January 4th, 2011, 12:39 PM
Post Count Number #1
TIFAC-CORE DTU Recruitment 2011 www.dce.edu : Scientific, Technical Officer
Recruitment notice in TIFAC-CORE at DTU
TIFAC-Centre Of Relevance and Excellence (CORE)
in
Fiber Optics and Optical Communication
Delhi Technological University, Bawana Road, Delhi-110042, India
Applications are invited for following purely temporary positions for a year (likely to continue for one more year) to manage the activities of the above mentioned advanced cente
Name of the Organization :Delhi Technological University
Company Address: :
Fiber Optics and Optical Communication
Delhi Technological University, Bawana Road, Delhi-110042, India
Name of the Post: :
Senior Technical Officer – 01
Senior Scientific Officer – 01
Senior Technical Assistant – 02
Lab Assistant - 01
Project Fellow (Under UGC sponsored project) - 01
Age Limit : Below 40 years
How to Apply :
Send filled application form and copies of certificate to
The Chief Coordinator (TIFAC-CORE), Room No.: SBTF-6, Applied Physics Department, Delhi Technological University, Bawana Road, Delhi-110042 or can be emailed to dr_rk_sinha@yahoo.com
Last Date of Application Receipt : latest by January 07, 2011
Detailed Advertisement : http://dce.edu/web/Sections/job_oppurtunities/tifac.php
Interview to be held during : January 17 to January 20, 2011
Company Profile :
"DTU to be a leading World Class Technology University playing its role as a key node in National and Global Knowledge Network thus empowering India with the Wings of Knowledge and Power of Innovations."
May 27th, 2011, 12:06 PM
Post Count Number #2
IJT addict
Name : Ajaykumar.vemuri
Email : ajaykumar.vemuri AT gmail.com
Designation / Skillset : Electronics and communication Engineer
To
Head -HRD
Sub : Application for suitable post (Instrumentation)
This has referred to your advertisement requirement of power plant professionals. As I am having 9 year 10 month experience in CCPP and Thermal Power Projects detailed Engineering and maintenance, so I would like to forward my curriculum Vitae for favor of your kind perusal and consideration for a suitable post.
I had started my professional Career in REGENCY CERAMICS as a Trainee engineer (Inst) in June 25th 2002 & NBVL power division as an Engineer in April 2006 - Dec 2008 & presently working as Asst Manger from Jan 2011 - Till date in KONASEEMA GAS POWER PLANT. During this period I have been involved in project, Co-ordination and Execution, Commission maintenance and Energy Conservation activities.
I hope my Experience is suitable to your requirements. Therefore I am eagerly waiting for an early call from your end at the earliest.
Thanking you sir,
With Kind regards,
(V. Ajay Kumar)
Encl : Curriculum Vitae
Resume :
CURRICULUM VIATE
CAREER OBJECTIVE :
- To work with a reputed firm in a challenging position which will utilize my skills in a better way and offer excellent opportunities for my professional and personal development.
PROFESSIONAL COMPENDIUM :
- Started my industrial career in M/s. REGENCY CERAMICS PVT LTD, YANAM. From JUNE 2002 to March 2006, joined in this organization as a DET and graded to senior supervisor.
- Worked in M/s NAVA BHARAT VENTURS LTD, PALVONCHA. Power Division from APRIL 2006 to Dec 2008 as an engineer-C&I in project Department.
- Joined in M/s KONASEEMA GAS POWER Ltd, DEVARAPALLI. Power Division in Jan 2009 as a junior manager, involved in the erection and commissioning of 440MW combined cycle gas power plant. Presently working as Asst manager(C&I) till the date.
EDUCATIONAL QUALIFICATIONS :
- Presently studying B.Tech Third year in Electronics and communication Engineering in Andhra University in CCC (Distance education)
- Diploma in Electronics and Instrumentation Engineering from S.M.V.M polytechnic (TANUKU) A.P.
SOFTWARE EXPOSURE :
- Familiar with MS office, AutoCAD, SAP.
DETAILS OF FUNCTIONAL EXPERIENCE :
A. Project Experience :
1. Involved in the Erection and commissioning of 20MW power plant SNM STG and 100TPH AFBC Boiler with YOKAGAWA DCS (CS-3000 V-Net IP).
2. Involved in the erection and commissioning of 13MW Co-Gen power plant SNM STG and 64TPH Traveling gate Boiler with SCHNEIDER SCADA System.
3. Presently involved in the erection and commissioning of the 420MW combined cycle gas power plant & HRSGs with SIMENS DCS (Teleperm xp)
4. Involved in the erection and commissioning of BOP, CEMS, SAWS, GAS SKID.
a. involved in the detailed engineering of the following systems during the execution of above said projects :
b.
1. All kinds of Field instruments, which come under power plant.
2. Cables.
3. Modification works done During the BREAK DOWN.
c. Activities carried out during the detailed engineering :
1. Layouts preparation.
2. IO list freezing as per P&ID’s
3. Selection of Instruments and Accessories.
4. Freezing Instrument parameters, specifications etc.
5. Cables Estimation.
6. Preparing and forwarding procurement indents.
7. Review and approve drawings.
8. Co-ordinate and follow up the material supplies as per project schedule and site requirement.
9. Witness the performance test of the equipment on test bed.
10. Co-ordinate & Monitoring the erection and commissioning activities.
d. Familiarity in :
1. IO list preparation.
2. Cable Scheduling.
3. PID Blocks Tuning.
4. Selection of Field Instruments as per Requirement.
5. Calibration of pressure & Differential pressure Transmitters.
6. Calibration of power Cylinders, pressure and Temperature Elements.
7. Calibration of Control Valves.
8. Calibration of MOV.
Erection and commissioning of the above said.
B. Maintenance Experience :
a. Well conversant in the maintenance of following equipment :
1. 13 MW Steam Turbo-Generator & 64 TPH Traveling gate Boiler and its auxiliaries.
2. 20 MW Steam Turbo-Generator & 100 TPH AFBC Boiler and its auxiliaries.
3. 32 MW Steam Turbo-Generator & 125 TPH AFBC Boiler and its auxiliaries
4. 2x140 MW GT, 1x160 MW Steam Turbo-Generator & 2x 220 TPH HRSGS and its auxiliaries
5. Field Instruments.
6. Calibration of Pressure and Temperature Elements
b. Carrying activities :
1. Preparing preventive maintenance schedules.
2. Monitoring the spare parts
3. Estimating maintenance cost
4. Monitoring equipments performance.
5. Inspection, cleaning/ replacing necessary parts.
6. Attending emergency and breakdown works.
7. Upgrading the equipment s as per the schedules.
8. Systematic arrangement of tools
9. House keeping.
10. Maintain a standard to systematize and high levels of work management.
I, V. AJAY KUMAR, hereby affirm that the information furnished above is true to the best of my knowledge and belief.
Place: Ravulapalem
Date:
(V. AJAY KUMAR
-------------------------------------------------------
More Information about this submission and submitter:-
___________________________________________________
Submission ID : 4170803
Date & Time : 25th May 2011 5:18 AM (UTC)
IP Address : 117.239.49.193
Browser Info : Mozilla/5.0 (compatible; MSIE 9.0; Windows NT 6.0; Trident/5.0)
Predicted Country : India