Leighton Offshore Malaysia : Occupational Nurse

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Freelancer
    Join Date
    August 18th, 2010
    Location
    India
    Posts
    16,237

    Leighton Offshore Malaysia : Occupational Nurse

    Occupational Nurse
    Malaysia

    * Project Description :Situated in Ipoh, the project is the decommissioning and disposal of the long term storage concrete bunkers built from 1988 – 1992. The project involves the removal of contaminated material from existing reinforced concrete storage bays, the processing of this material and its disposal into engineered cells, the demolition of the reinforced concrete storage bays and their disposal into engineered cells and the monitoring of the designated area.

    * Job summary :The successful candidate will be project based and will be responsible for providing and coordinating on site occupational health, clinical and emergency services and ensuring the coordination with local hospitals, paramedics etc is in place in accordance with the Leighton Safety and Environmental Management System and any statutory regulations.

    * Responsibility :He or she will hold as an absolute minimum a recognized and suitable qualification in Nursing and 2 years experience in a similar site based nursing role, an industrial nursing role or as an emergency room nurse. In addition to this any applicant will be fluent in English and Bahasa Malaysia and possess strong communication and problem solving skills.

    * Job fuction :Safety and Health

    * Reference :MYS-10-M287-00004

    * Closing Date :21 January 2011

    About us :
    Leighton Offshore awarded US$733 million Iraq Crude Oil Export Facility Project to install three single point moorings (SPMs) and 120 kilometres of 48-inch pipelines in the Arabian Gulf, offshore Iraq. Middle East’s largest and most prominent SPM contract, the project marks the first major offshore project for Leighton in the region.Leighton International's offshore division awarded its first African project by the Tanzania Port Authority for the value of USD 66 million.Leighton India wins the Chenani-Nashri tunnel contract to build one of the longest road tunnels in Asia. The project involves the construction of a major road tunnel in Jammu, Northern India, worth approximately USD 500 million.

    Contact us :
    Leighton Offshore
    15/F Menara Multi-Purpose
    No. 8 Jalan Munshi Abdullah
    50100 Kuala Lumpur
    Malaysia
    T : +603 2035 1788
    F : +603 2693 5388
    careers@leightonint.com.
    http://www.leightonint.com

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Name : Atit Anak Sigai
    Email address : atitsigai AT yahoo.com
    Educational background : Form 5
    Position : Mechanic
    Oilfield Related Training / Course
    19 March 2008-20 March 2011
    - Emergency Response Team Miri Srawak.
    30 May 2008-29 May 2011
    - Basic Hydrogen Sulphide Training (H2S)
    28 May 2008-27 May 2011
    - Permit To Work(A).(PTW).
    .
    16 June 2009-15 June 2012
    . 2 Day Combined Sea Survival & Offshore Safety Procedure Helicopter Underwater
    Escape Training With EBS And Basic Fire Fighting & Self Rescue(Refresher)
    05-07 September 2009-06 September 2013

    WORKING EXPERIRNCE / DUTIES RESPONSIBILITY
    - Monitoring, servicing and rebuilds of caterpillar engine model, 3408, 3406 and 3412.
    - Maintaining and servicing Twin Disc Transmission model 8FW 1801-1 and Detroit
    Diesel Engine model 16V-71 and Boom Engine model 12V-71for the American
    Derrick Crane (CLYDE).
    - Maintaining and servicing 4 off 2 Drum Timberland Hydraulic and ZAFFA Zicom Anchor Winches.
    - Maintaining and servicing Compressor model Ingersoll Rand SSR-EP 200/60
    And Pipe Claim model 15T 2 and Quincy Compressor model 390-21.
    - Maintaining, rebuilding and servicing high pressure pump Water Making Facilities (Reversed Osmosis)model Village Marine 30 TPD System (Sea water treatment and reverse Osmosis),Microprocessor Control panel.
    .
    AT PRESENT
    December 2010 –may 2011- OER group (Swiber Singapore) as mechanic
    - DLB Magnificent barge DP2-3000 (Swiber)
    - Jacket & Topside installation(Mumbai High field).
    - B23A Platform,B178A Platform,B179A Platform.
    - Client : ONGC India Mumbai.
    26 June 2010- Joint OER group (Swiber Singapore) as Mechanic
    - DLB Swiber Aziz
    - Pipeline,
    - CUEL & SWIBER joint venture.
    .

    25th February 2009 – Joint Leighton International company(offshore)
    - DLB Leighton Faulkner barge.
    - Onshore pipeline installation in BDEB Project(Brunei)
    April 2005-May 2008- Position as construction mechanic.
    - Joint Petra Resources Sdn Bhd
    - Barge Petra Discovery
    - Project Sarawak water and sabah water
    - Client;: Shell