Instrument Technician / Foreman : Resume CV

+ Ask Question / Post resume
Results 1 to 6 of 6
  1. Post Count Number #1
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Instrument Technician / Foreman : Resume CV

    mohammad qayamuddin
    qayam_uddin2006 AT yahoo.com
    instrument technician/foreman
    -------------------------------------------------------
    MOHAMMAD QAYAMUDDIN
    Email : qayam_uddin2006 AT yahoo.com

    SR. INSTRUMENT TECHNICIAN/FOREMAN :
    Decisive result focused, professional with 13 years experience in hand an handling manpower services industry, my experience is semi submersible Rig TDS 2000, Oil & gas petrochemicals, Refinery, Fertilizer Aluminum, MHI Gas turbine, Project pertaining o quantity surveying / installation of various building services, electrical, security, fire detector and protection system etc. and also I am always up to date with technologies advances in our field. Possesses interpersonal and organization skills. Excelles in term work, versed with international standards.

    Education Qualification : S.S.C Passed in 1988
    Technical Qualification : I.T.I Passed from N.C.T.V.T in 1991 – 1993
    Other Qualification :
    - Well conversant in Microsoft office application (word, excel, access and power point)
    - Conversant with internet and email application

    TOTAL EXPERIENCE : 13 YEARS

    EXPERIENCE HIGHLIGHTS :
    Employer : FORTUNE COTROLS AUT. LLC
    Designation : INSTRUMENT FOREMAN
    Duration : 05.01.2009 TO 26.10.2010
    Location : SEMI SABMERSIBLE RIG UAE

    Employer : SBM OFFSHORE CONTRACTOR INC
    Designation : INSTRUMENT COMMISSIONING TECHNICIAN
    Duration : 30.10.2009 TO 26.10.2010
    Location : SEMI SABMERSIBLE RIG TDS – 2000 (U.A.E)

    Employer : BECHTEL OMAN
    Designation : INSTRUMENT TECHNICIAN
    Duration : 17.10.2007 TO 30.10.2008
    Location : SOHAR ALUMINUM SMILTER PROJECT (OMAN)

    Employer : FOUAD ABDULLA FOUAD CO. LTD.
    Designation : INSTRUMENT TECHNICIAN
    Duration : 01.05.2002 TO 25.06.2007
    Location : SAUDI ARAMCO VARIOUS PROJECT (K.S.A)

    Employer : SNAMPRGOETTI SAUDI ARABIA LTD.
    Designation : INSTRUMENT TECHNICIAN
    Duration : 15.06.2005 TO 15.06.2006
    Location : CCR PLATFORM SAUDI ARAMCO (K.S.A)

    Employer : CONSOLIDATED CONTACTOR CO. W.L.L
    Designation : INSTRUMENT TECHNICIAN
    Duration : 23.09.1999 TO28.11.2000
    Location : YANPET II ETHYLENE EXPANSION PROJECT YANBU (K.S.A)

    Employer : CONSOLIDATED CONTRACTOR CO. W.L.L
    Designation : INSTRUMENT TECHNICIAN
    Duration : 01.05.1997 TO 31.05.2001
    Location : LCC 010 ARAMCO & PTA IBN RUSHD PROJECT YANBU (K.S.A)

    Employer : PCT (I) PVT. LTD.
    Designation : INSTRUMENT TECHNICIAN
    Duration : 06.03.1996 TO 26.02.1997
    Location : ESSAR STEEL PLANT SURAT GUJRAT INDIA

    FIELD SPECIALTY PROFILE :
    I got best opportunity in instrument / Electrical field for plant construction field equipment and transmitter, like calibration installation loop checking pre commissioning and startup activities.
    Checking technical specification of materials uses for electrical and instrument for instrument cable & control cable.
    Schedule cable laying, and termination etc.
    Supervision & inspection of work in the field for the installation of electrical and instrument equipment like transmitter gauges switches JB Panel and cable pulling etc.
    Preparation of deviation statement analyzing non conformities and recommending.
    Assisting client for testing and commissioning for electrical and instrument cable and equipment.

    JOB RESPONSIBILITIES :
    Supervision, co ordination erection and commissioning of various kinds of instrument and control system supervision of kinds instrument installation, calibration, loop checking, commissioning and troubleshooting co ordination with vendor for skids instrument installation modification.
    Involved in logic test and function test, in charge of field instrument construction activities like installation of cable tray, impulse line, air line, junction box, local panel, marshalling, cabinet, cable glanding, and termination etc.

