March 30th, 2011, 11:27 AM
Post Count Number #1
IJT addict
Site Execution Engineer : Resume CV
RESUME :
AMARKUMAR M. INGLE
E-mail : i.amarkumar AT yahoo.com, amarkumaringle AT hathway.com
Objective :
To seek and strive for a distinguished position in mechanical construction field by applying the best of my potentials, skills and attitudes earned in profession that will keep me abreast of the latest trends and practice followed in piping and welding engineering and technology.
DETAILS OF ORGANISATIONS :
I. NOTE : This is first ultra mega power plant in india(coal fired).
Company (At Present) : L&T-ECC (TPPC –DIV.) .INDIA.
Projects :
1)4000 MW THERMAL POWER PLANT.
2)800X2 MWAPPDCL THERMAL POWER PLANT.
Client :
1)TATA Power Company Ltd, COSTAL GUJRAT POWER
2) APPDCL LTD(Andrapradesh government )
Duration :
1)April 1 to 18 Jan 2011
2)24 Jan. To Till
Experience :
Experience in Power, Oil & Gas sector Mechanical Construction field of piping and welding as a Mechanical Engineer in Mechanical Engineer-Piping & Welding in Project Management Department for Power, Oil and Gas companies.
Present Position : Erection / QA / Planning / SiteExecution Engineer
Activities includes :
- Co-ordination with Project team members (HO & Site), EPC Contractors and Supporting departments
- Planning & Monitoring of the project progress w.r.t Time & Cost
- Ensures effective coordination of all project execution activities taken up by different functions such as Civil, Mechanical, Electrical and Instrumentation
- Provides professional direction and guidance to project team in matters related to engineering standards, project specifications, quality etc.
- Assist Project Head in the preparation of project execution schedule and assigning and allocating resources for project to ensure successful completion of project meeting time, quality and cost parameters
- Assists Site Head in mobilization of resources such as manpower, plant & machinery, funds, site facilities etc. for smooth execution of project
- Studies and interprets project specifications (designs/drawings etc.) given by the consultant for awarded contracts and obtains clarifications wherever necessary
- Provides professional direction and guidance to project team in matters related to engineering standards, project specifications, quality etc.
- Verifies the invoices raised and recommends for release of payments to contractors/sub-contractors, suppliers etc.
- Executed for the Mechanical part of the Fabrication, Erection, Inspection and Commissioning of Generator , HP & LP Turbine, Piping , Rotating machineries and other Auxiliary Plants such as TG building , Compressors ,Cooling water system etc.
- piping layout Responsible for complete engineering of Surface condenser , feed water heaters ,dearators, vaccum pump ,TG auxillaries system , final alignment & making protocol of equipment.
- Responsible for day to day supervision of works ,planning ,scheduling , monitoring of project ,billing of contractor ,quality control and assurance, Co-ordination with various interfaces for high rise structure ,making a erection procedure .
- Anchoring on-site erection & commissioning activities and ensuring completion of project within the time & cost parameters and effective resource utilisation to maximise the output.
- Installation and commissioning of the heavy equipments as well as conducting tests & inspections to ensure operational effectiveness of Power plant & utilities.
- Code knowledge ASME (B31.1, B31.3, B31.4, B31.8), ASME Sec. 9, Sec. 8,
AWS, ASTM, IBR & ISO-9001 :2000
- Preparation of relevant procedure/method statements and project required WPS's
- Preparation requisitions, purchase orders and review of vendor drawings as per project specs
- Co-ordination with Client for vendor inspections & other discipline departments
- Review and Verification of incoming materials and consumables
- Documentation (Drawings, Method Statement procedures as per project specs)
- Co-ordination meeting with the client and sub-contractors
- Raising Technical Queries for piping and welding requirements
- Inspection of Steam Drums, Steam Header, Pipes, Pipe Fittings, Valves, Witness Hydrostatic Test
- Review of drawings, WPS & PQR as per project specs.
- Verification and Inspection of incoming piping and welding materials & consumables
- Process piping and welding requirements according to codes and standards
- Witnessing of Qualification and certification of welders as per ASME Sec IX
- Review of NDT Reports ( RT, PT )
- Review the reports of PWHT and Hardness test .
Company : M/S Industrial Manufacturer pvt ltd.
Navy Mumbai, Maharashtra
Major client :
- Reliance industries ltd. Hazira , patalganga,Jamnagar,panipat
- I O C L . panipat , haldia .
- L & T chiyoda ltd.
- I P C L . gandhar .
Position : QA/ Planning/Procurment engineer. (Piping & Welding)
Duration : Jun 2006 to march 2009
Responsibility :
- Review of drawings, WPS & PQR as per project specs.
- Review and Verification of fit-up, erection and daily welding reports in Shop .
- Verification of piping fabrication, erection and welding for Alloy Steels like CS, Low Alloy Steel, SS-316, 304, 321, 358, Duplex SS, Monel, Hastalloy, Alloy20, Zecor
- Arrangement of Qualification and certification of welders as per ASME Sec IX
- Review of NDT Reports ( RT, PT ) & Interpretation of RT films
- Witness of various NDT / Destructive like Bend, Tensile, Impact, Hardness, DP Test, Hydro / Pneumatic Tests, Review of Radiographs film.
- Review of Drawings to confirm material / welding procedure / non-destructive testing, preheat and post-weld heat treatment requirements and correctness of identification and traceability to the project specification .
- Ensure the generation of document and quality records required for submission to the customer during various stages & meetings on the project.
- Final Inspection , making final document and handling third party surveyor m/s LRA , M/S BVIS , M/S TUV ,M/S DNV, M/S CHEMPRO , M/S CHEMTEX , M/S IRS ,IBR etc.
- To study the technical specification and data sheets and zero revision drawings to ensure the correctness of QAP
- Compliance of Documents as per the job status and as per the Purchase Order . .Responsible for updating and maintaining calibration of new and in use quality control instruments.
Planning & procurement of capital purchase of New Testing / Quality control Equipments required
- Review the reports of PWHT and Hardness test
- Quality activities on procurement
- Raising Technical Queries(TQ) and resolving as per site requirements
- Identify, communicate & manage changes to project work assigned
- Process piping and welding requirements according to codes and standards
- Co-ordination with procurement and vendor for client inspection at vendor premises,
- Inspection & testing of shop Fabrication Eqpts. such as Towers columns Pressure vessels, Heat exchangers, Reactors , Tanks & some Instrumentation Items.
QUALIFICATION :
Bachelor of Engineering (BE) in Mechanical Engineering(appered 6 th semester) from RVD University , INDIA
Diploma in Mechanical Engineering (DME) from MSBTE , INDIA.
NDT LEVEL 2 IN RT & LPT From QCS.
Certificate Course in AutoCAD (Rel. 14 & 2000) from HABITAT CONSULTANT.
COMPUTER SKILLS :
- DOS 6.22, Windows 98 & 2000, Win XP
- MS-Office 2003
- AutoCAD (Rel.14 & 2000)
DECLARATION :
I do hereby declare that all the above mentioned particulars are true and correct to the best of my knowledge and belief.