www.alrehman.in Grinaker LTA South Africa : Piping Foreman, Pipe Fabricator, Pipe Fitter

+ Ask Question / Post resume
Results 1 to 5 of 5
  1. Post Count Number #1
    Freelancer
    Join Date
    August 18th, 2010
    Location
    India
    Posts
    16,237

    www.alrehman.in Grinaker LTA South Africa : Piping Foreman, Pipe Fabricator, Pipe Fitter

    GRINAKER LTA South Africa : Piping Foreman / Pipe Fabricator / Pipe Fitter

    Company Name : GRINAKER LTA
    Company Location : South Africa
    Designation (of vacancy) : Piping Foreman / Pipe Fabricator / Pipe Fitter
    Company E-mail ID : rajapk@alrehman.in
    Company Website : www.alrehman.in

    Job Description, Candidate Profile, Company Profile, Company Address :
    OPENING FOR GRINAKER LTA, South Africa
    • Piping Foreman
    • Pipe Fabricator
    • Pipe Fitter

    6 – 8 Months Short Term Contract!
    Attractive Salary!!!
    Free Food + Accomodation
    Client Interview on 2nd December & 3rd December 2010 at

    CJX Welding Institute
    Binny Road,
    Palluruthy,
    Ernakulam,
    Cochin – 682005.

  2. Post Count Number #2
    On probation
    Join Date
    September 20th, 2011
    Location
    egypt
    Posts
    1

    piping foreman

    Piping supervisor
    Name : Ali Ismail Ali Sarhan.
    E-mail :
    Sarhanali95 AT yahoo.com
    aali_pipe2 AT yahoo.com

    Education :
    Industrial Diploma.

    Skills :
    Mechanical piping supervisor.
    Pipe fabrication supervisor.
    Ability to read and understand all piping drawings, Iso.
    Fabrication sketches Required & P&Ids.
    Good Command of English language.
    Ambitious for learning any new difficult job after training
    Working in life area.
    Ability to read and understand piping Basic engineer

    Computer Skill :
    Windows XP.
    Internet Explorer.
    Microsoft office.
    AutoCAD..

    ** ENPC Project Uhde By Iemsa AS a piping supervisor
    ** ESISCO : Egyptian Sponge Iron and Steel Company (BESHAY group)

    In El Sadat city, Work as a Mechanical piping supervisor Piping department
    ** Aromatics Kuwait by Karafi National as a Supervisor Piping.
    ** Vasilikos power station Cyprus by J&P AVAX as a mechanical piping foreman.
    ** Khursaniyah Producing Facilities Project (KPF) K.S.A by CCC as a site foreman piping.
    ** Egyptian LNG Project IDKO Alex. By Siemens as a mechanical Pipe fitter foreman, seconded to Bechtel Overseas Cooperation Start Up & commissioning team.
    ** WLGP Mellitah Plant Libya by Bonatti co as a piping foreman,
    ** QAFCO_4 Expansion Project Qatar by Consolidated Contractors Co Mesaieed Qatar as a pipe fitter from Oct 2003 up to may 2004.
    ** ELNG new Damietta Gas Plant Egypt by Dodsal Pet Limited as a Pipe Fabricator, from March 2003 up to Oct 2003.
    ** Rashbetco Gas Plant Egypt by Petrojet Co as a pipe Fabrication foreman From Sept 2002 up to March 2003.
    ** East Port Said Power Plant 2x341 MW Egypt by TCHINT Cimi montubi, As a pipe fabricator from Oct 2001 up to Aug 2002.
    ** AMOC Maximization of Gas Oil Project Egypt by TCHINT Cimi Montubi as a pipe fitter, from Feb. 200 up to May 2001.
    ** Oriental Petrochemicals Ean El sokhna Egypt by TCHINT Cimi montubi As a pipe fitter from Sep 1999 up to Feb 2000.
    ** MIDOR Middle East Refinery Project by DAELIM Engineers & Constructors as a pipe fitter from April 1998 up to Sep 1999.
    ** Mahmoudia Power Plant Station by NOVA Cimi montubi as a pipe fitter From Sep 1994 up to May 1995.
    ** Janakles Airport Egypt by DILINGHAM-ABB SUSA as a pipe fitter From Abr 1993 up to Jul 1994.
    ** Ras El soda & Sporting Sewage Pump Stations by PERINI International Corporation as a pipe fitter from March 1985 up to Oct 1986.
    ** Abu Qir Power Plant Egypt by GENERAL ELECTRIC TECHNICAL Service Co. INC as a pipe fitter from March 1983 up to Des 1983.

