Field Engineer, project coordinator : Resume CV

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Field Engineer, project coordinator : Resume CV

    field engineer/trainer/project coordinator

    TECHNICAL SUMMARY :
    - An enthusiastic Engineering professional (Diploma. E & C) and securing 3.7 year of hand on experience in the field of Satellite Communication & DTH System
    - Detailed Knowledge of Satellite Communication Technology & Equipments like Antennas, LNBF, Modulator, Switchers, and Routers etc.
    - Detailed knowledge of Analog & Digital Video
    - Knowledge of DVB and MPEG standards
    - Knowledge of Set Top Box Technology

    OBJECTIVE :
    Willing to acquire a responsible role, which utilizes each bit of the functional and technical knowledge and expertise that could become the significant contribution in the progress of the organization.

    EDUCATION :
    - Diploma in Electronics & Communication Engg year 2008 Govt. Poly. Edu. Board, Dahod 63.81%
    - ITI in Electronics year 2003 NCVT, Ahmedabad 70.00%
    - HSC [Science Stream] March 2001 Gujarat Secondary Education Board, Gandhinagar 50.34%
    - SSC March 1999 Gujarat Secondary Education Board, Gandhinagar 74.84%

    EMPLOYEMENT SUMMARY :
    - Field Engineer & Project Coordinator Feb 2007 onwards
    Modern Communication & Broadcast Systems Pvt. Ltd.Gandhinagar, Gujarat.
    3.7 - Year Experienced

    PROJECT HANDELED :
    NIIT ROT (Receive Only Terminal) DTH Project (Gujarat)
    - Project including Installation & Commissioning of ROT DTH system at Gujarat.
    - Role as Project coordinator and Team Leader
    - Installed approx. 3000 ROT terminals at various schools
    - Technical Support and Troubleshooting of whole system
    EDUCOMP ROT (Receive Only Terminal) DTH Project (Gujarat)
    - Project including Installation & Commissioning of ROT DTH system at Gujarat.
    - Role as Project coordinator and Team Leader
    - Installed approx. 2800 ROT terminals at various schools
    - Technical Support and Troubleshooting of whole system
    EDUSAT ROT (Receive Only Terminal) DTH Project (Haryana)
    - Project including Installation & Commissioning of ROT DTH system at Gujarat.
    - Role as Project coordinator and Team Leader.
    - Installed approx. 8000 ROT terminals at various schools.
    - Technical Support and Troubleshooting of whole system.

    ITC HOTEL CATV DIGITAL HEADEND SYSTEM MAINTANANCE :
    - Project Include installation, commissioning & maintenance of CATV Headend System of 100 channels.
    - Work as technical support engineer for whole system.

    TATA SKY (DTH) TRAINER :
    - Excellent knowledge of DTH system has given me opportunity to train TATA SKY site engineers at MCBS Pvt. Ltd.
    - Worked as DTH System trainer for TATA SKY engineer at MCBS Pvt. Ltd.
    - Training has been given to site engineer regarding satellite communication and DTH system installation and commissioning.
    Experience related to Set Top Box
    - Knowledge about DVB standards, MPEG and STB technology.
    - Testing of STB using different equipments like as encoder, Modulator etc.
    - Performed different tests on different parameters related to STB.
    - Support production department for STB testing .

    ACEDMIC PROJECTS :
    Well Come Display LED Using IC 555 Timers
    - This project uses IC 555 timer and other electronics devices.

    ACEDEMIC TRAINING :
    SUBJECT : Satellite Communication.
    ORGANIZATION : NICIT (Nation Institute Communication & Information Technology), Gandhinagar (Gujarat).
    Training including DTH installation, Audio-Video Switcher, Routers and other satellite related equipments.

    AREA OF INTEREST :
    - Microprocessor & Microcontroller
    - Analog & Digital Electronics
    - Broadcasting & Telecommunication
    - Data Communication & Networking

    COMPUTER PROFICIENCY :
    - Programming Languages : C programming
    - Windows & MS Office
    - Basics Of Hardware & Networking

    EXTRA CURRICULAR ACTIVITIES :
    - Actively Participated in Inter-Collage Cricket Tournaments
    - Actively participated in Collage Annual Function activities
    - Actively participated in various singing competition
    - Won many certificates at school level

    PERSONAL INFORMATION :
    E-Mail : steven_macwan83 AT yahoo.com
    Date Of Birth :19th November 1983
    Nationality :Indian
    Gender : Male
    Marital Status :Unmarried
    Languages Known :English, Hindi, Gujarati

    DECLARATION :
    I hereby declare that all the statements made above are true, complete and authentic to the best of my knowledge and belief.

