Electrical Engineer : Resume CV

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Electrical Engineer : Resume CV

    mohamed nizamudeen
    mhdnzm AT gmail.com
    Electrical engineer

    RESUME :
    S.Mohamed Nizamudeen
    E-mail : mhdnzm AT gmail.com

    PROFESSIONAL PROFILE :
    As a Fresher in Bachelor of Engineering from Electrical and Electronics Stream seeking a position wherein can utilize my calibre .

    OBJECTIVE :
    Intend to build a career with long corporate of hi-tech environment with committed and dedicated people, which will help me to expose myself fully and realize my potential. Also willing to work as a key player in challenging and creative environment.

    ACADEMICS :
    Qualification Institution Period Percentage of Marks obtained
    B.E National College of Engg,
    Tirunelveli. 2005 -2009 66%
    H.S.C Govt Hr Sec School,
    Moolaikaraipatti. March – 2005 65%
    S.S.L.C Govt Hr Sec School,
    Moolaikaraipatti. March – 2003 84%

    SOFTWARE SKILLS :
    1 AUTOCAD in Electrical & Mechanical.
    2 MS Office & Basics of C

    AREAS OF EXPERTISE:
    1 ELECTRICAL MACHINES
    2 PROTECTION AND SWITCH GEAR
    LANGUAGES KNOWN :
    Tamil & English

    EXPERIENCE:

    Company : CSC computer (p) ltd
    Designation : Electrician
    Duration : Mar 2010 to Aug 2010
    Responsibility : Electrical maintenance
    PERSONAL SKILLS :
    1 Good verbal and written communication skills
    2 Comprehensive problem solving abilities
    3 Ability to deal with people diplomatically
    4 Willingness to learn
    5 Team facilitator

    Academic Project :
    Title : PLC BASED INDUSTRIAL FAULT MONITORING
    AND CONTROLLER.
    Descrption :
    This project deals with the fault detection and control of the
    industrial equipments using Programmable Logic
    Controller(PLC) . The key components used for the fault
    managements purposes are the PLC and PC using
    language , which depicts the fault causing parameters.
    The major fault control is done with PLC by tripping the
    faulty circuit if the fault persists even after the detection.

    E-mail : mhdnzm AT gmail.com
    Declaration :
    I declare that the above furnished details are true and correct.
    Place : Tirunelveli
    Date :
    (S. Mohamed Nizamudeen)

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    RESUME
    Name : K.SENTHILKUMAR
    Life Goal : To become Manager of a Multi National Company in the year 2020
    Objective : To take up new challenging assignments in O&M dept.
    Preferred function : Maintenance Engg / Vendor development / Lean, TPM promotion
    Total years of Exp : 15 Years 8 Month in various functions of Operation & Maintenance dept.
    Educational Qualification : Diploma in Electrical And Electronics Engineer- 1994
    Additional Qualification : (1) Diploma in Computer Application-1995
    (2) Diploma in Chemical Process Instrumentation control - 1997
    (3) Diploma In AUTO CAD (R-14) - 1999
    (4) Bachelor of Development and Information Technology- 2003
    (5) M.SC- Software Engineer - 2009
    (6) Undergoing DEGREE in Electrical Eng –AMIE- 2010 – Institution of Engg (India), KOLKATTA.
    Current Employer : M/s Chemplast Sanmar Ltd.,(Petrochemical Div.)-Karaikal.
    Current designation : Engineer - Maintenance
    Salary Drawn : Rs 3.4 lacs, pa
    Salary Expected : Negotiable
    Time to Joining : 60 days

