November 3rd, 2010, 03:57 PM
Post Count Number #1
IJT addict
Electrical Projects Engineer : Resume CV
CURRICULUM VITAE:
K.B.R.Prasad
Email : Prasad.kbr62 AT rediffmail.com
Objective :
Seeking a suitable senior position where my technical skills and expertise In the field of electrical engineering and project management can be effectively utilized.
SUMMARY :
- Competent and knowledgeable Electrical & Electronics engineer, and having 21 years of expertise in Infra structure planning and creation, Equipment Installation, Project Management activities related to Electrical engineering .
- Proficient in contract management and Time lines, in electrical and telecom related projects,
- Expertise in planning and implementation of projects, which includes procurement, vendor identification, development, analytical assessment and liaison with approving authorities
- Good in man power management and team building, and handled big teams and various projects simultaneously with different levels of Engineers and other staff members having various skill sets, and encouraged team spirit by motivating the individuals.
- Having good exposure in manpower selection, recruitment, motivating and training teams towards organizational goals.
WORK EXPERIENCE : 21 Years
Present Occupation
ICOMM TELE LTD(APRIL’09……..)
Working as district head for rural electrification works in Orissa the scope of work includes erection of 33/11kv ,1.6 Mva transformers, substations ,11kv lines erection of LT distribution transformers and LT Cabling.
Achievement : before I join this project the progress was really in bad shape and our END customer NTPC was un happy .
Now I have completed 73% of the project and heading for project closure by end of May’10.
Seeing my ability in handling the bad shaped project our management posted me at rayagada to take up the challenge.shifted to rayagada project in the month of ma’2010 and raised from zero charging villages to 133 charged villages and ready to charge another 80 villages.
Previous Employment Details :
TEJA technical services(APRIL’ 2008 to MARCH’09).
Working as O&M head for Teja technical services leading telecom contractors in A.P. placed at Visakhapatnam looking after O&M activity for nine districts .
Responsibilities
- Daily wise outage report verification and review with cluster heads and corrective action.
- Electricity bill tracking.
- Diesel justification.
- SME tracking.
- Monthly billing.
- New sites .
- Site inventory and health reports.
- Manpower mobilization and mapping.
- Fuel vehicle monitoring.
S V C Electrical Systems(MAY’ 2006 to MAR’08)
Worked as marketing & Technical adviser in S V C Electrical systems, Hyd , manufacturers of LT. Panels, Control and Relay panels, LT Busducts & AMF Panels and all electrical installation works such as 11kv and 33 kv substations .
Responsibilities :
- Responsible for design, manufacturing and installation of LT Panels.
- Responsible for site work planning and execution.
- Responsible for manpower mobilization and total completion of project.
- Identification of business potential areas and preparation of project report for sales approval
- Liaison with various Govt .depts. Such as AP TRANSCO and CEIG for electrical installation approvals.
Achievements :
- Designed and successfully installed LT Panels for Ramkey infra for their 120 MLD sewerage plant at nagole ,Hyderabad.
- Designed and installed LT Panels for fully automated sewerage treatment plant at Airoli Mumbai for Ramkey infra.
SRI DATTA VAARAAHEE POWER LINKS ,HYDERABAD 2004-2006
Electrical contractors and LT Panel manufactureres.
CHIEF EXECUTIVE
Responsibilities :
- Preparation of estimates(costing),Tendering and design of electrical installations.
- Participation in techno commercial discussions with the customer.
- Production planning and execution.
- Quality control .
Achievements :
- Successfully completed HT & LT Panels and cable installation in RBI ,HYD.
- Suceessfully installed LT Panels and cables in a running plant with out effecting the production in Modern foods ,HYD.
- Supplied LT Panels to various irrigation projects in A.P. through civil contractors.
- Succesfully completed several retrofitting jobs with outr taking much down time in indian railways and other organisations.
VIDESH SANCHAR NIGAM LTD(on contract base). Hyderabad , 2002-2004
Senior officer - NLD team
Responsibilities :
- Execution of OSP works i.e. laying of OFC.
- Co-ordination with the contractors for smooth completion of works..
