-
March 30th, 2011, 04:54 PM
Post Count Number #1
IJT addict
Telecom Site Engineer : Resume
Deepak kanojiya
deep_kanojiya AT yahoo.co.in
Career Objective :
To be a continuos learner and lead the company on the road to success..
Professional Qualification :
Three years Diploma in Electronics &Telecommunication Engg. From SVP Indore, RGPV Bhopal.
Work Experience :
1. At present work for STREAM TELESERVICES Ltd. as site engineer (idea project)
2. February 2009 Working with KHARYA ENGINEERIG WORKS Ltd. As site
Engineer (BSNL GSM project)
3. January 2008- : Working with RELIANCE COMMUNICATION as Network I&C Engineer in transport (CDMA) department.
4. Working with BTA Cellcom (A subsidiary of IDEA) Pvt. Ltd. as O&M Engineer in BSS (GSM) department.
5. Project engineer in GTL Ltd. (IDEA and BSNL GSM project)
Principal Accountability/Responsibilities :
- Responsible for New site Installation.
- Responsible for SDH and PDH Installation and commissioning
- Installation and Alignment of 0.3m, 0.6m, 1.2m, 1.8m M/W antenna.(Keycom and Rfs)
- Commissioning, operation and maintenance of SDH (pasolink+), PDH (NEC pasolink v4), neoi M/W indoor equipment.
- Integration and Commissioning of Ericsson Microwave PDH & SDH Equipment
- Troubleshooting of new sites commissioning and old working MICRO WAVE Network sites.
- Installation and commissioning and testing of transmission equipment like FIBCOM 6325.
- Responsible for BTS site commissioning and Radiation.
- Troubleshooting of new sites commissioning and old working BTS sites.
- Installation of GSM antenna (looking of orientation and tilt).
- Installation and testing of Battery bank and Power Plant sets at various BTS sites.
- Installation, commissioning and maintenance of DG at cell sites.
- Operation and maintenance of BTS and MW at cell sites.
- Operation and maintenance DG set, battery bank, SMPS, PIU, IT, Servo stabilizers on cell site.
- Preventive maintenance of all electrical equipment on cell site.
- Responsible for full installation of that site(like E1 cable routing from DDF to BTS via PCM-2 and PCM-4 cable, PCM cable routing and installation for alarm and E1, installation of DDF box.)
- Integration of Sites with Routing of E1 and Patching E1
- Infrastructure acceptance test and maintenance.
- Troubleshot the faults arising during the operation.
- Preventive Maintenance of cell sites
- Handling the power issues of zone also working different SMPS system like POWER ONE, DELTA, ELTEK
ACHIEVEMENTS :
1. Completed overall 55 hopes of M/W link including 1+1 links of 0.3m to 1.8m antenna.
2. Successfully Installation, commissioning and development of SDH protection ring.
3. Successfully Installation and commissioning FIBCOM MUX cell site.
4. Installation and commissioning of Ericsson Bts sites for Idea cellular LTD MP (Bts type 2202, 2204, 2206, 2964.)
5. New Bts site installation 900 & 1800 band ALCATEL system for BSNL CG.
6. Successfully installation Power plants and Battery bank units at Cell site.
7. Successfully BTS swaping Motorola BTS with Alcatel BTS cell sites.
8. Successfully swaping transmission equipment NORTEL with FIBCOM.
DECLARATION :
I Deepak Kanojiya, declare that all the information in this resume is true to the best of my knowledge.
Date..
Deepak Kanojiya
-
June 4th, 2011, 04:34 PM
Post Count Number #2
RAHUL MISHRA
E-Mail :- rahul_ns2009 AT rediff.com, rahul_ns2009 AT yahoo.com raulns2009 AT gmail.com
Objective :
To obtain a Suitable and challenging position in a progressive organization that provide opportunities for professional growth, personal development and creative challenges.
Academic Qualification :
1. Passed 10th from Rajasthan Secondary Board, Ajmer in 1999.
2. Passed 12th from Rajasthan Senior Secondary Board, Ajmer in
2006 from Open School Delhi.
Technical Qualification :
Two years Draughtsman Mechanical Training from Industrial Training Institute Ajmer, Rajasthan in 2004
Computer Proficiency :
- Familiar with Window 98, MS Office (Basic Knowledge.)
- AutoCAD from ZED carrier, Ajmer.
- Basic Knowledge of Photoshop, CorelDraw
- Knowledge of Scanning Drawing & minor changing with digitization of Drawing.
- Basic knowledge of 40 days Computer Hardware & Networking Course
Work Experience :
Job Profile :-
- To prepare all types of detail Drawings as well assembly Drawing.
- To prepare general Arrangement of Machines.
- Take sketch all types of Mechanical Parts.
- Fabrication & Erection of Structural & Machine parts of Cement
plant Machinery.
- Preparation of Bills for fabrication as well as erection :
(i) Worked as Draughtsman cum site fabrication and erection incharge of Oswal Engineer’s , Vijay Nagar,Ajmer(Rajashstan) for erection and fabrication work .They are manufacturer of spare parts/equipments of Cement Plant.( from 5 Sept 2004 to 5Oct 2006).
(ii) Worked as Draughtsman in M/s Widescanne Solution in Jaipur from Nov 2006 to Fab 2007. As Draughtsman for scanning and Digitization of old hard copy drawing to soft copy.
(iii) Worked as Supervisor of Fabrication and Erection work from March 2007 to Dec 2009 in N.A.E.C. A fabrication contractor of Adhunik Cement Ltd. Meghalaya.
(iv) Working as Site In charge in M/s Shri Shai Construction in Adhunik Cement Ltd. Meghalaya from Jan 2009 to 15th Jan 2011.
(v) Working as Supervisor in Ghorahi Cement Pvt. Ltd. in Nepal from 19th Jan 2011 to till date.
Strength :
Self Driven Individual, Hard Working, Position Approach
-
May 16th, 2012, 09:15 PM
Post Count Number #3
post for site engineer
Resume :
Piyush Pandey
Email I D. – pandey.piyush249 AT gmail.com
Objective :-
- To be one of the most vital human assent of the organization which provide a steady career growth along with job satisfaction and challenge.
Academic Qualification :-
- Engineering Electrical & Electronics engineering from Malwa institute of technology,indore(mp)
- Rajiv Gandhi technical university Bhopal (M.P.)
- Basic Knowledge of Computer.
Result : - Engineering in Electrial & Electronics from MIT College ,Indore with 58.50%.
Education details :- Madhya Pradesh Board Bhopal.
S. No. Examination Year Percentage Division :
1 High School 2005 80% First
2 Higher Secondary School
(Mathematics) 2010 60.4% First
Project Undertaken :-
1.Differental relay(Minor project)
2.RPM control of dc motor by hex key pad(Major project)
Training Details :-
- 30 days vocational training at maihar cement
Key Strength :-
- Innovating thinking hard working any time anywhere.
Declaration :-
- I hereby celerity and information furnished above is true according to of my knowledge .
Date : - …......................
Place : - ….....................
Piyush pandey