    E-mail id : k.senthilkumar AT rediffmail.com

    Reason to leave : Carrier growth and to widen my managerial & leadership skills.
    Behavioral Skills :
    Good Communicator, Conviction to System, Passion on Problem solving.
    Ability to move socially and Self-Motivated.
    Quick Learner and work well as a team.
    Speed and ability to quickly adopt to change.
    Technical Skills : Maintenance and Operation of Refinery / Pharma / Bio-Pharma / Petrochemical Industrial Equipments.
    Maintenance and Operation 110 KV switch yard equipment and their protective systems.
    HT / LT Equipment Maintenance.
    Operation and Maintenance of Capitative Power plant.
    Maintenance of Rectifier Transformers.
    Maintenance of Distribution Transformers.
    Maintenance of HT/LT Motors and their protective system etc..
    AC/DC drives, Thyristor based rectifier maintenance.
    Battery Bank and Battery charger maintenance.
    Having “C” certificate (issued by TamilNadu Electricity Board).
    General Skills :
    Hand on Experience in SAP software ( for PR,PO, AMC,Material Handling,History card updation,etc.,)
    Strong in Systematic Trouble shooting and Problem Solving of all types of Electrical Equipments.
    Having Knowledge in TPM, TEM programme.
    Trainings undergone :
    Participated in Integrated Management System(as Per ISO 19011 – 2002 std)- ISO 9001, ISO 14001, OHSAS 18001, SA 8000 implementation.
    Participated in House training programme for 5s and Self development.
    Participated in FIRST AID and FIRE DRILL programme.
    Participate training programme for Application of PLC using Process Industries.
    Work experience at a glance:
    Current Employer : M/s Chemplast Sanmar Ltd., Senior Engineer
    Employer 5 : M/s Biocon Ltd., 3 yrs, Executive.
    Employer 4 : M/s Pharm Products Pvt Ltd., 1.5 yrs, Junior Engineer.
    Employer 3 : M/s JK Pharmachem Ltd., 5 yrs, Technician.
    Employer 2 : M/s Madras Refineries Ltd., 1 yrs, Technician Apprentice.
    Employer 1 : M/s Delta Eng Service, 2.4 yrs, Electrician (MRL-CBR)
    Employer 1 : M/s Delta Eng Service, Panangudi, Tamil Nadu,
    Year of experience : 2.4 years (Mar’ 95 to June’ 97)
    Designation : Refinery Electrician
    Job description : Plant Lighting, Motors Preventive Maintenance.
    Employer 2 : M/s Madras Refineries Ltd., Panangud , Tamil Nadu.
    Year of experience : 1 year (Jul’97 to June’98)
    Designation : Refinery Technician
    Job description : 110KV operation, Preventive Maintenance for Electrical Equipment.
    Employer 3 : M/s JK Pharmachem Ltd., Cuddalore, Tamil Nadu.
    Year of experience : 5 years (Oct’1999 – Jan’ 2005)
    Designation : Senior Technician
    Job description : Operation and Maintenance 110 KV switch yard, HT/LT Motors, Distribution Transformers, Fermentation process equipments, AC/DC,
    drives, LTDG,etc.,
    Employer 4 : M/s Pharm Products Pvt Ltd., Thanjavur, Tamil Nadu.
    Year of experience : 1.5 yr (Feb’2005 to Jul’2006)
    Designation : Junior Engineer
    Job description : Planing and Monitor day to day dept activities,Improve record
    maintenance, TPM practices, Cost control / saving activites, M/c
    condition monitoring, Prepare MIS report for every month,etc.,
    Employer 5 : M/s s Biocon Limited,
    Year of experience : 2 yr (Aug’2006 to Sep’2008)
    Designation : Executive
    Job description : Planing and Monitor day to day dept activities, record and History
    card, Critical spares Maintenance, TPM practices, Cost control / saving activites, M/c condition monitoring, Prepare MIS report for
    every month,etc.,
    Current Employer : M/s Chemplast Sanmar Ltd.,
    Year of experience : From Oct’2008 – till date
    Designation : Senior Engineer-Maintenance And Operation
    Job description : Planning and Monitor day to day dept activities, Handling Equipment
    History, Preparing PM schedule and execution, IMS practices,
    Development and Modification of system, PR / PO / AMC and Material
    handling activity, dept annual / qtrly PQC targets, Review of “plan Vs actual”, take timely actions to achieve targets, Planning for Annul Budget, Cost saving activities, Equipment condition monitoring, New Project Execution, Men power planning, Training, Motivating & Encouraging team members EMS – Hazard risk study, Aspect Impact study, Coordinate Auditors etc, Prepare MIS report for every month,etc.,
    Carrier Highlights & Achievements
    Change SOFT Starter instead of VFD for Fermentation Agitator Motor to avoid frequently failure of Thyristor, unwanted break down ,Production loss, Maintenance cost saving and Energy Saving purposes.
    Modify Load Shed Patten in PLC (ROCKWEL) to avoid plant Block out, Production Loss, Reduced fuel (diesel) consumption and saving fuel cost, GRID utilization (100%)
    11th and 13th HFB commissioned to improve POWER FACTOR and Raised GRID power consumption. Grid under Voltage Load shed trip interlocks implemented to avoid block-out of the plant.
    I hereby affirm that the above information’s are true and correct to best of my knowledge.
    Yours faithfully,
    Date :
    Place : Nagapattinam
    (K.SENTHILKUMAR)

