Control Room Engineer : Resume CV

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Control Room Engineer : Resume CV

    K.Karthik
    E-mail- karthiksath AT gmail.com

    Experience :
    Present Employer : Doosan Heavy Industries and Construction Co ltd.
    Period : Feb-2008 to till date
    Position : Control room Engineer (Jebel Ali M station)
    Current Project : Jebel Ali power and desalination station ‘M’, (2058MW at Amb50°C) Dubai
    1. GT (V94.3) gross output : 234.10 MW with evaporative cooler
    ON and under reference site ambient conditions. (6 unit)
    2. STG (AlstomHDC200/2AS-NE33AU) gross output : 217.83 MW (3 unit)
    3. HRSG : HP: 427.0 T/Hr AT 556.8°C & 103 bar.a
    LP : 36.2 T/Hr AT 166.1°C & 3.4 bar. a
    4. MSF : Steam flow: 2195.9 T/hr –105 MIGD 30°C sea water Temperature.

    Feb 2008-Dec 2009 :

    Barka phase II Power and Desalination Project, Oman (734MW at Amb50°C)
    1. GT (V94.2) gross output
    : 138 MW with evaporative cooler
    ON and under reference site ambient conditions. (3 unit)
    2. STG (Siemens SST900) gross output : 160 MW (2 unit)
    3. HRSG : HP: 327.0 T/Hr AT 532°C & 84.5 bar. a
    LP : 38 T/Hr AT 207°C & 6.5 bar. A
    4. Reverse osmosis : 26.5 MIGD AT 30°C sea water temperature.

    Working Exp in the following DCS systems :
    1. ABB infy90
    2. Siemens SPPA T2000
    3. Siemens SPPA T3000
    4. Alspa p320

    Responsibilities :
    COMMISSIONING :
    Involved in various commissioning CONTROL ROOM activities during commissioning phase such as
    - Commissioning of Gas Turbines and its accessories
    Loop checks of field instruments like pressure transmitters, Thermocouple, RTD, pneumatic valves etc...
    - Air blowing of gas lines, Steam blowing of boiler steam lines, flushing of oil lines in gas turbine
    - Commissioning of steam turbines and its accessories

    OPERATION
    :
    Currently working as a central control room Engineer involving in
    Operation of entire power plant from control room.
    - Monitoring the power output depending on the grid conditions / climatic conditions/process requirement, Ensuring all safety systems / interlocks are in line and healthy
    - Handling of any fluctuations like grid disturbance / utility failure like failure of instrument air, cooling water etc., coordination with field operator.
    - Operation of HRSG from control room - maintain the steam output / quality by operation of HRSG from DCS / BMS PLC and in coordination with HRSG field operator.
    - Operation of diverter / guillotine dampers / supplementary firing depending on steam demand
    - Monitoring the stack emissions like Sox, Nox, and O2 and adjust take corrective actions if required.
    - Operation of Utilities like Instrument air system, gas conditioning system in coordination with field utility operator. Responsible for running the plant in optimum condition by going through the trends / reports of process parameters

    Education :
    1 Bachelors degree in Electrical and Electronics Engineering from P.S.R
    Engineering College, affiliated to Anna University, May 2007 - 70%

    Engineering project:
    Project profile:

    Project Name : SCADA for Power Plant Generator output variations
    Language : C
    Place : Ennore Thermal Power Station
    Description :
    SCADA is Supervisory and control system which is used to monitor and control the “power plant generator output variations”. SCADA represents a system which consists of a number of remote terminal units (RTU) collecting field data connected back to a master station via a communication system. SCADA systems operate with real-time data in order to carry out real-time optimization of various processes, which translates to more efficient, reliable and safer operations.

    Declaration :
    I solemnly declare that all the above written particulars are true to the best of my knowledge and belief.

    K.KARTHIK

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Curriculum Vitae :
    Vasudev Shukla
    E-mail :Vashu2140 AT gmail.com

    Objective
    :
    To work in a growth oriented organization and employ the knowledge and skills gained during the course of study so as to contribute to the team effort to achieve group goals and at the same time to acquire new and sophisticated skills as they come.

    Education
    :
    Professional Qualification :
    - Programmable Logic Control’ vocational course from ATI Kanpur.
    - BTECH(Electronics & Communication Engineering) from
    MARATHWADA Institute OF TECHNOLOGY , Bulandshahr in
    2011 with 64%
    Intermediate :
    From P.P.N. Inter collage, Kanpur, in 2002 with 50%
    Affiliated to U.P. Board. ALLAHABAD
    High School :
    From R.K.MISSION HIGHER SECONDARY SCHOOL, Kanpur,in2000 with 52%
    Affiliated to U.P. Board. ALLAHABAD

    Computer Skills
    :
    - Knowledge of MS-OFFICE
    - Knowledge of working on PLC Software
    - Proficiency in Microsoft Windows 98, Windows XP Home, etc.

    Work Experience
    :
    - Presently working on a project of Bottle filling plant

    Summer/Vocational Training
    :
    Analysis of work in a Hydro Power Plant at N.T.P.C.,Badarpur.
    Description : during this two months training I have gone through :
    - Transmission of power
    - Control of a unit
    - transformer analysis
    - electronic precipitator analysis

    Project :
    Prepared a working project on “Automatically parking system by the using of Programmable logic control”.

    Seminar
    :
    Attended a seminar on
    “Need of Automation”
    –WON 1ST prize in a national seminar on energy system
    At M.I.T., Bulandshahr.

    Co-Curricular Activities
    :
    Participated and Won in various cultural and sport activities.
    - Won First prize in ‘Circuit Debugging’ in Techno feast at MIT Bulandshahr.
    - Won First prize for ‘Best managing program’ at techno feast.
    And many others.