Welders, Fitters, Fabricators, Electricians Mumbai : M & S Corporation

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Freelancer
    Join Date
    August 18th, 2010
    Location
    India
    Posts
    16,237

    Welders, Fitters, Fabricators, Electricians Mumbai : M & S Corporation

    M & S CORPORATION MAZGAON, MUMBAI : WELDERS / FITTERS / FABRICATORS / ELECTRICIANS

    Company Name : M & S CORPORATION
    Company Location : MAZGAON, MUMBAI
    Designation (of vacancy) : WELDERS / FITTERS / FABRICATORS / ELECTRICIANS
    Company E-mail ID : AKCOVERSEAS@GMAIL.COM
    Company Website : WWW.AKCOVERSEAS.BLOGSPOT.COM

    Job Description, Candidate Profile, Company Profile, Company Address :
    URGENTLY REQUIRED FOR CCC-UAE FOR THEIR PIPELINE & PIPING PROJECT

    01 FOREMAN EQUIPMENT
    02 FOREMAN HYDROTEST
    03 FOREMAN WELDING
    04 SUPERVISOR RIGGING
    05 MANAGER PRECOM – COMM
    06 ENGINEER PRECOM – COMM
    07 SUPERVISOR PRECOM – COMM
    08 FOREMAN PRECOM – COMM
    09 SECTION ENGINEER STEEL STRUCTURAL ERECTION
    10 SITE ENGINEER STEEL STRUCTURAL ERECTION
    11 SITE ENGINEER EQUIPMENT ERECTION
    12 FABRICATION ENGINEER
    13 SITE ENGINEER MECHANICAL
    14 SUPERVISOR MECHANICAL
    15 FOREMAN MECHANICAL
    16 ENGINEER PIPELINE
    17 ENGINEER HYDROTEST PIPELINE
    18 SUPERVISOR HYDROTEST
    19 QC INSPECTOR PAINTING
    20 QC INSPECTOR ELECTRICAL & INSTRUMENT
    21 QC INSPECTOR MATERIALS
    22 QC INSPECTOR PIPING
    23 QC INSPECTOR INSTRUMENT
    24 QC INSPECTOR WELDING
    25 QC INSPECTOR STEEL STRUCTURAL
    26 QC INSPECTOR EQUIPMENTS
    27 QC ENGINEER MECHANICAL
    28 QC ENGINEER NDT
    29 QC ENGINEER ELECTRICAL & INSTRUMENT
    30 QUALITY ASSURANCE ENGINEER
    31 NDT CO-ORDINATOR
    32 TALISMAN OPERATOR
    33 FOREMAN PWHT
    34 SURVEYOR MECHANICAL
    35 G / F PIPING
    36 SUPERVISOR PIPING
    37 SUPERINTENDENT PIPING
    38 G / F WEDING
    39 G / F STEEL STRUCTURAL ERECTION
    40 SUPERVISOR STRUCTURAL
    41 SUPERINTENDENT HYDROTEST PIPELINE
    42 SUPERVISOR / G/F ERECTION
    43 SUPERVISOR FABRICATION
    44 FOREMAN FABRICATION
    45 SUPERVISOR WELDING
    46 SUPERVISOR RIGGING
    47 SUPERVISOR EQUIPMENTS
    48 SUPERVISOR MILLWRIGHT
    49 FOREMAN MILLWRIGHT (JP)
    50 SITE ENGINEER EQUIPMENT
    51 SITE ENGINEER PIPING
    52 FOREMAN PIPING
    53 FOREMAN STEEL STRUCTURAL ERECTION
    54 FOREMAN RIGGING
    55 FOREMAN SCAFFOLDING
    56 FOREMAN BENDING
    57 FOREMAN STRINGING
    58 FOREMAN LOWERING
    59 FOREMAN TIE IN
    60 FOREMAN PAINTING
    61 FOREMAN COATING
    62 SENIOR QUANTITY SURVEYOR E & I
    63 SECTION ENGINEER E & I
    64 ENGINEER E & I
    65 ENGINEER INSTRUMENT
    66 SUPERVISOR E & I
    67 FOREMAN E & I
    68 FOREMAN INSTRUMENT