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    D.CHAKKRAVARTHY. B.E (Electrical & Electronics)
    Mob : 09729124283 E-mail: chakkravarthy_wabag AT rediffmail.com
    CAREER OBJECTIVE :
    Intend to be a part of an Organization where I can show cast my Knowledge and Key skills with freedom for a betterment of both the Organization and my career.
    KEY SKILLS :
    - Honey well DCS Maintenance and Trouble shooting.
    - Rockwell PLC Maintenance and Troubleshooting.
    - Foundation Field bus System Maintenance.
    - Transformer Erection, Testing & Commissioning.
    - Substation Erection and commissioning
    - Steel Plant Electrical Maintenance.
    - Water treatment Plant Electrical and Instrumentation Maintenance.
    QUALIFICATION :
    - Bachelor degree in Electrical and Electronics Engineering from K.S.R Collage of Engineering, Anna University-2008.
    - Diploma in Electrical and Electronics Engineering from K.S.R Polytechnic College- 2005.
    ADDITIONAL TRAININGS AND CERTIFICATES :
    - PLC Automation in ABB software.
    - Auto Cadd in Electrical
    - UNIX C & C++
    - Implant Training at Bharat Sanchar Nigam Limited, Erode.
    - Training at Mettur Thermal Power Plant, Mettur.
    - Training at Central Power research institute (CPRI), Bangalore.
    - Training at Salem steel plant, Salem
    - Training at Kadamparai Power House, Kadamparai.
    PROFESSIONAL EXPERIENCE
    M/s. Vatech Wabag Ltd.,
    From January 2010 – till date.
    Electrical & Instrumentation Engineer.
    Project :
    Operation and Maintenance of RO-DM Plant for Indian Oil Corporation – Panipat Naphtha Cracker Unit.
    Systems Handled :
    - Maintenance of DCS (Honey Well Experion PKS)
    - Maintenance & Calibration of Instruments (Pressure Gauge, Pressure Transmitter, Temperature Gauge, Temperature Transmitter, Level transmitter, Flow Switch, Flow Transmitter, Actuators, Pneumatic valves, Thermostat, RTD and Thermocouple).
    - Maintenance & Calibration of Analyzers like Silica, OIL, pH, Conductivity, TOC, NTU, ORP and Hydro Carbon analyzer.
    - Maintenance of Electrical Motors, Connectivity with DCS System, Relays, Contractors, Circuit Breakers etc.
    Key Responsibilities :
    - Overall in charge of Electrical, Instrumentation and control for Operation and Maintenance of RO –DM plant.
    - Manpower Management
    - Ensure 100 % availability of Instruments for Operation.
    - Ensure Preventive Maintenance Schedules and Minimize Breakdown maintenance.
    - Client Liaison
    - Documentation as per ISO requirements
    Tamil Nadu State Electricity Board
    Dec 2008 – Dec 2009.
    Graduate Apprentice Training
    Project :
    Erection and Commissioning for Substation and Transformer at General Civil Construction unit Erode
    Systems Handled :
    - Erection, commissioning and Testing of Power Transformers Upto 100 MVA
    - Erection, Commissioning and Testing of Substation Upto 110 KVA
    Key Responsibilities :
    - Testing of Power Transformer which includes Pre –Commissioning test like Open circuit Test, Short Circuit Test, Insulation resistance Test ,Back to Back Test and Ratio Test
    - Testing of Current Transformer and Potential Transformer which includes Pre–Commissioning test like Insulation Resistance, Polarity tests, Excitation Test and Ratio Test.
    - Power Transformer Check alarm and trip circuit like MOG, Winding resistance winding temperature, oil Resistance , Oil temperature and Buchholz trip
    - Operation and maintenance of Over current relay, no load relay and earth fault relay
    Hi Tech Mineral industry Covai Private Ltd
    June 2008 – Dec 2008.
    Electrical Engineer Trainee
    Project :
    Steel Melting and Rolling Plant
    Systems Handled :
    - Maintenance of Electrical motors upto 180 HP
    - Handling EOT CRANE for 10 TON
    - Handling the DOL Starter & Autotransformers
    Key Responsibilities :
    - Operation and Maintenance of 6.6 KV ,11KV , Isolator handling and vacuum circuit breaker
    - Operation and maintenance of electrical motor and drives controlling systems
    PROJECT DETAILS :
    1. Title : High Frequency Induction heating using MOSFET
    Description : In this project, to design the control circuit for produce High Frequency to induction of power (heat) by using MOSFET device.
    2. Title : Automatic Control of Submersible Motor.
    Description : In this project, motor runs the preset time control and senses dry condition will stop running.
    3. Title : Magnetic Levitation. (Mini Project)
    Description Title;: In this project, floating the metal ball only by the magnetic field.

