E.P.C. Global India : Saudi Arabia : Construction Engineer

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    E.P.C. Global India : Saudi Arabia : Construction Engineer

    E.P.C. Global India Pvt Ltd
    EPC Global India Pvt Ltd : EPCGlobal
    http://www.epcglobal.com



    Company Profile
    EPCglobal is a specialist staffing solutions company operating exclusively in the Engineering and Construction Industries.We now have 8 offices servicing varying elements of the engineering community.


    Experience:
    10 - 17 Years
    Location:
    Saudi Arabia

    Education:
    UG - B.Tech/B.E. - Civil


    PG - M.Tech - Civil

    Industry Type:
    Oil and Gas/ Power/Infrastructure/Energy

    Functional Area:
    Site Engg., Project Management

    Posted Date:
    13 Aug



    Job Description
    Business Unit: Chemical & Industrial
    Job Location: Dhahran, Saudi Arabia
    Career Level: Management (Director of Staff)
    Employment Status: Contract (3 years)
    Gender: Male

    Desired Candidate Profile
    Has experience in the oil and/or gas industry or similar process industry and has construction engineering experience on large projects.
    Plans, coordinates, and directs the construction work and construction subcontractor

    Executive Name:
    Jatinder Pal Singh


    Address:
    Not Mentioned

    Telephone:
    +919971991843



    Keywords: Oil & Gas, Construction Engineer

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Mr. Stuart Ritchie

    NAME : Stuart Surtees RITCHIE
    E-mail : stu_projectcntrl AT yahoo.com.sg / stu_ritchie1943 AT yahoo.com
    QUALIFICATIONS City&Guilds :Mech E Craft Practice, Portsmouth Tech College, 1964
    Mech Eng Technicians Part 1, South Dorset Technical College, 1965
    Member of Association of Project Managers (past).
    CAREER SUMMARY Over thirty years experience in Project Controls in positions of responsibility ranging from Field Scheduling and Cost Control to Company Chief Planning Engineer and Project Controls Manager.
    Assigned Projects Included :
    Power Plants, Refineries, NGL Plants, Airport, On Shore Pipelines, NGL Tank Farm, Process & Power Plant revamps and New Development projects.
    FIELD OF EXPERIENCE Particular aspects of experience include :
    Proposals Planning.
    Preparation of critical path networks.
    Preparation of construction cost and planning procedures.
    Cash flow forecasts.
    Cost/manhour and progress reporting.
    Subcontractor Bid evaluations.
    Contractor claims evaluation and contract claims preparation.
    Supervision of Construction Subcontractors.
    Field management of planning and progressing.
    Field management of expediting.
    Project performance audits.
    Executive reporting.
    Client liaison and Clients representative.
    Project Controls Staff Training.
    Software : Primavera / Open Plan / MS Project / Excel
    SKSWOOD
    Brunei – Senior Integration Planner. Overseeing the EP&C Scheduling effort for the Maintenance and Revamp of Offshore Gas and Oil Production Platforms, together with new Water Injection Facilities. (March 2011–current)
    Technip Malaysia
    Turkmenistan – Senior Lead Planner for Construction and Commissioning - Onshore Gas Terminal. Duties involved overseeing Contractors Scheduling efforts, setting up and progress updating of Systems schedule for completion of construction and commissioning.
    Close monitoring of Contractors progress and applied resources.
    Evaluation of Contractors claims. (May 2010–March 2011)
    Initec Plantas Industriales
    Madrid – Corporate Senior Planner. Abu Dhabi Oil Fields Development Planning Lead. Reporting to Proj Cntrls Director. (Feb 2010-May 2010)
    Shaw Stone & Webster
    KSA – Senior Planner on completion of Ethylene Project at Jubail.
    Reporting to Planning Manager. Responsible for Construction Completion, Precommissioning and Commissioning Scheduling
    and Progress Reporting (November 2008 to January 2010)
    Vietnam – Project Controls Manager on Grass Roots Refinery Project, reporting to Project Director. Responsible for overseeing Contractors EPC & Commissioning scheduling and progress reporting; compliance of Contractor Scheduling with the Contract and technical competency of the Schedule. (August 2007 to October 2008)
    Jacobs Engineering Singapore