    ALL DOCUMENTS ALONG WITH PASSPORT TO BE SUBMITTED 2 DAYS BEFORE THE DATE OF INTERVIEW.
    CANDIDATES MUST HAVE EXPERIENCE IN THEIR RESPECTIVE FIELDS
    CLIENT INTERVIEW IN MUMBAI ON 10TH & 11TH JANUARY 2011

    Contact Person
    Mr. Kareem Panjwani
    +919920992293
    akcoverseas@gmail.com
    http://akcoverseas.blogspot.com/

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : Dete Apparao
    Email : appadete AT gmail.com
    Designation / Skillset : qa engineer
    ISO-9001 :2008, NDT RT-II, std ASMT, ANSi, ASME

    Resume :
    CAREER OBJECTIVE
    To work in global competitive environment on the challenging assignment that shall yield the benefits of the job satisfaction & steady-paced professional growth.
    EXPERIENCE DETAILS
    Total experience :-4 + years experience.
    PRESENT EXPERIANCE :-
    Metaltek Techno project I Pvt.Ltd 1.03.2010 to till date as a Production & QA Incharge.
    Metaltek is ERP based ISO 9001-2008 certified company, which manufactures, Mechanical Seals Supporting systems Like API plan 52, 76, 77, 53B, Coolers, Heat exchangers, Pressure Vessels, which are mainly used for Petrochemical Refineries .
    MOC : - SS304, SS304L, SS316, SS316L, SS904L, SSDUPLEX, ETC
    PAST EXPERIANCE :-
    Steelfab Engineering Pvt. Ltd. Hadapsar Pune from 3 Sep 2006 to 15rd Feb2010.
    SEPL is ERP based ISO 9001-2008 certified company, which manufactures Loading Arms, Swivel joint, Prover Tanks, Floating suction assembly, Mechanical Seals Supporting systems Like API plan 52, 76, 77, 53B, Coolers, Heat exchangers, Pressure Vessels, which are mainly used for Petrochemical Refineries .
    Job Profile : - Working experience on Production, QA, MR., Internal Auditor, NDT level-II.
    Responsibility & Activity : - (Report to Management)
    Production :-
    1. Entirely responsible for achieving Welding & Fabrication Shop Production targets.
    2. Prepared Monthly and Weekly schedule considering orders in hand, resource requirement & customer delivery dates.
    3. Checked & ensured all Technical inputs like Drawings, QAP, etc and all corrective measures were taken in case of discrepancies.
    4. Provides BOM details to stores and gets availability / shortage of material from stores & co-ordinate with various departments and gathered information on all shortage materials.
    5. Ensured that all production materials were available and communicated to procurement department when needed.
    6. Decide and prepare list of inhouse production items and subcontracted items along with part drawing & right selection of sub- contractors as per purchase procedure and issue of PO copy & material with relevant drawings to the sub- contractor.
    7. Co-ordinate with purchase department to stock material ordering & fabrication
    accessories.
    8. Monitor and control expenses on Inhouse process & subcontracting Items.
    9. Monitoring project progress with the department and training junior staff members.
    10. Organize and attend technical meetings to discuss and give proposals for non constructible design related issues.
    11. Organize technical meetings of Subcontractors to discuss Drawings, Material, Delivery, Cost and process.
    12. Developing and implementing process methods & its controls to improve cost saving, Delivery & Quality.
    13. Implement production procedure and quality control systems & analyzing production, maintenance and other operational reports, to detect production problems & take Corrective action.
    14. Ensure the availability of machine equipment, tool and utility in perfect condition and look after that the repair work / maintenance attended timely without much loss of down time.
    15. Identify new technological needs of process and implement new technologies for the production to reduce cost and save time & inform to Management.