    Job Duties :
    - Responsible for Erection the In let & out let of the Water Injections, poster pumps, Valve station & Maine headers.
    - Commissioning, Start up, Maintenance, Loading and transfer the ethylene, propane& nitrogen tankers.
    - responsible for all mechanical piping, included to compressors, air coolers, gas turbo generators, vessels, heat exchangers and cryogenic pump.
    - Controls & monitor pipe fitter's performance for pipe fabrication and erection.
    - fabricate, fit up and erect welding pipe (CS, SS, and LTCS) and testing a low & hi pressures system.
    - Responsible for fabrication & erection all pipe for Walking Hearth Furnace 80 t/h, light section mill & water treatment plant
    - Supervisor Piping [Fabrication and Erection of pipe lines in MELT SHOP EAF, LF and pipe rack, CCM (Siemens), light section mill (DANIELI)]
    - Supervising a group of pipe fitters, grinders and welders working in Hydraulic, Oxygen, Gas, Water, INERT gas ,AIR ,AR ,NI and CA pipe lines..(Using mechanical drawings, P&ID and 3Dmodel)
    - Technical office (makes isometrics for workshop, make engineering details, makes modifications to drawings by using AutoCAD program, request material according to drawings. Siemens & DaneiliI standers)
    - Material control and inspection

  3. Post Count Number #3
    Unregistered
    Guest

    - RESUME- :
    Post Applied for : “PIPE FABRICATOR”-
    - RAM KRISHN PAL-

    OBJECTIVE :- To pursue my career with a professionally managed organization where hard- work and dedication will be an asset, and teamwork, efficiency any profits- are the keys.

    - PERSONAL DETAILS :-
    Name : Ram Krishan Pal-
    Father’s Name : Shri Hari Charan Pal
    - Date of Birth : 14/03/1987-
    - Nationality : Indian
    - Sex : Male
    - Marital status : Single
    - Language Known : English, Hindi
    - Permanent Address : Dist: Muzaffarpur - Bihar

    EDUCATONAL QUALIFICATION- :
    Matric- - I.A

    WORK EXPERIENCE- : Worked with Topaz Engg. Ltd. India . As a Pipe Fitter. From 11-04-2005- to 19-06-2006-
    - Worked with Blue Star Engg. Pvt. Ltd. India. As a Pipe Fitter. From- 02-08-2006 to 27-09-2007-
    - Worked with VTA Engg. Pvt. Ltd. India. As a Pipe Fabricator. From- 14-11-2007 to 22-12-2008-
    - Worked with Punjlloyed Ltd. India. AS a Pipe Fitter. From 16-03-2009- to 24-07-2010-
    - Presently working as a Pipe Fabricator with Lamprell HFZE FZC Sharjah –U.A.E from 13-05-2011 to till now.-

  4. Post Count Number #4
    Unregistered
    Guest

    CURRICULAM VITAE

    Name : B NARASINGBHARATHY
    Email : bharathbharathyy AT gmail.com

    OBJECTIVE :
    To nature talent in technical and soft skills, share knowledge and built teams that will develop quality applications and software solutions.

    Personal skills :
    Comprehensive problem solving, good verbal, on-verbal and written communication skills, ability to deal with people diplomatically, willingness to lean, team fascinator.

    EDUCATIONAL QUALIFICATIONS :
    - Board of Secondary Education (HSC), Porayar, Tamil Nadu, India.
    - Certified Welding Inspector Course from American Welding Society (CWI), Singapore.

    ADDITIONAL QUALIFICATIONS :
    - Shipyard Safety Supervisors Course, Singapore.
    - Undergone training for API1104 (Piping), Singapore.
    - Undergone training for Piping Quality & Welding Quality courses conducted by Sembawang Shipyard, Singapore.
    - Undergone training in Microsoft Office Applications.

