Mechanical Engineer : Resume CV

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Mechanical Engineer : Resume CV

    Jignesh H Panchal
    E- mail :jignesh_panchal67 AT yahoo.com; jigneshpanchal7 AT gmail.com

    Career Summary :
    Eleven (11) years of professional work experience with various prestigious Third Party Inspection & PMC of Projects & Manufacturing Unit. Excellent track record with QA / QC (Piping ,welding & structural’s ) in Oil & Gas construction industries including Refineries. Wide range of various QA/QC inspection activities in project as per applicable Client specifications, International standards and Codes practices.

    Educational qualification :
    - Diploma in Mechanical Engineering from M.S.University Polytechnic,
    Vadodara, Gujarat, India

    Professional Qualification :
    - Certified Welding Inspector CSWIP 3.1 TWI, UK.
    Certificate No. 49926 Expiry : 30/07/2015
    - ASNT LEVEL II Dye Penetrate Test (PT)
    - ASNT LEVEL II Radiography Test (RT)
    - ASNT LEVEL II Ultrasonic Test (UT)
    - ASNT LEVEL II Magnetic Particle Test (MT)

    Professional Experience :
    Company : Germanischer Lloyd’s Industrial services, Gmbh.
    Project : 1) GGSR (Guru Gobind Singh refinery), Bathinda , Punjab, India..
    Client : HMEL (HPCL Mittal energy limited-HMEL)
    Position : III party inspection - welding Inspector/ Inspection engineer
    Description : Refinery major project (DCU, PPU, Power Plant-153 MW,CDU/VDU,RODM)
    Duration : August 2010 to till date. (Ongoing project)

    Company : Toyo Engineering India Ltd.
    Project : IRUP, Gujarat Refinery, Vadodara, Gujarat, India.
    Client : IOCL, Vadodara
    Position : QA / QC Engg. (welding Inspector/ Inspection engineer)
    Description : Refinery major project (DCU, ISOM, Power Plant-60 MW)
    Duration : July – 2008 To July - 2010

    Selected Key Contributions :
    - Developed QA/QC standard inspection formats and test packages for various projects.
    - Appreciation from the client for keeping high quality standards and successfully completing of DCU Heater.

    - Hydro testing & commissioning : Review the documents for the Hydro packing list, line history, and the ITP, Procedures, NDT reports, checking the equipments like pressure recorder, pumps, NRVs, materials and witnessing the Hydro testing for the Tester header, and witnessing and monitoring of Air pigging, Foam pigging, Gauge pigging also, and monitoring the hydro testing, witnessing the golden joints welding,

    Selected Key Responsibilities :
    - Ensure subcontractor working as per the companies’ standards, specifications and standard quality
    requirements.
    - Witnessing & verifying the subcontractors WPS, PQR, Welder Qualification records& ITP for piping, tanks & structural.
    - Monitor/Follow-up of FSI (Flawless Start-up Initiative) activities during construction phase of work.
    - Check & Review Final documentation for each stage of work of each sub-contractor.
    - Attending the weekly meeting with contractors & management.
    - Preparation, Issuance and Maintenance of Non Conformance Report (NCR’s), Observation Notes, Site Queries, Site deviation Request (DVR’s) as per ISO 9001 Quality Control System Standards.
    - Checking whether the corrective & preventive actions were properly implemented.
    - Coordinate Inspection Activities & liaise with Client Engineers and respond to quality matters.
    - Incoming material inspection & related documentation.
    - Review of Mechanical Construction Check Sheets for update in the WinPCS, for client review.
    - Review the ITP’s & method statements.
    - Assist to prepare the Project quality plan.
    - Piping & Welding Daily inspection & monitor the Inspection Coverage, welder repair rate & NDT activities.
    - Witnessing the destructive & non destructive testes as per requirement.
    - Surveillance inspection of the welding parameters.
    - Verify the welder’s qualifications & validation.
    - Verification and signing off the inspection documents.
    - Test pack, NDT control sheet verification.
    - Auditing the Consumables records and Inspection documents.
    - Punch listing of the system, hydro test and re-instatement witnessing.
    - Interpretation of Radiography films.

    Coating and painting Inspection :
    - Inspection of Raw materials and verification of Test certificates
    - Review the calibration due dates for all measuring Instruments
    - After completion of Shot Blasting check the Roughness of the pipe by using Press O film,
    - Check the pre heating temperature of the pipe by using digital thermometer before the epoxy coating,
    - Check the temperature for the PE film and adhesive temp.
    - After completion of coating check the coating thickness by using of D Meter ,DFT gauges.
    - Monitoring and Inspection of Holiday testing by using of 25 K.V,
    - Monitoring and inspection of Peel of test for ever 25th pipe
    - Monitoring of all testing like Elongation test, Impact testing, slippage testing, DAC, etc.
    - For concrete coating check the pipe weight before coating and after coating, Monitoring and inspection of cube testing (7Days/28Days), density, water absorption, and weight of the concrete coating.

    Professional Experience :
    Company : Lizer Cylinders Ltd. Gandhidham. (Kutch, Gujarat)
    Position : Sr. QA / QC Engg.
    Duration : Jan. – 2008 to June - 2008

    Company : Everest Kanto Cylinders Ltd. Gandhidham. (Kutuch, Gujarat)
    Position : Sr. QA / QC Engg.
    Duration : Oct. – 2005 To Dec. – 2007
    Job Responsibilities :
    - To prepare Quality Assurance Plan / Travels for smooth functioning & Better Quality.
    - Inspection of incoming materials and preparing Incoming materials inspection report.
    - To prepare the action plan to minimize rejection & rework.
    - Sharp knowledge of different types of processes & defects related to cylinder as per Indian Standard & International Standard.