    Preparation of the following instrumentation drawings document instrument F & G detector data sheets instrument and F & G specification instrument index schedules orifice & control valve sizing calculation cable sizing calculation equipment layouts instrument cable rounting tray layout instrument cable schedule block diagrams of instrument electrical telecom etc.

    Calibration loop checking, commissioning maintenance and troubleshooting of flow pressure level temperature, electronic and smart transmitter, displacer type transmitter, capacitance, Ultrasonic, bubbler types (torque tube types, LDVDT, type) pneumatics, transmitter I/P, P/I converter, controller & panel instrument (Foxboro, Honeywell, Rosemount, Yokogawa, Moore, Weston Smite, ABB, Kent, Fuji, and Exenburg)
    REVIEW OF ALL INSTRUMENT ACCEPTANCE DOCUMENTS AS FOLLOWS.
    Instrument loop diagram diagrams (ILD) piping, & instrument diagrams (P & ID) Instrument location layout (plot plan) instrument process & pneumatics hook up drawing, primary and secondary cable termination drawings, instrument data sheet and alarm set point, vendor document etc.

    Date :
    Place : Signature of Applicant

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : chetan.m.bhavsar
    Email : chetan_3675 AT yahoo.com

    Designation / Skillset : instrument technician 17year exp.
    i have experience in polymer,glass.chemical.petrochemical,refinery plants

    Resume :
    TO,
    SUB :- AN APPLICATION FOR THE POST OF “_____________________________”
    Respected Sir,
    With the reference to your advertisement. I am applying for the above post.

    I will submit my entire Certificate at the time of Interview. I hope you will give a fair Chance to prove my worth. I have attached my bio-data here with for your kind Consideration.

    Waiting for your favorable reply.

    Thanking you.

    Yours faithfully
    _____________________
    (CHETAN. M. BHAVSAR)

    BIO – DATA
    - EDUCATION QUALIFICATION :
    SR.NO EXAM PASS NAME OF BOARD YEAR OF PASSING PERCENTAGE :
    01 S.S.C WITH TECHNICAL SUBJECT G.S.E.B. GANDHINAGAR MARCH - 1990 62%
    02 I.T.I ELECTRONICS I.T.I TARSALI VADODARA JULY - 1992 69%

    WORK EXPERIENCE : Presently I am working in KUWAIT K.N.PC. MINA AL-AHMADI REFINERY AS “INSTRUMENT FORMEN” with M/S ALMEER TECHNICAL SERVICES COMPANY (ATSCO) since last 11ST NOV-2009 to till date.

    - MY PREVIOUS EXPERIENCE AS UNDER :-
    SR. NO NAME OF COMPANY JOINING DATE LEAVING DATE POST EXPERIENCE :
    01 PETROFILS
    CO- OPERATIVE LTD. NALDHARI UNIT VI VALIA DIS
    BHARUCH 13/07/1993 TO 18/07/1996 Tr.Period 17/03/2001
    INST. TECH. 7 YEARS & 8 MONTH

    02 “VIDEOCON NARMADA GLASS” VI : CHAVAJ.
    DIST : BHARUCH 30/06/2001 30/11/2003 INST.
    TECH. Contract
    Base 2 YEARS & 5 MONTH

    03 NOVA PETROCHEMICAL SARKHAJ BAWALA
    HIGHWAY VI : MORIYA
    DIST : AHEMDABAD 01/12/2003 18/11/2004 INST.
    TECH. 11 MONTH

    04 GUJARAT FLUOROCHEMICAL LTD. RANJEET NAGAR. Nr.PAVAGADH
    TAL : GHOGHAMBA
    DIST : PANCHMAHAL 19/11/2004 10/12/2005 INST.
    TECH. 1 YEARS

    05 MODERN PETROFILS
    (D.T.Y DIVISION, TAL-KARJAN,
    DIST-VADODARA) 15/12/2005 26/07/2008 INST.
    TECH. 2 YEAR & 7 MONTHS
    06 J.C.T. ELECTRONIC LTD. (TAL-KARJAN,
    DIST-VADODARA) 01/11/2008 05/11/2009 INST.
    TECH. 1 YEAR
    - 13/07/1993 TO 18/07/1995 Training Period in Petrofils Co-operative Ltd.
    Total Experience with Training Period 17 years.