  4. Post Count Number #4
    Unregistered
    Guest

    RESUME
    M.NAGARAJAN, E-mail :raj_naga2007 AT yahoo.co.in
    D.I.P, rajsusee.naga81 AT gmail.com

    JOB OBJECTIVE :
    Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people ,which will help me to explore myself fully and realize my potential willing to work as a key player in challenging & creative environment.

    EDUCATIONAL QUALIFICATION :
    Bachelor Of Engineering (B.E), Electrical and Electronics Engg , P.E.T Engineering college, Anna University. 2005-2008 68%
    Diploma Of Engineering, Electrical and Electronics Engg ,
    Directorate of Technical Education, K.N.S.K Polytechnic college
    Nagercoil 2003-2005 88.6%
    XII (Higher Secondary School of Education) S.M.R.V Higher Secondary School,Nagercoil

    COMPUTER KNOWLEDGE :
    2002-2003 71.58%
    - Electrical AutoCAD
    - M.S office
    - M.S excel

    EXPERIENCE :
    ALZAROONI ELECTRO MECHANICAL LLC,DUBAI,U.A.E
    August 2012-Till date
    Position : ELECTRICAL ENGINEER.

    Job Profile :
    - Preparing Material submittal form and shop drawing approval form.
    - Implementation, planning, scheduling and allocation of Human and material resources.
    - Delegating, Monitoring and controlling of site activities as per programming schedule and planned activities.
    - Checking daily, weekly site report and comparing with method of statement.
    - Testing and commissioning of Electrical systems.

    CONARES METAL SUPPLY LTD, DUBAI, UAE.
    REBAR Rolling plant(Siemens-Italy)Project
    May 2009- May2012
    Position : ELECTRICAL ENGINEER.

    Job Profile :
    - Having 3.0 years professional experience for Siemens Vai Rebar(Rolling) plant project ( Erection,commissioning,Maintenance).
    - Commissioning and maintain the whole plant, (Electrical motors,Drives,Plc,sensors,Generators..etc)
    - Coordinating machine erection, Installation of panels and drives with Siemens engineers.
    - New project based on designing electrical line diagrams, detailed cable rooting and designing of connections for sensors.
    - Laying of cables for whole plant and termination for panels and motors.
    - Preparing the process sheet and bill of materials for project and verifying the process details for all electrical equipments.
    - Responsibility for technology transfer, Engineering decision and Technical supports to project.
    - Organize erection and maintenance team.
    - Maintaining Safety Precautions.
    - Maintain Shift control of Labors.

    Responsibilities :
    Responsible for the complete electrical erection in plant this includes LV substation, LV Panels, distribution board, control panels and also doing the co -ordination of the Siemens technical engineers for the project development and co-ordination of meetings with contracting managers and directors.

    STERLING AND WILSON PVT LTD
    CHENNAI
    JULY 2008 to APRIL 2009
    Position : ELECTRICAL SITE ENGINEER
    Job Profile :
    - Supervise the whole plant,
    - Arranging the cable schedule,
    - Fixing the Main D.B(Distribution Board),
    - Fixing the L.V panels,
    - Arranging the cable trays and erect the cable trays,
    - Laying the Cables,
    - Organize erection and maintenance team.
    - Maintaining Safety Precautions.
    - Maintain Shift control of Labors

    Responsibilities :
    Responsible for the complete electrical erection in Particular period, and co-ordination of meetings with contracting managers and directors.

    LANGUAGES KNOWN :
    Speak : English,Tamil,Malayalam,Hindi.
    Write :Tamil, English

    PERSONAL PROFILE :
    Name : NAGARAJAN.M
    Father’s name : U.MURUGAN
    Sex : Male
    Marital status : Single
    Visa Designation : Electrical Engineer
    Visa Status : Employment

    Date of birth : 15/05/1986

    DECLARATION :
    I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibility for correctness of the above mentioned particulars.

    Place : NAGARAJAN .M

    Date :