    - In process Inspection at workshop :
    a) Identification of material w.r.t Test Certificates and transfer of identity, checking the product markings as per Code & making Material Identification Report.
    b) Check the layout & set up as per drawing and prepare Inspection Report complying with Code requirements.
    c) Inspection of Top & Bottom formed Cylinders as per code.
    d) Inspection of Heat Treatment (Hardening, Quenching & Tampering).
    e) In process Hardness (Poldi – Brinnel – Rockwell) as per Code requirement.( Automatic Brinnel Hardness Tester)
    f) In process Ultrasonic Testing (Automatic Ultrasonic Testing Machine with 5 Probe) & prepare Ultrasonic Testing Reports.
    g) In process machining inspection for Neck Threading & prepare machining Reports.
    h) Witnessing of Hydrostatic Stretch Test (300 Bar) & Pneumatic (200 Bar) as per job requirements and fulfilling Code requirement.
    i) Final Inspection of the product as per the drawing and making the Final Dimension report.
    j) Check surface finish including sand blasting grade of finish and DFT.
    - Checking Non -Conformability within process and maintain quality level as per related standard (Raw material to Final finished product ).
    - Inspection co-ordination for production batch testing with the third party inspection agency like as BIS; SGS; Lloyds register.
    - Also I have knowledge of different types of test as...
    - Tensile, Bend and Impact test , SSCR.
    - Hardness test (Poldi – Brinnel – Rockwell)
    - Ultrasonic – Magnetic Particle – Dye Penetrate Test.
    - Pressure Cyclic Test, Hydro Burst Test, Bonfire testing.
    - Proto Type Testing

    Company : Birla NGK Insulator Pvt. Ltd. Halol. ( Panchamhal, Gujarat)
    Position : QC Supervisor
    Duration : April. – 2005 To Sept. – 2005

    Company : Virat Engg. Pvt. Ltd.
    Position : Production / QC Supervisor
    Duration : Sept. – 1999 To April. – 2005
    Job Responsibilities :
    - To prepare Quality Assurance Plan / Travels for smooth functioning & Better Quality.
    - Inspection of material or product at vendors place.
    - Inspection of incoming materials and preparing Incoming materials inspection report.
    - To prepare the action plan to minimize rejection & rework.

    - In process Inspection at workshop :
    a) To prepare WPS, PQR, WPQ as per ASME code Section – IX requirements.
    b) Identification of material w.r.t Test Certificates and transfer of identity, checking the product markings as per Code & making Material Identification Report.
    c) Check the layout & set up as per drawing and prepare Inspection Report complying with Code requirements.
    d) Check the Back gouging DP test and making LPT Examination Report.
    e) Inspection of formed heads as per code.
    f) Prepare weld map & weld Plan.
    g) Offer Radiography of joints, where needed and Interpretation of Radiographic Film as per ASME Code & prepare Radiographic Examination Reports.
    h) Final Inspection of the product / equipment as per the drawing and making the Final Dimension report.
    i) Witnessing of Hydrostatic Stretch Test & Pneumatic test as per job requirements and fulfilling Code requirement.
    j) Check surface finish including sand blasting grade of finish and DFT.
    - Arrangement of man power.
    - Line up of work.
    - Inspection co-ordination for Products testing with the third party inspection agency like as Lloyds register, IBR , IDMC.
    - Also I have knowledge of different types of test as ........,
    - Tensile, Bend and Impact test.
    - Radiography - Ultrasonic – Magnetic Particle – Dye Penetrate Test.

    Key Skills :
    - Well versed with QA/QC/INSPECTION Activities.
    - Good Problem Solver, Good Communicator.
    - Handled Work load Condition & Man power .

    Computer Education :
    - M.S.Office .
    - Internet

    Comments :
    Good Awareness on International Codes & Standards
    ASME SEC II Part A,B,C,D.,SEC V.,SEC VIII DIV I.,SEC IX.
    ASME B31.3,B31.1,B16.11,B 16.9
    API 670, API 650, CNG Cylinders Standards ISO 11439, NZS 5454, EN 1964, ISO 9809.

    Place :

    [Jignesh Panchal]

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    my resume

    CURRICULUM VITAE :
    VAIBHAV B. DESHMUKH
    Email:vbd1989 AT gmail.com

    PERSONAL INFORMATION :
    Date Of Birth : 28-Mar-1989
    Marital status : Single
    Sex : Male
    Nationality : Indian
    Languages know : English,Hindi,Marathi

    EDUCATIONAL DETAIL :
    Course Bachelor of Engineering(Pursuing)
    Field of study Mechanical Engineering
    Name of college Umrer Collage of Engineeing, Umrer
    Name of university Rashtrasant Tukdoji Maharaj Nagpur University

    CAREER OBJECTIVE :
    Intent to build a carrier with leading corporate of high-tech environment with committed & dedicated people,which will help me to explore myself fully & realize my potential & willing to work as a key player in challenging & creative environment.

    ACADEMIC QUALIFICATION :
    Course Year of passing University/Board Percentage (%) :
    B.E I Yr S-2012 R.T.M.N.U 60.43%
    HSC S-2008 Amravati 74.83%
    SSC S-2006 Amravati 66.80%