    WORKING EXPERIENCE :
    - Working as a Piping Supervisor (Project foreman) in Scantech Marine Pte. Ltd. Singapore from January 2007 to 18.08.2011.
    - - Working as a Piping Supervisor (Project foreman) in Roongtat Marine Pte. Ltd. Singapore from January 2012 to still

    Job Description :
    - To execute the job as per requirement.
    - To identify the job location with ship staff and surveyor on board.
    - To coordinate with other sections to carry out in way jobs.
    - To do inspection of fitting and final welding before call for owner’s inspection.
    - To get the job cleared from Q.C.
    - To carry out inspections along with the superintendent / surveyor.
    - To maintain documentation for record.
    - To prepare quotation, work completion form and invoice.
    - Check the welders, whether they are following SMAW & GTAW standard according to the Welding Procedure Specifications (WPS).
    - Make sure the fabricated pipe spools according to the drawings given by the Project Team.
    - Check the pipe fit up as per the piping standards.
    - Check the Root and Runs for Pipe joints, flange joints, elbow (bud, socket) joints up to 12” pipe (both Sch.40 & 80).
    - Check the installed pipes as on drawings and find out the modifications made onboard vessel.
    - Raising Site Queries, using spool drawings given by the Project Team.
    - Make Sketches and get approval from the Project Team and Vessel Owner for onsite fabricated pipe lines
    - Closely monitor the pipe line testing based on the specifications given by the owner of the vessel.

    Worked on the Following projects :
    SAPURA 3000 (Cranevessal)
    ABAN VIII
    ABAN ABRAHAM (Drillship)
    ARV I
    BOREALIS 5000 T (Cranevessal)

    PROJECT DETAILS :
    SAPURA 3000 (Cranevessal) :
    - To Fabricate install & test. Center Colling main line i.w.o water ballast tank.
    - To Fabricate install & test. Bilge system main line & supply i.w.o water ballast tank.
    - To Fabricate install & test. Deck drain line system i.w.o water ballast tank & fuel oil tank.
    - To Fabricate install & test. Sea water main system i.w.o water ballast tank
    - To Fabricate install & test. high pressure line i.w.o over board.
    - To Fabricate install & test. Vent line i.w.o over board
    - To Fabricate install & test. fire lie i.w.o main deck & E/ Room.

    ABAN VIII :
    - To fabricate install & test deck drain line. i.w.o main deck modules & turret.
    - To fabricate install & test new air compressor line i.w.o main deck.
    - To fabricate install & test lube oil line i.w.o main deck pipe rake
    - To fabricate install &test fresh water line i.w.o main deck.

    ABAN ABRAHAM (Drillship) :

    - To fabricate install & test.Bilge system main line & supply i.w.o main deck pipe rake.
    - To fabricate install & test. New air compressor line i.w.o main deck pipe rake.
    - To fabricate install & test. Over flow line i.w.o main deck pipe rake.
    - To fabricate install & test. Fuel oil line i.w.o main deck pipe rake.
    - Remove refit & test cargo line i.w.o 1c,2c,3c,4c,5c, center tanks.

    ARV I
    - To fabricate install & test. Sea water system i.w.o voice space fwd.
    - To fabricate install & test. high pressure fire fighting system and fire water system.
    - To fabricate install & test. deck scupper system.

    BOREALIS 5000 T (Cranevessal) :
    - To fabricate install & test. Weather deck scupper system top deck to main deck
    - To fabricate install & test. Fire water system top deck to thruster 1 2 3 4 and engine room.
    - To fabricate install & test. Hot and could water Accommodation for B C D and Bridge deck.
    - To fabricate install & test. Black and gray water system top deck to engine room.
    - To fabricate install & test. High Pressure Sprinkler system top deck to engine room.
    - To fabricate install & test. Bilge system for aft void space and threster 5 6 7 area
    - To fabricate install & test. Thermal oil system for engine room to top deck and funnel area all so.

    ADDITIONAL INFORMATION :
    Date of Birth : 10-06-1985
    Gender : Male
    Marital Status : Single
    Place of Residence : India
    Highest Education Level : Higher Secondary, India

    Yours faithfully

    (B NARASINGHBHARATHY)

  5. Post Count Number #5
    On probation
    Join Date
    June 11th, 2013
    Posts
    1

    Pipe fabricator experience with 5 years in offshore and 3 years in onshore oil and gas field