life of a rig.
    - Support on maintenance Electronic, Pneumatic, and Electro-Mechanical Process Control Instrument.
    - Aware of Control Valves of different manufactures.
    - Understanding Instrument symbols, P&ID drawing, Instrument loop drawing and Logic drawing.
    - Co-ordination to the client for requirement to follow-up Instrumentation drawing and technical evaluation.
    - Prepare the Engineering job requirements, avoiding mistakes with less possible time and on Schedule.
    - Provide suggestion to the Chief Engineer to improve the work, the procedure or other format as required on schedule.
    - Assist the Chief of Engineering to consider all the scope of requirements with regards to the contract, special client’s request and applicable statutory or regulatory requirements and Records maintained.
    - Prepare & Revise Instrument Loop Diagram (ILD), Instrument wiring/terminal diagram, cable schedule etc.
    - Cross Check Process Hook-up, Instrument Hook-up, Pneumatic Hook-up drawing as per standard code.
    - Procure field Instrument Installation details drawing.
    - Specification sheets for process variable Instrument (Pressure/Level/Flow/
    Temperature), Instrument cables, Instrument cable tray, Termination materials, Tube & Fittings, Valves, Air Manifold etc as per Saudi ARAMCO and International Standard.
    - Procure Data sheets for Control valve, I/P converter, Electro-pneumatic converter, Solenoid valve, Valve positioned, Flow transmitter DP type, Mass flow meter (Coriolis, Thermal), Level Instrument, Magnetic coupling level gauge, Level switch, DP level transmitter, DP pressure transmitter, Pressure transmitter, Temperature transmitter, Temperature element, Flow element (Orifice plate)
    - Supporting Planning, Modification and Implementation for transfer signals for the Renovation existing plant by replacing the new modern type Instruments.
    - Assist & Execute field Instrument installation w.r.t details drawing.
    - Material take-off (MTO) for Process Instruments, Instrument cables, Support materials, Fittings, Conduits, Cable trays, Pneumatic tubes etc.
    - Support and guidance to the Construction team to clarify for proper Installation of the field Instruments to follow as per the International standards.
    - Quality assurance and control of the project requirement.

    Certifications :
    National Institute of Information Technology(NIIT)
    Trivandrum.
    JAVA,J2EE
    Certified course in Java & J2EE
    Graduate Record Examination(GRE)
    Educational Testing Service(ETS)

    Certified :
    Test Of English as a Foreign Language(TOEFL)
    Educational Testing Service(ETS)
    Certified

    Educational Qualifications :
    University of Calicut Kerala, India MES College of Engineering, Malappuram.
    BACHELOR OF TECHNOLOGY (BTECH) Applied Electronics & Instrumentation Engineering October 2001 – June 2005
    ISC- COUNCIL FOR THE INDIAN SCHOOL CERTIFICATE EXAMINATIONS
    Delhi, India Loyola School, Trivandrum CLASS XII (SCIENCE) March 2001
    ICSE- COUNCIL FOR THE INDIAN SCHOOL CERTIFICATE EXAMINATIONS
    Delhi, India Loyola School, Trivandrum CLASS X March 1999

    Skill Set :
    COMPUTER :
    - Proficient in Assembling of Computers, troubleshooting, maintenance & establishing Local Area Networks
    - Windows 2000 Server Administration with Active Directory
    - Windows 98/95/2000/XP/VISTA/Windows 7 & MS DOS as an operating system
    - Worked in MS Word / Excel as a data-editing package
    - C, C++, Java, J2EE as Programming languages.

    INSTRUMENTATION KNOWLEDGE :
    - Automation- PLC, SCADA,
    - Instrumentation & Control,
    - Control Valves, Transmitters, Transducers, Flow meters, Venturi Flow Nozzle, Orifice, Sensors, Compressors, Boilers, Serial Communication (RS232), Chemical Reactors, I/P & P/I Converters, Level/Pressure/Temperature/Flow Measurements

    Declaration :
    Updated on March 30, 2011, this document is true with the best of my knowledge.

