January 20th, 2011, 11:56 AM
Post Count Number #1
Dhruv Corporate HR Solutions Pvt Ltd : Ahmedabad
Company Name : Dhruv Corporate HR Solutions Pvt Ltd
Company Location : Ahmedabad
Company Profile :
Dhruv Corporate (HR) Solutions Pvt. Ltd. (DCS) is a professionally managed company, specializing in all types of recruitments, and has successfully completed several hundreds of national recruitment assignments with eminent business houses and organizations, not to mention the numerous effective international placements.DCS was established by Mr. Chetan Parikh in September 1999 with a commitment to partner corporates in their growth by providing total recruitment solutions. Mr. Chetan Parikh is an engineer by profession with vast national as well as international experience in the field of technology.
Services Offered :
Executive Search
Recruitment & Selection
RPO
Assessment Center
Company Address :
Dhruv Corporate (HR) Solutions Pvt. Ltd.
5/A-1 , 5th Floor, Arjun Tower,
Besides Chiripal House,
Shivranjani Cross Roads, Satellite,
Ahmedabad 380015. INDIA.
Website : www.dcspl.com
How to submit CV / resume : cp@dcspl.com
Placement Agencies Ahmedabad, Manpower Consultants Ahmedabad, Staffing Companies Ahmedabad
June 9th, 2011, 11:17 AM
Post Count Number #2
IJT addict
Name : v.vairamuthu
Email : vaira_muthu2001 AT yahoo.com
Designation / Skillset : QA/QC INSPECTOR(WELDING/PIPING)
Dear Sir,
I am Diploma in Mechanical Engineering, certified cswip3.1 inspecter by TWI- UK And ASNT level-II. From reliable sources, I came to know that you have openings for welding inspector. I am sending you, my updated resume for your kind consideration I have more than 7 years experience in welding inspection field. I have got an experience in Various fields (oil and gas,shipyard project and various
EPC project) at various place (U.A.E,INDIA,SINGAPORE) Eagerly waiting your positive reply . I hope that you are considering my request.
Thanks and best regards.
V.Vaira Muthu
Diploma In Mechnical Engineering
Resume :
Technical Qualification : CSWIP 3.1 WELDING INSPECTOR
(Expiry 18 june-2015Certificate no :48019)
: ASNT LEVEL II in PT
ASNT LEVEL II in MT
ASNT LEVEL II in UT
ASNT LEVEL II in RT
COMPUTER KNOWLEDGES : MS Office, E-Mail & Internet System
OBJECTIVES :
To Work with dynamic and creative organization where I could share my skills and capabilities in challenging position of responsibility that would stimulate and give me an opportunity to work in your esteemed organization.
WORK EXPERIENCE : 7 Years
DETAILS OF WORK EXPERIENCE :
A) worked as a QA/QC inspector(welding) with M/s EPC-L.L.C – UAE since march- 2009 to 2011.
Projects : 1. Pipe Spools Fabrication for Lower Fars Pilot Project (Siwa Petroleum UAE)
2. Pipe Spools Fabrication and Erection for Deep Producer ,Fso Africa,Fso Asia,It is
conversion Ship project (Dubai Dry-docks World)
3.pipe spools Fabrication and Erection for polarcus ship,it is New Building
project(Dubai Dry Docks World
4 . Structural Fabrication for Kauther Gas Project
5. Pipe-rack structures for FPSO Vitoria.
6. Fabrication of rig Panel
7. Fabrication of cement plant Items (Pre-heater, Raw mill, Cyclone, Ducts.
& dampers .etc...)
Clients : 1. Galfar (Oman) / Petrofac / PDO
2. Saipem /DNV/GL/ Dubai Dry Docks
3. QGM Group / ABS
4. Gulf Cement Company Ras-al-Khaimah UAE
Responsibilities :
a. Qualification of welders as per AWS D1.1 & ASME SEC IX
b. WPS and PQR establishment as per ASME SEC IX.AWSD1.1.
c. Witnessing mechanical testing of test coupons.
d. Review material Test Certificates and welding consumable Batch Certificates.
e. Perform stage inspection per approved Inspection & Test Plans.
f. Monitor welding parameters per approved WPS.
g. Monitor welders’ performance.
h. Review of radiographs.
i. Maintain the documents as per ISO 9001-2000
j. Coordinate with Document Controller to prepare Final Dossier.
k. Piping fabrication and assembly as per Asme B31.3
l. Study of drawings, material inspection, electrodes storage monitoring.
m. Dimensions inspection after prefabrication (plate squaring, beveling, rolling)
n. Visual Inspection and Reporting of Piping Weld
o. Inspection of Installation Equipment as per P&ID
p. Monitoring of Material Traceability
q. Mechanical and NDT clearance prior to hydro testing
r. Review and Witness of Hydro Testing for the Pipe Spool,Re –instatement carried out for the test packs as per client requirements.
s. Coordination of site quality inspection with client.
t. Knowledge of executing all NDT activities(RT/UT/PT/MPI)
u. Follow up with third party inspection agency for all the NDT activities.
B) Worked as a Inspection Inpector M/s Airfoil Technologies International Singapore private Ltd – singapore from jan-2008 to dec-2008
Project :Airfoil blade repair.
Client : GE,Singapore air lines,indian air lines,jet air ways.
Duration : jan-2008 to dec - 2008
Responsibilities :
a. Study of drawings, material inspection
b. Final Welding Inspection of impeller blade.
c. Knowledge of Executing all NDT avtivities(RT/PT).
C) Worked as Inspection Inspector With M/s. Nest ndt services private Ltd- Chennai
– India from April-2006 to jan -2008.
Project : Napattinam to Narimannam pipeline project ...
Client :Indian oil corporation Ltd
Duration : April-2006 to Jan- 2008
Responsibilities :
a. Study of drawings, material inspection and monitoring.
b. Dimensions inspection after prefabrication (plate squaring, beveling, rolling).
c. Fit up inspection as per drawing.
d. Monitoring welders and welding parameters before, during and after welding.
e. Alignment inspection after welding.
v. Maintenance of records for all stage inspection.
w. Review and Witness of Hydro Testing for the Pipe Spool,Re –instatement carried out for the test packs as per client requirements.
D) Worked as a Inspection Engineer M/s nest ndt services private Ltd – India from may2004 to April-2006
Project : Cross country pipeline project (Chennai to Madurai)
Client :Indian oil corporation Ltd
Duration : May-2004to march- 2006
Responsibilities:
a. WPS and PQR establishment as per ASME SEC IX.
b. Welder performance qualification as per ASME SEC IX.
c. Study of drawings, material inspection, electrodes storage monitoring. .
d. Dimensions inspection after prefabrication (plate squaring, beveling, rolling).
e. Fit up inspection as per drawing.
f. Monitoring welders and welding parameters before, during and after welding.
g. Alignment inspection after welding.
h. Visual inspection, LPT inspection and radiographic films interpretation.
i. Mechanical and NDT clearance prior to hydro testing.
j. Maintenance of Records for all stage inspection
I certify that all the information above is correct and factual.
vairamuthu.V
Applicant
-------------------------------------------------------
More Information about this submission and submitter:-
___________________________________________________
Submission ID : 4209652
Date & Time : 4th Jun 2011 4:42 AM (UTC)
IP Address : 27.57.245.171
Browser Info : Mozilla/4.0 (compatible; MSIE 8.0; Windows NT 6.1; WOW64; Trident/4.0; SLCC2; .NET CLR 2.0.50727; .NET CLR 3.5.30729; .NET CLR 3.0.30729; HPNTDF; BRI/1; .NET4.0C; BRI/2)
Predicted Country : --