- Maintenance of the root .
- Maintenance of all electrical equipments in regen stations i.e.D.G. Sets, AC &DC distribution panels.AMF Panels etc..
- Route survey.
- Pop works.
- Liasoning with Government Agencies for getting the relevant ROW Permissions for Execution of the OFC works.
Achievements :
- Successfully completed OFC laying and installation between Jaheerabad and VSNL office at Madapur nearly 100 km
- Successfully completed OFC work in Chennai city nearly 20 km
- Successfully completed POP works in Bhopal,M.P. and AGRA ,U.P.
- Maintained Mumbai and Bhilad OFC route with out a single break down.
RPG TELENET LTD ,Hyderabad, 2001-2002
Project Manager
Responsibilities :
- Preparation of work schedules.
- Execution of OSP works.
- Follow up with the sub contractors regarding work progress.
- Monitoring day to day activities and other site related works.
- Preparation of as built drawings.
- Preparation of running bills.
- Liasoning with municipal dept and other agencies for smooth progress of work.
- Preparation of material indent and stores maintenance.
Achievements :
- Installed 12 ODP ‘S in Secunderabad area.
HAVELL’S INDIA LTD(ECS LTD) ,Hyderabad, 1998-2001 GROUP HEAD for Projects
Responsibilities :
- Preparation of tender documents and costing.
- Attending techno commercial discussions with the customer.
- Preparation of all site related drawings Single line, GA, Schematic.
- Getting approvals from the customer/consultant for the same.
- Monitoring the manufacturing process and quality aspects.
- Installation of total project on turnkey basis.
- Development of subcontracting network.
- Preparation of work schedules.
- Escavation and other civil works for cable laying.
- Payment follow up.
- Follow up with the sub contractors regarding work progress.
- Monitoring day to day activities and other site related works.
- Preparation of as built drawings.
- Preparation of running bills.
- Liasoning with CEIG for installation approvals.
Achievements :
- Established HAVELL’S as one of the preferred make in organizations like Navabharat ferro alloys,IND Bharat bio energy, Tata Projects and other major electrical giants.
- Received best performer award for the year1999-2000 in the LT panel division.
PREMIER SWITCH GEARS LTD ,Hyderabad, 1993-1998 MANAGER DESIGN AND TENDERING,MANAGER QC, Manufacturers of LT Panels and sub contractors for L&t
Responsibilities :
- Preparation of tender documents and costing.
- Preparation of BOQ.
- Technical components, identification of vendors and Procurement.
- Attending techno commercial discussions with the customer.
- Preparation of all site related drawings Single line, GA, Schematic.
- Getting approvals from the customer/consultant for the same.
- Monitoring the manufacturing process and quality aspects.
- Liasoning with L&T engineers for QC aspects.
- Training of engineers for QC and technical aspects.
- Site visits .
Achievements :
- Set up a top class QC team which is rated the best among the L&T sub contractors.
- Got dispatch clearance with out any reworks for all panels which are manufactured in one calendar year.
SUCHITRA COMPONENTS LTD,YANAM PONDICHHERRY 1989-1993 PRODUCTION INCHARGE,DEFLECTION YOKE, Manufacturers of TV DEFLECTION COMPONENTS.
Responsibilities :
- Production planning and control.
- Maintenance of imported machineries(Electrical).
- Customer support.
LOKESH MACHINES LTD,HYDERABAD1987-1989 ASSEMBLY AND SERVICE ENGINEER, Manufacturers of Special purpose machines.
Responsibilities :
- Wiring and testing of the machine as per logic circuit.
- Installation of the machine at customer place.
- Site modification on the logic circuit as per customer requirement.
ADDITIONAL INFORMATION :
Trainings attended :
- Attended EDSA( Electrical design and switchgear assembly ) conducted by L&T at Pune.
- Attended Breaker maintenance work shop conducted by L&T.
- Attended personality development course by DIPD.
- Undergone one week training on operation and maintenance of Diesel Generator sets, at the works of M/s. Kirloskar Electric Limited, Pune.
- Undergone training at Amar raja Batteries on battery maintenance and AMF panel at Tirupathi.