    16. Acting on constructive feedback given by management staff, other department, customers and
    vendors to improve performance.
    17. Fill up Welding Log book & WPQ.
    Material Handle : - SS304, 304L, 316L, LTCS, SS904L, SSDUPLEX, MS & other.
    Production Documentations :-
    1. All ISO 9001 :2008 Documents.
    2. WPS / PQR/ WOP/ welding log book.
    3. NDT (RT, DP).
    4. Data Analysis (On Timely Delivery & Subcontracting Rating).
    5. JCR, Stage Inspection Reports.
    6. Production Plan Monthly, Weekly & Daily.
    7. Rework Register.
    8. CA/PA & Continual Improvement Points.
    9. Compliant register.
    Material Testing : -
    1. Lab testing Physical, chemical, Micro, Macro as per material STD (Only report Reviewed).
    2. PMI Report reviewed.
    3. Moly Test (Performed).
    NDT Tests :-
    1. RT, DP, Hydro test.
    Technical Qualifications : - RT –II, AUTO CAD, Working on ERP.MR.
    Known STD : - ASTM, ASME-IX, VII, ANSI
    QA :-
    1. Maintain quality management system throughout Organization.
    2. Find out NC & Raise CA/PA.
    3. Training to Personal.
    4. Calibration of all equipment, instruments, gauges and welding machine.
    5. Prepare, update & maintained welder qualification records.
    6. Attain & receive customer complaint & find out root cause & Raise CA/PA
    7. Inward inspection (Raw Material Inspection, Pipes, Flanges, Fittings, Bar, M/C components.etc.)
    8. Reviewed in process inspection.
    9. Final Inspection & documentation of project.
    10. Responsible for follow up to the supplier for raw material TC
    11. Co-ordination with customer job inspection, third party inspection agency. (DNV, BV, EIL, BPCL, HPCL, etc).
    12. Conduct internal audit & MRM.
    13. Welding Inspection.
    14. Review RT Reports & film.
    15. Drawing study & prepare internal QAP.
    16. Data analysis for QA objectives & to raise the corrective action if required.
    17. Fabricated cooling coil inspection.
    Documentations :-
    10. All ISO 9001 :2008 Documents (MRM, Internal Audit, Findings etc).
    11. WPS / PQR/ WOP/ welding log book.
    12. Final Inspection Documents.
    13. MTC.
    14. QAP.
    Design Related :-
    1. Preparation of Drawing & BOM.
    2. Release job card.
    PROFESIONAL QUALIFICATION
    1. BE (MECH) First class with distingstion.
    2. NDT (RT LEVEL-II).
    3. Auto CAD 2004.
    4. Certified Internal Quality Auditor ISO 9001 :2008.
    5. Operating System Windows XP, Windows 2000.
    EDUCATIONAL QULIFICATIONS
    - B.E. (Mechanical) from T.P.C.T’s COE Osmanabad under Dr.BAM University Aurangabad with Aggregate (65%) First class.
    - SSC with 68.64% from Latur Board.
    - HSC with 70.68% from Latur Board.
    Qualification
    Discipline/ Specialization
    School/College
    Board/ University
    Year of passing
    % /
    Grade
    B.E. Mechanical engineering T.P.C.T’s COE Osmanabad Dr.B.A.M.U. Aurangabad
    2006
    69.68%
    T.E. Mechanical engineering T.P.C.T’s COE Osmanabad Dr.B.A.M.U. Aurangabad
    2005
    65.00%
    S.E. Mechanical engineering T.P.C.T’s COE Osmanabad Dr.B.A.M.U. Aurangabad
    2004
    64.00%
    F.E. Mechanical engineering T.P.C.T’s COE Osmanabad Dr.B.A.M.U. Aurangabad
    2003
    61.00%
    H.S.C. Science Z.P.HighSchool Osmanabad Latur Board
    2002
    70.68%
    S.S.C.
    S.S.C.
    L.B.S.V.N.Khed
    Latur Board
    1999
    68.64%


    Date : - Sign.
    Place:- (Dete Apparao)

    -------------------------------------------------------
    More Information about this submission and submitter:-
    ___________________________________________________
    Submission ID : 4445810
    Date & Time : 4th Aug 2011 4:45 PM (UTC)
    IP Address : 14.97.122.79
    Browser Info : Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; SV1; InfoPath.2; .NET CLR 2.0.50727)
    Predicted Country : --