    REJI RAFEEK.

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    NIPUL R PATEL
    E-Mail ID : nipul_patel007 AT rediffmail.com
    Career Objective :
    Seeking assignments in Process Control & Instrumentation with an engineering organization.
    Snapshots :
    * Currently servicing Gujarat Flurochemicals ltd (GFL), Dahej as a Sr. INSTRUMENT ENGINEER POWER PLANT(102 MW).
    My present work in GFL is 90 TPH ISJEC make AFBC Boiler, 18 MW SIEMENS make Steam Turbine, 7.1MW Trivani make Steam Turbine related all Instrument work 3X2 TPH WHRSG Boiler ME ENGG. PVT. LTD. 12X3 TPH WHRSG THERMAX make boiler related all Instrument work. 14X2 TPH ME Engg. Make WHRSG Boiler Commissioning & 5.2 MW X 2 Trivani make Steam Turbine commissioning and all Instrument related work.
    * Priveous servicing DIC FINE CHEMICALS (P) LTD, Dahej as a INSTRUMENT ENGINEER.
    * Previous serving Vardhman Acrylics Ltd. (with 5.5 MW Captive Power Plant), Jhagadia, and Gujarat, as Engineer Instrumentation.
    * Previously serving APAR INDUSTRIES LTD, VALIA as GET instrumentation.
    * Hands on experience in the calibration, installation & commissioning, testing, troubleshooting and maintenance of DCS (Tata Honeywell, Yokogawa), SCADA (Honeywell), PLC (Siemens, Allen Bradley), HMI, on off valve, control-valves, transmitters, sensors and other instruments (Yokogawa, Honeywell, Rosemount, Philips etc).
    Academic Credentials :
    2005 B.E. (Electronics) from S.V.M.I.T College (69%)
    1999 Higher Secondary from G.H.E.B.Gandhinagar (70%)
    1997 Secondary from G.S.E.B.Gandhinagar (82%)
    Career Highlights :
    * Currently servicing Gujarat Flurochemicals ltd, Dahej as a Senior INSTRUMENT
    Engineer from 3rd Aug 2010 to till date.
    * Dic Fine chemicals pvt ltd, Dahej as a instrument engineer 31 Mar ’10
    to 30 Jul’10.
    - Vardhman Acrylics td, Jhagadia, as a Engineer Instrumentation since 22 Jan ‘07 to 30 Mar’10.
    - Apar Industries ltd, Valiya as apprenticeship & Executive Trainee Instrumentation from 22.05.05 TO 21.12.2007
    JOB DETAILS :
    DCS
    YOKOGAWA : MODEL CENTUM CS3000
    TATA HONEYWELL : MODEL TDC 3000
    SCADA
    HONEYWELL-HC 900
    PLC
    SIEMENS- SIMATIC S5 135U R-PROCESSOR & 95 U PROCESSOR
    SIEMENS- SIMATIC S7-200,300,400
    ALLEN BRADLEY - MICRO LOGIX1000 & SLC-5/15, SCL-500
    TROUBLE SHOOTING AND PROGRAMMING OF SEQUENCE CONTROL.
    - MAINTANANCE OF DIFFERENT TYPES OF SENSORS AND THEIR CONVERTERS FOR AUTOMATION (VIZ.), PHOTOELECTRIC SWITCH, PROXIMATY SWITCH, ULTRASONIC SENSORS & LIMIT SWITCH (OMRON, SIEMENS, OSNA)
    - MAINTANANCE OF CONTROL VALVES, ON-OFF VALVES (MIL, VALTEK, IL, EL O MATIC, ALPHA LEVEL).
    - DIFFERENT TYPES OF SMART DP TRANSMITERS (INSTRUMENTATION LIMITED, YOKOGAWA, FUJI, ROSEMOUNT, ENDRESS-HAUSER)
    - MAGNETIC FLOWMETER (YOKOGAWA-ADMAG, ENDRESS-HAUSER, ROSEMOUNT)
    - VORTEX FLOWMETER (YOKOGAWA-ADMAG, ENDRESS-HAUSER)
    - MASS FLOWMETER – MICROMOTION (ROSEMOUNT), ROTOMASS (YOKOGAWA), MASSMETER (ABB).
    - PH & CONDUTIVITY METER (BELA, ROSEMOUNT, ION EXCHANGE, YOKOGAWA, FOXBORO)
    - DIGITAL INDICATTING CONTROLLER (YOKOGAWA, HONEYWELL, ABB-KENT-TALOR)
    - RECORDER (YOKOGAWA, ABB)
    - TURBIDITY METER (GREAT LAKE INSTRUMENTS)
    - OXYGEN ANALYSER (YOKOGAWA, ROSEMOUNT)
    - DIGITAL WEIGHT INDICATOR (GEFRAN, PHILIPS)
    - PNEUMATIC CONTROLLER (BELLS)
    - I TO P CONVERTER (BELLS, MIL, MOORE)
    Academic Projects & Trainings :
    Project : FM STERO PLAYER & PLC LIGIC
    Vocational Training : Videocon Narmada glass ltd, chavaj.
    COMPUTER LITERACY :
    Operating Systems : Win98, Microsoft word, excel, power point etc.
    Languages : C
    Date of Birth : 23rd dec, 1981
    Thanking you
    NIPUL R PATEL