- Trained around 30 NLD Engineers on Electrical maintenance in VSNL.
IT Skills :
- Proficient in MS Office
PERSONAL :
Date of Birth : September 21, 1962
Qualification : B.E. ELECTRICAL
Languages known : English, Hindi, Telugu
February 8th, 2013, 12:38 AM
Post Count Number #2
electrical engg.
SHAHNAWAZ BEG
Email Id : beg_shahnawaz AT rediffmail.com
CARRIER OBJECTIVE :
To secure a challenging position where I can effectively contribute my skills as Core Electrical Professional, possessing competent Technical Skills.
SUMMARY :
B.TECH in EE, diploma in EE have worked successfully work in telecommunication (BTS TOWERS) projects ensuring smooth and timely completion with strategizing techniques for effective utilization of manpower and equipments within the available budget. After that I have worked in Global autotech ltd.in maintenance department as a Electrical Engineer. And also work in Matrix Ventures (P) Ltd. as a Project Engineer.
WORK EXPERIENCE :-
Duration : From August 07 to April 08
Employer : - RNI Gourgoan
Position : - Project engineer
Job Profile :
Since AUG 2007 with RNI GURGAON working as PROJECT ENGINEER
I have completed some electrical & civil work layout of 40 mtr and 60 mtr MW towers including supervision on Civil & Electrical construction activities for complete errection of tower in the state of Rajasthan..
Duration : From April 08 to November 08.
Employer :- Global Autotech Ltd (Greater Noida)
Position : - Engineer (Maintenance. Utility)
Company Profile :
Global Autotech Ltd A Sister concern of SUBROS Ltd, Noida .This company is India’s Largest auto air conditioning company having joint venture with Suzuki and Denso Japan .Company is leading manufacture of air conditioning parts .main customer Maruti,Telco ,Sona Kovo, Hindustan motors Its Manufacture are piston swash and die casting .
Job Profile :
Breakdown, Operating Maintenance of utility equipment as Water Treatment plant, DG Set 500KVA , 250KVA , (Cummins),Compressor 335CFM (Kaeser), Air Dreyer, Cooling Tower Pump , HT/LT Panels , Bag Filter , S.T.P .plant.
Duration : From November 08 to November 09
Employer : Matrix Ventures (P) Ltd.
Position : Project Engineer (Civil, Electrical)
Job Profile :-
I have completed Civil and Electrical work, layout finalization, planning of sites of 12 meter, 15 meter tower including supervision of Civil and Electrical construction activities at site
Duration : From nov. 09 to nov 11
Position : Electrical lecturer
Job profile :
I have worked as a lecturer in govt. polytechnic mahoba. To teach the Electrical M/C- 1,Electrical M/C-2, EIM, PPE
EDUCATIONAL QUALIFICATIONS :
COURSE INSTITUTE BOARD BRANCH YEAR OF PASSING GRADE :
B-TECH CET-IILM GREATERNOIDA U.P.T.U ELECTRICAL 2007 FIRST DIVISION
DIPLOMA GOVT.POLLYTECH-NIC MAHOBA .B.T.E UP ELECTRICAL 2004 FIRST DIVISION
SOFTWARE SKILLS :
1. MS-OFFICE.,Window 2000/XP
2. C & C++
TECHNICAL AREA OF INTEREST :
1. Electrical Machine
2. Power system
3. Power electronics
SUMMER TRAINING :
1. One month in ‘PARICHHA THERMAL POWER PLANT Parichha jhansi.
2. One month in ‘U.P.P.C.L (66 K.V. SUB STATION) MAHOBA’ in the field of . Maintenance & repair engineering
HOBBIES :
Watching movies, reading books, interacting with people& web surfing
PERSONAL PROFILE :
Date of birth 27 / 01 / 83
Nationality Indian
Marital status Single
Strength Positive thinking
Declaration :
I do have be declare that I satisfy all the condition of the eligibility advertised for the all information made by me in the application is true complete to the best of my knowledge and belief.
Date :
Place : JHANSI
(SHAHNAWAZ BEG)