    Yours truly,
    Steven J. Macwan

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Project Enginner

    Sankaraiah Nagarajan
    Private e-mail : nagay2k AT gmail.com
    Date of Birth :12th December 1981
    Marital Status :Married
    Nationality :Indian

    CAREER SUMMARY :
    Elevator Design Specialist with over nine of experience working as a designer, three years in the lift and escalator industry. Five years working as a Project Engineer coordinating and evaluating the lift and escalator installations of many construction projects in Asia. Having a good understanding of the social and cultural differences between the Western and the Asian character has helped me to become a more accomplished manager. I am keen to continue pursuing a challenging career where my knowledge and experiences can be used effectively.

    SKILLS AND ATTRIBUTES :
    Communication : In my work, I have to liaise with a multi-national workforces and a diverse range of colleagues and employees from main contractors, consultants, architects and project stake holders. Such a wide range of experiences has enabled me to acquire strong verbal and written communication skills.
    Organisation : As a Project Engineer, I have had to plan and manage the various areas of the elevator construction with a focus on constant improvement to the installation processes. Being results orientated, I have been responsible for ensuring that the quality and work safety standards are achieved.
    Leadership : In my role as Project Engineer, I have led a workforce of subcontractors to complete critical works within limited time frames. I have achieved a high degree of success with identifying the abilities of the contracted staff and offering guidance and support where needed.
    Knowledge : Having been involved in the completion of the Marina Bay Sands IR (Integrated Resort), I have gained valuable experience and insight into many aspects of a large construction project and in-depth knowledge of project and people management.

    EMPLOYMENT HISTORY :
    Project Engineer MITSUBSHI Elevators Pte Ltd, Singapore
    2010 to till now
    Responsibilities :
    Responsible for coordinating the lift design with the Project Architect and clients Project Manager.
    As Project Engineer responsible for coordinating the design features and finishes with the Architect and Design Consultants on the Local Project. Handling the local Project is an interesting and challenging with Different Developer’s, Architect’s, Consultant’s with fulfill their own design solution & criteria’s.

    Project Engineer :KONE Elevators Pve Ltd, Singapore
    2009 to 2010
    Responsibilities :
    Responsible for supervising the installation of the lifts on the Marina Bay Sands IR (Integrated Resort) Project. As Project Engineer I was personally responsible for the installation of the lifts in the MICE (Meetings, Incentives, Conferences and Exhibitions), Retail and Theatre. Coordinating project interface works with other trades, liaising with the client’s representative and project consultants.

    Project Design Engineer : KONE Elevators Pte Ltd, Singapore
    2008 to 2009
    Responsibilities :
    Responsible for coordinating the lift design with the Project Architect and clients Project Manager. Cordinate with Finaland factory & China factory by weekly solve the design issues, ordering the equipment, upload the drawings & documents in EDMSystem & manage the team members & submit the design solution by Cadd Software.As Design Engineer responsible for coordinating the design features and finishes with the Architect and Design Consultants on the Marina Bay Sands IR Project. This was both an interesting and challenging project as there are so many diverse elements that make up an Integrated Resort.

    Project Coordinator :
    New Lift Holdings Pte Ltd, Singapore
    2007 – 2008
    Responsibilities :
    Responsible for coordinating the lift and escalator design drawings with the customer and Architect.
    Responsibilities also include coordinating customer’s requirements with architects and consultants. Attend and record the weekly and monthly minutes of meeting. Learned the skills of project administration and document control. Assisted in the operation of the company audit and quality control systems.

    Project Coordinator :
    Gylet Engineering & Trading Pte Ltd, Singapore
    2006 – 2007
    Responsibilities :
    Responsible for producing and coordinating the lift and escalator design drawings with the customer. In charge of several small projects coordinating activities such as manpower allocation and material deliveries. Meeting with the Project Managers to discuss progress and with the Project Architect to follow up on any design issues. Also responsible for maintaining the project documentation and system inline with ISO quality systems.