  3. Post Count Number #3
    On probation
    Join Date
    January 9th, 2013
    Location
    kerala
    Posts
    1

    Instrument Engineer with 4 month experience

    LIBIN BABY
    Palakkad-(Dist)
    Kerala-(State), INDIA, Pin- 678683.
    Email : libinbaby2012 AT gmail.com

    Career Objective :
    Being a committed team player, want to be a part of an organization, where I will get a chance to utilize my talents and creativity and contribute to the growth of the organization as well as myself.

    Educational credentials :
    - Bachelor Degree in Engineering (Electronics and Instrumentation), 2012
    Pursued from RVS College of Engineering and Technology Dindigul, Anna University, Chennaiwith 73.4 %of marks.
    - Higher Secondary,2008
    Board of Higher Secondary examination; 77.83%,Govt. Higher Secondary school Pattikkad
    - Secondary, 2006
    Board of Kerala public Examination; 81.71%.MMHS Panthalampadam,

    Computer skills :
    - Operating Systems : Windows 7, Windows XP
    - Software : MS office, CAD

    Key skills :
    - PLCKnowledge : GE Fanuc 90-30, Modicon, Omeron.
    - SCADA,MATLAB, LabVIEW, Control systems, PID Controls.
    - P&ID, Electrical relay diagrams.

    Experience :
    Instrument Engineer – Automation Technics Co. – Ernakulam (4 months)
    Installation and Calibration of the following process instruments devices.
    - Rosemount DPT– Model 3051, 1151(HART)
    - Rosemount TT Model 3044, 3144 (HART).
    - Rosemount PHT Model 1054B
    - ABB PT, DPT – 2600T series (HART), Yokogawa DPT - EJA 120A (HART).
    - Pressure Gauges, Pressure switches, Process Meters. RTD, TC elements etc.
    Cabling, P&ID, Loop checking using Druck UPS III, Calibration using Emerson 375 Field communicator, FLUKE 741 documenting process calibrator, Druck DPI 610 Pressure calibrator, Deadweight tester, Digital Insulation tester, Digital Multi meter, Digital Manometer.

    Academic Project undertaken ( FACT)
    “Speed Control Of Steam Turbine Using Adaptive Algorithm”

    A simulation project of Speed control of steam turbine is done by using Gain scheduling Adaptive Algorithm along with PID control. It is found that this combination is three times better than normal PID control in the case of a non-linear system.

    Trainings & Seminars Attended :
    - PLC, SCADA
    - Undergone project training in FACT Ltd, Cochin from 28th Dec 2011 to 28th Jan 2012.
    - Participated in a one day workshop on a topic “Automation using PLC & SCADA”.
    - Attended the National Conference on Recent Trends in Instrumentation on 4th Dec 2009 at RVS college of Engineering and Technology.