    Planning and Scheduling Manager, reporting to Managing Director.
    Overseeing all Company Scheduling Staff and the scheduling effort.
    (June 2007 to August 2007.
    Foster Wheeler Asia Pacific Singapore – Lead Planner on Refinery Modifications Project, reporting to Project Manager. Responsible for EPC, Commissioning & Shutdown scheduling and progress reporting. (September 2006 to June 2007)
    WorleyParsons IRAQ – Senior Planner in Kirkuk on Iraq Oil Sector Reconstruction, responsible for the EPC&C scheduling of Multi Projects, On Shore and Off Shore, including Shutdowns. (February 2005 to August 2006)
    Foster Wheeler Energy Ltd.
    IRAQ – Lead Planner assigned to Coalition Provisional Authority, Oil Sector, based in Baghdad IZ. (June 2004 to February 2005)
    CHINA – Senior Planner in Sinopech Beijing Office for close out of E&P phase of the Nanhai Petrochemicals Complex in Southern China. Assisting major contractors in the setting up of their EP&C schedules and for Sinopech’s detail E&P scheduling of the Tank Farm. (73 Tanks and Spheres, including associated pipe racks, piping and equipment). (August 2003 to June 2004)
    UK : – Senior Planning Engineer, BP Coryton, Clean Fuels Project for shutdown planning and progress control for tying new construction into existing plant. (May 2003 to July 2003)
    IRAN : - Lead Planner, BPC Aromatics Project in South Pars Economic Zone on Const’n Management Contract (September 2002 to May 2003)
    Technip
    UAE : Senior Planning Engineer, in Abu Dhabi Office, for Proposals Planning for Petro Chem Industry. Later assignment to GASCO Ruwais, for Construction and Shutdown Planning on Gas Plant Upgrade Project.
    May 2002 assigned as Planning & Progress Control Manager, for Saudi Aramco SRU Project for Riyadh Refinery, reporting to Project Manager.
    Contract duration : December 2000 to September 2002.
    Maltex Trading
    UAE : Short term Consultancy contract based in Dubai, on Extension of Time Claims for Civil Contractors. (October 2000 to December 2000)
    Aseel Const. Systems
    UAE : Short term contract in Dubai Head Office, reporting to the Deputy MD in the setting up of Project Controls Dept. inc recruitment and training of staff in Planning, Progressing,Cost Control & Expediting
    Contract duration : May 2000 to October 2000.
    Siemens Westinghouse Power Corporation
    USA : Short term contract in Orlando Office responsible for Proposal Scheduling and Estimating for Generator Refurb, Procurement and Construction, reporting to Proposals Manager.
    Contract duration : April 2000 to May 2000.
    Bechtel
    Principal Project Controls Engineer, for EPC/Comms & Start-Up Contracts, inc. Proposals Scheduling (August 1991 to March 2000)
    UK : Coryton Energy Project.
    Short term assignment on the construction of an 800MW Dual Fired Combined Cycle Power Plant. (December 1999 – March 2000)
    UAE : Dept. of Civil Aviation, Dubai Airport Expansion
    Project Planning Engineer responsible for overall Project Scheduling and interfacing. Contractors compliance to the Contract and evaluation of Ccontractor claims. (May 1997 – Nov 1999)
    ALGERIA : Sonatrach Gas Liquefaction Plant.
    Comms & Start up Planner on the Arzew GL-1Z Renovation Project. 6 LNG Process Tains and Utilities. (April 1996 - May 1997)
    KSA : SWCC Shoiba Phase 2 Power Plant, Jeddah.
    Planning Supervisor, Scope - five 116MW Oil Fired Boilers and Ancillaries. Client cash flow problems put Project on hold in Apr 96
    Assignment duration : January 1996 - April 1996.
    KSA : SABIC PTA & Aromatics Plant, Yanbu.
    Assigned as the Lead Planner, responsible for EP&C scheduling of PTA and Aromatics Plant, based in the London Office Assignment duration : January 1995 - January 1996
    UK : British Gas, Easington.
    Responsible to Project Manager for establishment of EPC schedules for the Olympus Development, Onshore Terminal facilities.
    Assignment duration : October 1994 - December 1994
    Russia : Achinsk Refinery, Siberia.
    EP&C scheduling for Refinery Completion and Upgrade Project. Construction/Commissioning Scheduling at site & detail Eng at OMSK Design Institute. (November 1993 - September 1994)
    UK: Gulf Oil Refinery, South Wales.
    EP&C Planning for new Isomerisation Project.Dec 91-Nov 93