    Senior Draughtsman :
    Abrasive Engineering Pte Ltd - Singapore
    2004 – 2006
    Responsibilities :
    Learned engineering design and CAD skills working as senior draughtsman on drawings for Sand Blasting and Dust Machine Systems. Responsible for coordination design with the company’s Engineering Dept. Produce and coordinated shop drawings for subcontractors material processing and feedback to Engineering Dept. Review subcontractor’s progress claims and process company control documentation.

    Draughtsman :
    HCL Peripherals (A Unit of HCL Info-systems ltd) - India
    2002 – 2004
    Responsibilities :
    Responsible for supporting R&D Dept. with CAD drawing designs. Participate in product development for packaging design and test control documentation. Part of development team responsible for engineering the design and packaging for major computer suppliers. (Acer, Ingram, Wipro and PCS computers)

    Draughtsman :
    Hitech Components and Pressings - India
    2000 – 2002
    Responsibilities :
    Responsible for drafting mechanical and electrical CAD drawing designs for press tool components. Prepared shop drawings for temporary work and coordinated with subcontractors. Responsible for arranging weekly internal technical meetings.

    EDUCATION AND QUALIFICATIONS :
    School Completion and Cessation (CERT)
    Diploma In Automobile Engineering (1st Class/Hon)
    Diploma In CADD (Karaikudi – INDIA)
    PRO-E (CERT)
    AUTOCAD 2005 (Level 1) (CERT) 1993 – 1997
    1997 – 2000
    2000
    2004
    2007

    ADDITIONAL SKILLS AND INTERESTS :
    Working knowledge of several computer software packages including, Microsoft Project, Word, Excel and PowerPoint.
    Technical Programmes;
    AutoCAD Release - 14 to 2006
    3D AutoCAD drafting
    Solid Modeling from Pro-E
    Languages skills; English, Tamil and Hindi.
    Sport : Cricket

  3. Post Count Number #3
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    CURRICULUM VITAE :
    E-mail -
    Prasenjit.khanra AT gmail.com
    prasenjit.khanra AT electroimpex.co.in
    PRASENJIT KHANRA

    Objective :
    To achieve professional and personal excellence by means of positive and honest determination together with constant learning and improvement and by accepting fulfilling targets and goals for both the areas.

    Work Experience :
    Working at Electro Impex Pvt. Ltd. (EIPL) (An ISO 9001 : 2008 Company) as a Project Co-ordinator(Infra Project Indus-w.b & Bharti Infratel-orissa) from 1st March 2008 to 30th September 2009,As a Project Manager(Infra Project Indus-W.B & Kol.) from 1st oct 2009 to till date….
    Industry Type :Telecom / Construction/ Manufacturing/Shipbuilding
    Job Profile :
    - Program Management
    - Assist to preparing of Quotation
    - Preparing of MIS Report
    - Preparing Daily Activity Report of Project.
    - Preparing Weekly/ Month Wise Project Report.
    - Maintains database of projects
    - Coordinating with customer and maintain track report.
    - Maintain reports , Bill report of transport company
    - Maintain database of Vendor Company.
    - Doing Several Works with our Project Team
    - Doing several works instructed by General Managers/Director
    Project Details :
    - Indus- Idea Project.
    - Indus-Airtel Project
    - Indus-Vodafone Project
    - Indus-Uninor Project
    - Indus-Reliance Project
    - Indus-Aircel Project
    - Bharti Airtel(W.B)
    - Bharti Infratel(Orissa)

    Educational Qualification :
    Examination University Year of passing Class % Marks :
    Higher Secondary W.B.C.H.S.E 2005 Back
    Secondary W.B.B.S.E. 2003 2nd 58%

    Computer Proficiency :
    Operating System : WINDOWS 2000
    Other Software : MS-OFFICE 2007, TALLY – 9.1, FACT, EX- NEXT GENERATION, INTERNET

    Strengths :
    - Hardworking ability
    - Ability to learn new things quickly
    - Ability to work under stress and changing environment.
    - Ability to work both as individual and as a team member.

    Personal details :
    Date of birth : 05/05/1987
    Languages Known : English, Hindi and Bengali
    Hobbies : Listening music & Playing Cricket
    Marital Status : Unmarried

    Declaration :
    The above submitted information is true and correct to the best of my knowledge and belief.

    Place : Howrah
    Date :
    Signature
    (Prasenjit Khanra)