-
February 26th, 2011, 03:45 PM
Post Count Number #1
Multilink Management Consultants : Mumbai
Company Name : Multilink Management Consultants
Company Location : Mumbai
Company Profile :
Keeping pace with growth, both in technology and business, in 1992 M/s ‘Multilink Management Consultants’ was incepted, to cater to the growing and revolutionary changes effecting the Global markets. Today, at ‘Multilink’, we feel satisfied to offer our diverse clients, specialized and quality service, in any area of Manpower recruitment, and deployment of multitrade and qualified workforce.
Services Offered :
We, “Multilink Management Consultants”, are a leading manpower placement agency operating out of India for the last 20 years. Having catered effectively to a wide spectrum of Multinationals right from Europe, USA and the Far East, for their specific operations in the Middle East markets, today we stand proudly tall as one of the leading Manpower Consultancy services in India, capable of providing the best of both skilled and unskilled manpower.
Engineering, Refinery & Petrochemical Construction
Healthcare
Others
Company Address :
Multilink Management Consultants
Union House, Behind Old Post Office,
Mogul Lane, Mahim, Mumbai - 400 016. INDIA
Website : http://www.multilinkindia.com
How to submit CV / resume : http://www.multilinkindia.com/recruitment.asp
Placement Agencies Mumbai, Manpower Consultants Mumbai, Staffing Companies Mumbai
-
June 6th, 2011, 12:09 PM
Post Count Number #2
IJT addict
Name : bhutarget
Email : tawadebhushan0 AT gmail.com
Designation / Skillset : fresher
Resume :
Carrier Objective :
To obtain a challenging career as an Electronics or Software engineer with possible avenues for self – improvement and leadership thereby contributing to the success of the Organization.
Educational Details :
Qualification Year Institute S.G.A/%
Btech 2008-2011 S.G.G.S.I.E.& T.,Nanded 73.58%
Diploma (EXTC) 2005-08 Govt. Polytechnic Sakoli, Dist. Bhandara. 80.4 %
H.S.C 2004-05 M.M.J.C,Gondia Dist.Gondia 63.83 %
S.S.C 2002-03 M.M High school Gondia, Dist.Gondia 72.02 %
Inplant Training :
- Regional Telecom Training Centre, BSNL, Nagpur, Maharashtra.
Seminars Delivered :
- Surface Mounted technology.
Projects :
- Home Automation based on Speech recognition
- Microcontroller based Tele-Remote
- Communication Based Audio Power Amplifier
Technical Skills :
- Simulators :
Matlab( Domain : Speech ), Micro-cap, Microwind, Xilling.
- Software Languages :
C
- Subjetcs :
Micro-processors (8085 and 8086), Micro-controller (8051),ARM7
Achievements :
- 4th Rank in MP-proEX project Exhibition, Sion,Mumbai.(2008).
Declaration :
I do hereby declare that the above mentioned particulars are true to the best of my knowledge and belief.
Place :
Date : Tawade Bhushan T.
-
May 9th, 2013, 01:54 PM
Post Count Number #3
material controller
Mohammad Rizwanul Haque
Email : haque.rizwan038 AT gmail.com
Objective : To excel in Professional life by adhering the policy of hard working & honesty to become an asset for the organization
** B.A (Hon’s) from B.R.A Bihar, University, Muzaffarpur in 1996.
** Certificate of Training Warehouse Management Programme (SIS) KSA
** Ms – Office, ERP JD Edwards
** Familiar with Internet & Email
SUMMARY :
** Father’s Name :Mohammad Nezamul Haque
** Date of Birth :10 th January 1976
** Nationality :Indian
** Sex :Male
** Marital Status :Married
** Language Known :English, Hindi, Urdu & Arabic
WORK EXPERIENCE :
** Company : TARGET ENGINEERING CONST. CO L.L.C Abud Dhabi - UAE
Position : Material Controller.
Duration : 15 June 2010 to till date.
Project : Sea Water Intake Phase III
Client : TAKREER ( PMC/TR Engineering)
** Company : M.S AL Suwaidi Industrial Service KSA
Position : Material Controller
Duration : 21.09.2006 to 20.09.2008
Project : Petro Rabigh Development Proj.(PC1/PC3)
Client : Sumitomo Chemicals Engg. Co./ Saudi Aramco
** Company : Success Fabricator & Erectors
Position : Store Keeper
Duration : 10.05.2005 to 12.03.2006
Project : B.P.C.L, Mahul Mumbai
Client : Petron Engg. & Const. Ltd.
** Company : L.G. Engg.& Const.Corp. Kuwait
Position : Store Keeper
Duration : 01.08.2004 to 19.09.2004
Project : Mina Abdullah Refinery (Shut Down)
Client : L.G. Engg. & K.N.P.C.