    Personal Details :
    Name : LIBIN BABY
    Father’s Name : BABY K.V
    Date of Birth : 15/MAY/1991.
    Religion : Christian.
    Material status : Single
    Language proficiency : English, Hindi, Malayalam, Tamil

    Other Details : Holding valid Indian light motor Driving License.


    Declaration
    I do hereby confirm that the information furnished above is true to the best of my knowledge and belief.

  4. Post Count Number #4
    On probation
    Join Date
    April 8th, 2013
    Location
    Bharuch
    Posts
    1

    CURRICULUM VITAE
    GAURANG BHAGUBHAI PRAJAPATI
    Bharuch-392001
    Dist-Bharuch
    E-mail :-gaurang095 AT gmail.com

    CAREER OBJECTIVE :
    - Seeking for an Electronics OR Instrumentation Engineer position, to use my education and training in a fast paced and challenged environment.
    EXPERIENCE
    - No Experience (Fresher)
    EDUCATIONAL QUALIFICATION :
    - I completed my Bachelor of Engineering in Electronics & Tele-communication branch from R.C.Patel Institute of Technology under North Maharashtra University,Jalgaon in July-2012.

    DEGREE INSTITUTE UNIVERSITY/BOARD YEAR OF PASSING PERCENTAGE :
    B.E (Electronics & Tele-communication) R.C.Patel Institute of Technology, Shirpur,Maharastra NMU, Jalgoan July-2012 62.86%
    DIPLOMA (Industrial Electronics) G.M.C.Polytechnic, Shahada,Maharastra MSBTE Board, Mumbai July-2009 64.79%
    S.S.C. Narayan Vidhyalaya,Bharuch GSHSEB Board, Gujarat March-2006 64.71%

    PROFESSIONAL CERTIFICATIONS :
    UNDERGONE A 3 MONTHS INDUSTRIAL AUTOMATION TRAINING FROM SOFCON INDIA PVT LTD, VADODARA
    - PLC ( Micrologix 1000 Analog SLC 5/03 ) Programming with software RS Logix 500 & Communication with RS Linux , DH 485.
    - PLC Programming using coils, contacts, timers, counters, data move, relational and math functions.
    - PLC-PC communication networking.
    - Compact Logix with RS 232 & Ethernet Programming with RS Logix (5000) Software.
    - PLC Wiring in Sink & Source Concept.
    - Programming Knowledge of Siemens 200 & 300, Modicon.
    - Developing PLC & HMI program for monitoring & operations of a process.
    - Creating new applications with SCADA for industrial process.
    - Create and setup alarm management.
    - Instrumentation Panel Designing with AUTOCAD 2012
    - Knowledge of Star- Delta wiring.

    SOFTWARE SKILLS :
    - Documentation software : MS Office
    - SCADA,PLC,DCS Programming,
    - AUTOCAD 2012

    PROJECTS :
    - Diploma Final Year Project : “Heart Beat Monitor using Micro-Controller”.
    - Degree Final Year Project : “Wireless Notice Board using GSM/CDMA Phone”.

    EXTRA CURRICULAR ACTIVITIES :
    - Attended workshop on “Robotics” events by Workshop India.
    - Been a cricket captain in school and college team.
    STRENGTHS :
    - Self-confident & Positive attitude
    - Willing to accept new challenges
    - Team worker
    PERSONAL PROFILES :
    - Date of Birth : 09th MAY 1991
    - Languages Known : English,Hindi,Gujarati,Marathi
    - Sex : Male
    - Nationality : Indian
    - Hobbies : Playing cricket, listening songs and chatting with friends
    - Alternate e-mail id : gaurang9591 AT gmail.com

    I hereby declare that all the information mentioned above is true to the best of my knowledge
    Date : YOURS FAITHFULLY,

    Place : Bharuch (Gaurang B Prajapati)