-
March 29th, 2011, 05:32 PM
Post Count Number #1
Telecom Regulatory Authority of India Recruitment 2011 www.trai.gov.in : Hindi Section Officer
Telecom Regulatory Authority of India Recruitment 2011 TRAI : Hindi Section Officer
Name of the Organization : Telecom Regulatory Authority of India (TRAI)
Company Address :
THE TELECOM REGULATORY AUTHORITY OF INDIA
Mahanagar Doorsanchar Bhawan,
(next to Zakir Hussain College)
Jawaharlal Nehru Marg
(Old Minto Road)
New Delhi : 110 002
Name of the Post : Hindi Section Officer
No of the Post : 01 posts
Pay scale : Rs.9300-34800 + Grade pay Rs.4600/- pius Allowances
How to Apply :
Send filled application form and copies of certificate to
the Senior Research Officer (A&P), Telecom Regulatory Authority of India, Mahanagar Doorsanchar Bhawan, Jawaharlal Nehru Marg, (Old Minto Road), next to Zakir Hussain College, New Delhi-110002
Last Date of Application Receipt : 11 Apr 2011
Detailed Advertisement : http://www.trai.gov.in/vacancypre.asp?id=146
Application form Download : http://www.trai.gov.in/applicationform.asp
Company profile :
The Telecom Regulatory Authority of India Act, 1997, as amended vide the Telecom Regulatory Authority of India (Amendment) Act, 2000, specifies that the Authority shall consist of a Chairperson and not more than two whole-time Members and not more than two part-time Members.
***************
General Instructions :
This is information on Telecom Regulatory Authority of India (TRAI) Recruitment 2011 / Vacancies / Careers / to be filled, for the post of Hindi Section Officer.
If you are looking for jobs / career in Telecom Regulatory Authority of India (TRAI), you have to apply by downloading the application form given in the link above.
Full details of recruitment in Telecom Regulatory Authority of India (TRAI) can be had from the detailed advertisement link as given above.
You can also visit the careers page of Telecom Regulatory Authority of India (TRAI) to know more about the selection procedure, latest results, other jobs vacancy requirements etc.
Please ensure that you apply before the last date as all government recruitment procedures adhere a strict policy on this.
***************
-
May 13th, 2011, 03:24 PM
Post Count Number #2
IJT addict
shibli nomani
-------------------------------------------------------
The submitted value of field named "Email :" is:
-------------------------------------------------------
shibli99110 AT rdiffmail.com
-------------------------------------------------------
The submitted value of field named "Designation / Name of the Post / Skill Set" is :
-------------------------------------------------------
telecom engg
-------------------------------------------------------
The submitted value of field named "Copy Paste Your CV / Resume Here :" is:
-------------------------------------------------------
SHIBLI NOMANI
E-mail :
Shibli99110 AT rediffmail.com
Experience :
As BTS ENG.(INSTALLATION &COMMISSIONING ENGR) (IN TELECOM)
4.6Year Working)
Projects Domain :
- Telecommunication
Assets :
- Dynamic and Effective team member
- Effective Communication and analytical skills
- Highly motivated for innovative work.
Areas of Interest :
NETWORKING
GSM/CDMA sector.
TRAINING :
# On GSM SYSTEM OVERVIEW provided by ZTE.& NOKIA
# Under vocational training at B.S.N.L Patna.
Objective
Be part of a growth-oriented organization in the GSM sector.
To handle challenging roles in the fast growing organization’s in the field of TELECOM. My objective should be to provide good growth, potential and wide exposure to the organization in which I am working, by utilizing my
Skills and abilities to the latest technologies in the field of TELECOM.
Professional Experience
1. COMPANY NAME : REECOMPS (TSP), MUMBAI
Duration : From January 2010 to Dec2010
Client : NOKIA /BIHAR
Designation : IMP Engg.
Equipment : NOKIA BTS(ULTRA,FLEXI),MW,
Power plant(Eltec,zte,Delta),AT,ALARM
2. COMPANY NAME : SPACE GULF TRADING COMPANY.
A telecommunication Base Company in ADSL (Asymmetric Digital Subscriber Line) project, Infra work of tower and optical project in Riyadh (Saudi Arabia).
Designation : Project lead
Duration : From February 2009 to November2009
3. COMPANY NAME : ZTE INDIA PVT LTD
Out source from ADECO NETWORKS
INDIA PVT.LTD. In NE cluster.
Designation : Resident Engineer.
Duration : From April 2008 to July2008
Client : TTSL/BIHAR
Equipment/Job : ZTE BTS(MBTS,CBTS),ZTE POWER
POINT,
4. COMPANY NAME : IWS, BIHAR REGION
Designation : Site Engineer.
Client : NOKIA
Duration : From April 2006 to April2008
Equipment/Job : NOKIA BTS(ULTRA,FLEXI),MW,
Power plant(Eltec,Delta),AT,ALARM
Cabex,Swapping,VSWR(Site master)
- Working as a Installation & Commissioning engineer for ALCATEL BTS .Working as a Installation & Commissioning engineer, Transmission for NOKIA BTS, Interigation of New site,CABEX site ,BIHAR.Experience ZTE BTSInstallation, Commissioning and Integration of (ZTE I0,I1 I2,I3 )BTS.