** Company : Olyan Descon Industries Co. KSA
Position : Store Keeper
Duration : 11.03.2003 to 15.03.2004
Project : Sipchem ( Jubail)
Client : Chiyada Blue Star / Sabic.
** Company : Medgulf Const. Co. W.L.L Doha Qatar
Position : Store Keeper
Duration : 13.06.2001 to 05.06.2002
Project : 30” Kuff Gas Pipeline Replacement Project.
Client : Samsung / Q.G.P.C
** Company : Daynite Engg. Const. Co.
Position : Store Keeper
Duration : 01.06.1998 to 10.04.2001
Project : I.P.C.L.Extension Project, Baroda
Client : Petron Engg. & Const. Ltd.
** Receiving, Inspection, Storing & Issuing of Various types of Projects Material in material control section.
** To control the movement of material in warehouse, lay down areas and other storage areas at central store.
** Carry out initial checks on all incoming deliveries according to purchase order (PO), supplies agreement, material requisition (MR) invoice, Delivery note to determine quantity and conformity.
** Ensuring safe unloading, and placement according to manufacturer’s guidelines & company safety procedures in assigned storage location.
** Check MTC for technical deliveries.
** Issue a copy the material slip (MRS) along request for inspection (RFI) P.O. to the QC inspector to request the inspection of the items received.
** Prepare over, short and damage report (if any) upon receipt and inform to immediate superior for proper action.
** Material issued through material issue Note, Material Transfer Note and Personal cardex.
** Updates the posting of material withdrawals in bin card & as well as in ERP environment using JD Edwards.
** Check inventory and the condition of stored item at regular interval to determine closing inventory.
** Implement the first in first our policy on all stock.
** Conduct physical check-up on tools & Equipment with individual item code tagging in order to monitor maintenance check-up-History.
** Make periodic report on damaged and defective tools & equipment.
** Determines and category wise all material / Equipment per type of storage condition needed, the anticipated length storage period, needed protection against the elements, size & quality of the items.
** Materials must not store directly to ground.
** Make sure to have an adequate rack, pallets, etc EOR warehouse storage of material / Equipment with sufficient alleyways for easy access.
** Material should segregate per their SPES, size & type with suitable spacers between each layer to facilitate safe handling and avoid damage.
** Chemicals, thinner, paints, flammable material should be stored separately in a no smoking location and clearly mark “INFLAMMABLE PRODUCT / MATERIAL” proper ventilation & Fire Fighting Equipment must be there.
** Issuance of material shall be as per material issue request (MIR) sign by project engineer.
** The store keeper / Material coordinator must also aware of the duly Authorized signatory personal for reference, implement Mir’s no issue.
** All material withdrawal should have withdrawal slip or material transfer note signed site engineer / Forman using material transfer note on issuance to have basis and monitoring on out going items & borrowed items should have transfer slip or personal cardex signed by borrows itself.
** Make the appropriate proper protection for project materials to ensure the safety of materials delivery to site.
** Generates monthly or even weekly actual physical inventories of consumable for monitoring purpose.
** Use stock card to monitor inventory level. Accurate posting must be similar with actual count.
** Monthly actual physical inventory level. Accurate posting must be similar with actual count.
** Inventory surplus material available at store should be turn over to main store to be circulated to till project for them to be aware of available materials.
** Ensure monthly submission of consumption and inventory report (consumable project material) as per store standard template
** (list of material issue request) PPM, consumable, reconciliation report (running & Fix Ed Assets), Monthly inventory report, material, consumption monitoring report.
** Do not leave your Store Unattended, selling any thing our store is strictly prohibited as per company procedure.
** Ensure recording movement of all tools, transfer, intake & Always work with understanding & teamwork.
** inventory.
** Damage or lost report should be immediately secure upon receiving of any damage Running / Fix assets material.
** Attach scrap signed by the person who lost, damage reports, countered signed by the project engineer, project manager & keep for future reference.
** Accomplish total company loyalty & executing company orders the exact attitude.
** Do proper documentation stock transfer all required paper are consolidated in all running / fix asset issued and received.
** Ensure all warehouses / store space inside & out is maintained in clean & ordinary condition.
** Ensure that all words is carried out in accordance with safety & health guidelines.
** Ensure & practice effecting warehousing polices. Implement best practice techniques to improve stock turn over & control.
** Maintain proper hygiene & cleanliness of the store by following approved company procedure.
** Never purchase or as a purchaser if not authorized by your superior,
** Never transfer with supplier. vendor if you are not authorized by your superior
** Al ways do necessary reconciliation & co-operate with main store east / west regarding material maters.
** Do accurate inventory posting as per your site store available stocks
Hope you will consider my resume and give me a chance to your company.
Sir, I assure you for my best services & co-operation at all time.
Date : …………..
Place : …………….
Mohammad Rizwanul Haque