    Greece: Consolidated Const’n Co Athens.ssigned by Bechtel to CCC, a Joint Venture Co. on proposals planning for Saudi Arabian Oilfield Development Project.
    Assignment duration: August 1991 – November 1991
    Previous FOSTER WHEELER and OTHER WORK HISTORY
    Foster Wheeler Energy Ltd
    UAE: Senior Planner ADNOC Abu Dhabi as Clients Rep for planning and progressing of Sulphur Handling Projects at Ruwais and Das Island. Assignment duration: 1991 - 3 Months
    UK: Esso Fawley, planning and overseeing the mechanical contractor in completion of the Residfiner Project. (1991 - 5 Months)
    Belgium: ESSO, on Fast Track Refinery Expansion Project in Antwerp, (1990 - 10 Months)
    UK: Assignment to BP, Wareham Oilfield Development for cost and planning activities related to the Engineering of two Production Well Heads in Dorset. (1989 - 6 Months)
    Snamprogetti Ltd
    UK: Senior Planning Engineer assigned to Enichem Elastomers Ltd, Hythe, Southampton On Chemical Plant (1989 - 6 Months)
    Foster Wheeler Energy Ltd
    UK: BP Petroleum Development Ltd - Cost / Planning Engineer on Wytch Farm to Southampton Pipeline. (1987 – 1988)
    Foster Wheeler Power Products Ltd
    UK: Chief Planning Engineer responsible to Manager of Management Services for planning related activities in the Company, both at Head Office and Sites (1984 – 1987)
    Kellogg Construction
    UAE: Senior Planner on Abu Dhabi National Oil Co., Das Island LNG/LPG Storage System Project. (1983 – 1984)
    Foster Wheeler World Services
    UK: Senior Planer on Petrokemya Task Force for the Petrochem II Project, Jubail, KSA, (1981 – 1982)
    Venezuela: Assigned as Chief Planner to Corpoven Refinery Expansion Project at El Palito. (1979-1981)
    KSA: Aramco, Shedgum NGL Plant – Lead Construction Planner, / Field Scheduling Manager, (1976 – 1979)
    Clark Chapman/John Thompson Ltd (NEI), Gateshead
    UK: Senior Planner Ince "B" Power Station Project, scope: 2 x 500 MW Boilers/Associated Pipework/Tank Farm/Turbine Hall overhead cranes/Structural Steel. (1972 – 1976)
    International Combustion Ltd (NEI)
    UK: Planning Engineer on site construction and commissioning of 500 MW Boilers and associated equipment for the CEGB at various UK locations inc co-ordination of subcontractors. (1969 – 1972)
    Foster Wheeler John Brown Ltd
    UK: Junior Planning Engineer on site construction and commissioning of 500 MW Boilers & associated Plant for the CEGB. (1967 – 1969)
    Shaw Savill and Albion (Merchant Shipers) Junior Engineer Officer responsible for Boiler Room operation and Mechanical Maintenance on 10,000 ton Steam Turbine ship. (1966 - 9 Months)
    Admiralty and Ministry of Public Building and Works
    UK: Engine Fitter/Turner Apprentice five year indentured apprenticeship, with Admiralty at HM Dockyard Portsmouth, involving extensive training in theory and practice of all aspects of Machine Shop, Factory & Dockyard Infrastructure works.
    Also Royal Naval Vessels overhaul and refitting works.
    Final two years on all aspects of new construction, repair and maintenance of Government Shore Establishments, including six months Drawing Office training. (1961 – 1966)

    This is certify that Stuart Ritchie worked within the Turkmenistan Block 1 Development Project from January 2010 until present as the Senior Planner and Scheduler.
    I was the Senior Construction Manager on the Turkmenistan On Shore Gas Plant and have been exposed to Stuart’s talents on this Project.
    I have relied on his scheduling experience which has proved useful in our program reporting. His responsibilities include setting up projects in P3 for both Contractor and Client use and providing a brief summary of the schedule status for the Monthly Report.
    Conducting weekly status and planning meetings with the Contractor and reviewing contents to generate meaningful schedules from whatever information is available. Stuart is conscientious in his approach and able to effectively lead his Project Controls Staff.
    I would have no hesitation in recommending him for future projects where Petronas Carigali Sdn Bhd re involved or with any other organization that requires his service.
    Stuart would be a valued asset on any Project

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Stuart Ritchie

    Mr. Stuart Ritchie, can you send your CV to us we have an immediate requirement
    email : recruitmrnt.innovative AT yahoo.com