    JOB RESPONSIBILITY :
    - Handle the shift and Breakdown.
    - Servicing and maintain spare.
    - As per process requirement modification work done.
    - P.M. activity done as per P.M. Schedule.
    - Activity done with ISO Preparation.
    - Reporting to Engineer, Manager.

    NATURE OF WORK :-
    I have exclusive hands on experience in the field of erection, commissioning, pre-commissioning, start up and maintenance of Instrumentation systems in polymer .glass,petrochemical,chemical industries,refienary. Loop checking, preventive maintenance, calibration for all major parameters like pressure, temperature, level, flow. and also diagnoses problems or potential problems with control systems of pneumatic, electrical and electronic and shutdown start up sequence checking, monitoring the status in DCS (version10.2) good command in repairing and understanding of P &ID and logic Diagrams related to Interlocking and Emergency shutdown system. I worked on ESD SYSTEM for and motors control and tripping by PLC .

    - Knowledge of Calibration and Installation of field Instrument like
    - Difference types of pneumatic, Electronic Transmitter and Smart Transmitter Rosemount Make – 3051S,1151
    - HART Communicator Rosemont - 375
    - Difference types of pressure, level, flow, Temperature controllers and indicators.
    - I/P Converter/ Smart I/P with Positional Fisher DVC 6000.
    - Difference types Control Valve and Solenoid Valve.
    - Temperature pressure and level switches and gauges.
    - Temp. Sensor like R.T.D, THERMOCOUPLE.
    - Servicing and maintenance of safety valve.
    - Calibration and maintenance of displacer type level Control, Interface Level Control and magnetic flow meter.
    - Smart 5300 Rosemount Make RADAR Level Transmitter.
    - Knowledge of proxy switches and photoelectric sensors.
    - Bentley Nevada 3500 Vibration System (Redial Vibration).
    - Knowledge of P.H. Meter and Conductivity meter (Make : Rosemount-1181,5018).
    - Weighing system load cell alignment, zero-tare weight calibration, etc.

    - Knowledge of P.L.C. like :
    - L & T MAKE R84H
    - ALLEN BRADLLY MAKE 5/25 & 5/40
    - ALLEN BRADLLY MAKE SLC-500
    - ALLEN BRADLLY MAKE LOGIX 5561
    - SIEMENS MAKE-700
    - Knowledge of D.C.S System.
    - FOX BORO MICRO I/A
    - PROVOX & ROSEMOUNT SYSTEM
    - FOXBORO I/A SERIES INVENSYS Version 10.2
    - Knowledge of Triconix Trippal Redundancy ESD Panel (Emergency Shutdown) running on Gate Logics Tristation 1131 V 4.1.
    - Rectification of problem related with process Instrumentation like loop Checking and relay base control system.
    - Knowledge of Safety Interlocks and Control loops for Boiler and Compressor.
    - Knowledge of as per Drawing Panel Wiring work and testing panel.
    - Knowledge of AC/DC Drive
    - VACON (A.C.DRIVE)
    - ALLEN BRADLLY 1305 (A.C.DRIVE)
    - ALLEN BRADLLY POWER FLEX 40 (A.C.DRIVE)
    - TAPE DRIVE (D.C.DRIVE)
    - E – DRIVE (D.C.DRIVE)

    - Electrical Site :
    Knowledge of electrical site servicing and maintenance of AC/DC motor.
    Also knowledge of star/delta starter.
    Repairing of various type of Electronics Control Card like Power Supply, Controllers and Indicators.
    Handle and working in difference types of projects works.
    _____________________
    (CHETAN M.BHAVSAR)

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Instrument Technician Resume

    LINSON JOHNSON
    INSTRUMENT TECHNICIAN

    Email : johnsonlinson AT gmail.com

    OBJECTIVE :
    To obtain a position to make use of my education and my past five years experience further more to help enriching the work place with creative contribution and also to enrich by the educative Work environment.