- Site Integration, Alarms Testing, E1 Testing from BTS site to BSC..
- VSWR Measurement, Return Loss Measurement, Reverse Power Measurement.
- Site troubleshooting and rectification of ZTE BTS and Microwave Link.
- SITE swapping ,site supv. ZTE BTS.
Daisy chaining of sites. .
- E1 roughing for new sites & Implementing EDGE technology to existing sites expanding.
- Existing configuration to new configuration .
Summery
- NOKIA BTS, its operation and maintenance.
- Working experience on Ultra /Flexi BTS.
- Commissioning of NOKIA BTS and Alarm Tests.
- Presently working as IMP Engineer in Bihar.
- Comfortable with BSC Equipments and its maintenance, E1 extensions, commissioning of FIU..
- Worked On ADSL Project for STC
Tools Worked On
SENSOR, POWER METER, ELLIEMENT, SITE MASTER
Working Experience on BSS
- O&M- alarm handling, regular backups.
- Reduce BTS down time, Man management.
- BTS site loading at BSC..
- Integration of BTS (RBS2206).
- Trouble shooting of BTS..
- Traffic-Routing & Network Expansion as per the requirement.
- Maintaining BTS outage report, inventory list, SITE status and maintenance report and forwarding it to next layer.
- Coordinate with team & vendor to ensure faulty utilities are repaired or replaced on time.
- Interact with RF team to Prepare DTs for New site integration and Third sector addition.
Previous Working Experienced
- V.S.W.R TESTING
- Plan, control and follow up the implementation of the project.
- To monitor day to day progress on the project.
- To ensure that cost and revenues are in accordance with budget and contract respectively.
- Follow up the payments for vendors/sub-contractors with vendor management department.
- To be responsible for acceptance of network by customer in the respective cluster.
- To hand-over the network to support after commissioning/acceptance by customer..
- Installation of all parts of BSC.
- Testing and fault detection of E1, Loop in fibers.
- Testing of various alarms.
- E1 connectivity..
- COMMISSIONING
- Generating Daily Reports
- Prepare SDR and WCC
OTHER WORK EXPERIENCE
1) Project Lead
2) PROJECT Implementation
Area of Exposure
- Computer Knowledge
OS : Windows 98, XP, 2000/NT
Computer Skill : M/S Office97-2003, MS-DOS, Web accessing
PROJECT WORK EXPERIENCES:-
Brief implementation of code division multiple access ( C.D.M.A ),
The concept behind CDMA is to provide
Authentic and privacy communication without interception of unauthorized users. Improved capacity, coverage and efficiency
Efficient medium rate data services’ (65-144 kb/s)
Longer battery stand by times
Efficient mobile assisted handoffs (i.e. CDMA to CDMA,CDMA to GSM)
Overview of GSM,
This project includes architecture of GSM network, like SIM mobile gives overview of different equipment, Like Base transceiver
Station (BTS), base station controller (BSC) and mobile services switching center (MSC ).
The concept behind GSM is to provide
Fully digital system using 900 MHz frequency band
TDMA over radio carriers (200 KHz carrier spacing)
User authentication for fraud control
Encryption of speech and data transmission over radio path
Low speed data services (unto 9.6Kb/s)
Support of short message service (SMS)
EDUCATIONAL QUALIFICATION
- B.E. In Electronics and communications Engineering From Maulana Azad College Of Engineering and Technology,PATNA
From Magadh University (Bihar)
WITH 74.56% .
- HSSLC (12th), 1ST Division.
From R.P.S. College,Patna
With 71%.
- HSLC (10th), 1st Division.
Adalat Hussain High Shool,Bagahi
With 70%.
Languages Known
English, Hindi, Urdu, Arabic
I hereby declare that all the information given above is true to the best of my knowledge.
Date:
Place: SHIBLI NOMANI
(E
-------------------------------------------------------
More Information about this submission and submitter:-
___________________________________________________
Submission ID : 4117703
Date & Time : 11th May 2011 7:51 AM (UTC)
IP Address : 117.197.64.12
Browser Info : Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; SV1)
Predicted Country : India
-
July 30th, 2011, 10:59 AM
Post Count Number #3
Resume
S/No Subject Brief Details
1 Name DEVENDRA TIWARI
6 Educational Qualifications M.A, B. Ed,PGDT,MBA(4thSEM)
7. Present Post Hindi Translator(Pay Scale 9300-34800+GP Rs.4200 in the PB-2
8. Service/Experience details 1. Initially appointed as a LDC in Border Roads Organization (GREF) in the pre-revised scale of Rs.3050-4590 and worked there from 07-02-95 to 20-06-99(Total service 04 yrs 04 Months)
2. Then selected by SSC and posted as a Jr. Asstt in the pre-revised scale of Rs.4500-7000 in Security Paper Mill,Hoshangabad and worked on that post from 21-06-99 to
10-11-2003(Total service 04 years 04 Months)
3. Presently working in the post of Hindi Translator in the PB2 scale of 9300-34800+Grade pay Rs.4200 from November 2003 .(EXPERIENCE as a translator on date : 07 yrs 10Months)
4. Total service As on date : 15 Yrs 05 Months approx.