    PROFESSIONAL EXPERIENCE :
    - AYTB Co : Ltd JUBAIL K.S .A.
    Presently Working as Instrument Technician in AYTB Co : Ltd JUBAILA K.S.A (Since October 2008 to till date)
    PROJECTS :
    SAHARA PETRO CHEMICALS COMPANY(FROM 17-11-2008 TO 19-05-2010) ,SAUDI CHEVRON PHILIPS, PETRO KEMYA ,JUPC,NMC,NATPET

    TECHNICAL PROFICIENCY :
    - Hand on experience in installation, pre commissioning, commissioning, maintenance & documentation activities in petro chemicals instrumentation field
    - Familiarized with checking of shut down systems and interlocks of various types of compressors, heaters, and boilers
    - Hand on experience in using HART, FIELDBUS & SMART communicators & configurators

    Key Skills :
    - Having good knowledge of plant safety rules & regulations.
    - Good knowledge about Permit to work systems (PWS) and several kinds of permits like Cold work permit, Hot work permit, Limited Space Entry permits.
    - Familiarity about several kind of Perilous involved in work area and essential safety measure to be done for the safe work.
    - Capacity to do job alone by following Safety rules & regulations.
    - Good Experience in the Plant Maintenance and Commissions.
    - Sound knowledge and good experienced in the management Plant Instrument Maintenance.
    - Well-known with the Plant Running, Predictive, Preventive, Breakdown and Corrective Maintenance.
    - Specialist in Installation & Calibration of different types of the Modern Smart Electronics & Pneumatic instrument.
    - Knowledge in PLC, DCS, Plant Automation Control System.
    - Effective knowledge of the Lock Out Tag Out Processes.
    - Sound skills of all kind of instruments in Rotating Equipments, Compressors etc.
    - Able to do a job independently.
    - Experienced in loopchecking and functional logic checking of all types of field instruments
    - Knowledge in calculation of suppression and elevation of level transmitters.
    - Worked in wet leg and dry leg type level transmitters of yokoghawa, rosemount,abb and honeywell.
    - Hand on experience in glanding and terminationof field instruments,junction boxes,and marshelling pannels.
    - Experienced in installation and configuration of various field instruments.
    - Ability to do health checking and linearity checking of Bently nevoda vibration probes.
    - Experienced in installation of vibration probes and accelarometers of compressors, turbines and motors.
    - Basic knowledge in Honeywell TDC3000 DCS, Yokogawa scentum3000, Allen Bradley PLC,Siemens simatic S7-400 PLC system.
    - Knowledge in Triconex Emergency shut down system.
    - Skilled to read Engineering Drawings, Loop Diagrams, P&ID Drawings, Logic Diagram & Hook up drawings also.
    - Familiar with overhauling and calibration of control valve Manufactured from Fisher, Valtek Metso,Neles, Masoneilan,Flowserve
    - Skilled in Computer Operations.

    Exposure :
    instruments - Honeywell 7800 series flame management system for boiler.
    - Conventional and smart transmitters of Honeywell, Rosemount Yokogawa, ABB,Foxboro,Siemens,Spirax Sarco etc
    - Bently Nevada vibration monitoring System 3500,3300 XL series.
    - Fisher DVC5000,6000,&2000 Positioners
    - Flowserve Logix 3200 IQ Digital positioner
    - Endress&Hauser Mass Flowmeter Promass83f Series
    - Endress&Hauser Ultrasonic Flowmeter Prosonic flow 93 Series
    - Magnetic Flowmeter Admag AE 208MV Series
    - Yokoghawa DY100 Vortex Flowmeter
    - Ohmart vega Radio active level transmitter and switches
    - Ohmart vega vega plus 56KEX-UD Radar level transmitter
    - Special Service Instruments Such As Capacitance type, Displacer type level transmitter specially used in interface level measurement, manufactured from Magnetrol, Rosemount & Masoneilan.Maintenance and troubleshooting of all types of field instruments.
    - MTL 4046 Barriers for field instruments.
    - Labasys Velocity meter.
    - Asco Solenoids and pneumatic relays.
    - Dynisco MDT 422F Pressure transmitters.
    - Endress&Hauser FTM50,FTM51,FTM52 Level limit switches.
    - Pepperl+Fuchs Inductive Proximity switches
    - Officine Orbiche Magnetic type level switch.
    - Ashcroft Pressure and Temperature switches.

    Exposure, Test equipments :
    - Fluke 705 multiloop calibrator
    - Beamax MC5-IS multi calibrator
    - Fluke 77 multimeter
    - Fluke 707 loop calibrator
    - Altek 434-KP Milliamp calibrator
    - Scandura RS 232 Temperature calibrator
    - Ametek jofra temperature bath
    - Scandura AIC series Decade box
    - GE DPI 620-IS Advanced Modular Calibrator
    - UnoBudennberg pressure calibrators
    - GE Druck pressure calibrator
    - Ametek T-1 twin seal pressure pump
    - TK3 E,G Bently Nevada vibration calibration kit
    - Scandura Test calibration bench
    - Emerson HART 275,375&475 series

    Career Progression :
    - Total Experience In Instrumentation Maintenance Field :- 5 years
    OCTOBER 2008 TO TILL DATE :- INSTRUMENT TECHNICAN
    AYTB CO LTD. JUBAIL KSA
    - Responsible for corrective maintenance and preventive Maintenance activities of running plant and shutdown plant.
    - Participated in successful plant commissioning and startup of Sahara petrochemicals company (PP&PDH, a Tecnimont Daelim consortium)
    - Worked as a QC for loop checking,interlock checking and punch list clearing of the instruments.
    - Participated in six successfull turnarounds in various petrochemical plants in jubail k. s. a.

    FROM 12THfebruary 2007 TO 15TH JULY 2008 :- INSTRUMENT TECHNICIAN:
    TOTAL INSTRUMENTATION COCHIN :
    - Involved in commissioning and start up activities of six clamp projects in All over India.
    - Participated in installation ,calibration and configuration of various field instruments.
    - Involved in MOC (Management of changing) of some plants for process requirements.
    - Asist vendors of Allen Bradley plc for their software installation and configurations.
    Technical Qualification - Diplomain Electronics&Instrumentation 2007
    (Technical Education Board of Kerala)
    Languages - Fluent in English , Hindi & Malayalam
    - Basic knowledge in Arabic language
    Computer - Knowledge in computer and almost all the common & some scientific software

    EDUCATIONAL INFORMATION :
    SSLC 2002(Kerala State Educational Board)
    PLUSTWO 2004(Kerala State Educational Board)

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Jr.Technician with 2.6yrs experience in cement industry

    Dear sir,
    My self Nikhil Kumar. I am working as a Jr. Instrument Technician in Jaypee Gujarat Cement Plant Having 2.6yrs. experience in Cement Industry.
    If any vacancy in instrumentation so plz kindly inform me on my mail id or mobile no.
    E-Mail Id- nikhilinst AT gmail.com

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    post for instrument technician

    Instrument Technician
    PRASAD .D.GAIKWAD,
    MUMBAI-400 008
    INDIA.

    e-mail : prasad290588 AT gmail.com,

    OBJECTIVE :
    To pursue a rewarding career in the field of Technology by facing the challenges in the environment, to utilize my skills and abilities in the field that offers Professional growth while being resourceful, innovative and flexible.

    EDUCATIONAL QUALIFICATION :
    - ITI from Mumbai in 2005 with an first class of 67 %.
    - SSC from DGT high school mumbai in 2003 with an second class of 46.86%.
    - DIPLOMA Instrumentation Is Running With Manohar Phalke Polytechnic Mumbai

    PROFFESIONAL EXPERIENCE :
    A total of 2 years experience in INSTRUMENTATION field.

    Companies Worked with :
    1. Emadad L.L.C - Ruwais Refinery Division (Shutdown)
    Abu Dhabi (5th January 2013– 25th January 2013)
    2. Aarkey Instrumentation Pvt. Ltd (August 2012– October 2012)
    3. Narmada Offshore Pvt. Ltd.( June 2012– July 2012)
    4. Ani Instrumentation Pvt. Ltd.( November 2011– April 2012)
    5. Miraj Instrumentation & Control(November 2006 – March 2007)
    6. H.P.C.L Apprenticeship In Instrumentation (October 2005
    (October 2005 -October 2006)

    AREAS OF INTEREST :
    - Instrumentaion in Oil & Gas, Petrochemical industries.
    - Power Plant Instrumentation.
    - Industrial Instrumentation.

    PERSONAL DETAILS :
    Name : Prasad. D. Gaikwad
    Date of birth : 29-05-1988
    Sex : Male
    Nationality : Indian
    Language known : Marathi, English, Hindi.

    DECLARATION :
    I hereby solemnly declare that the details furnished above are true to the best of my knowledge and belief.

    Prasad Gaikwad.

  6. Post Count Number #6
    Unregistered
    Guest

    instrument technician

    i am a instrument technician i have a total 5 year expereience