    www.scc-procyon.com Procyon Systems Pvt Ltd Chennai : Piping Draftsman

    Piping Draftsman

    Job Code : PD

    Job Desicription :

    · Prepare PIDs, PFDs, Plot Plan, G.A.Ds etc.
    · Extract Isometrics from G.A.s
    · Extract Spool Drawings from Isometrics
    · Finalise As-Built Drawings

    Eligibilty :

    · DME or B.E Mech or Chemical
    · Minimum 2 years project experience in piping field
    · Should be thorough in ASME/ ANSI Standards
    · Well versed with Piping Drafting, Symbology etc.
    · Good speed in AutoCAD

    For career and jobs : hrd@scc-procyon.com

    About us :
    Procyon Systems is a multi disciplinary Engineering design and detailing services company offering its professional services to EPC companies, Engineering companies, and Independent consultants across the globe.We provide design and detail-engineering services in the field of Piping, Pressure Vessels, Electrical, HVAC, Architectural, Civil and Structural design and detailing with an exclusive domain focus on plant engineering for the past 2 years.

    Contact us :
    PROCYON SYSTEMS Pvt.Ltd.
    Engineering Design Services,
    New No. 142, Konnur high road,
    Ayanavaram
    Chennai - 600 023.
    Tamilnadu,INDIA
    Phone : 91 44 43180935
    Mobile : 91 9710412271
    http://www.scc-procyon.com

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    RESUME OF JAGMOHAN SINGH
    jagmohanassal AT gmail.com
    Name Jagmohan Singh

    DOB
    RESUME OF JAGMOHAN SINGH
    jagmohanassal AT gmail.com
    Name Jagmohan Singh

    DOB 01-12-1949
    Qualification B.E(Mech) in June,1973
    Univ/College Kurukshetra univ, Rgional Engg. College

    Superannuated on : 30-11-2009 on the Post of Dy.General Manager(C&M)
    Contact Details
    E-702, SAHAJANAND APPTS, Gurukul road, Memnagar
    Ph. 9904910079
    email.jagmohanassal AT gmail.com AHMEDABAD-380052
    Experience
    Total …35-1/2… Years
    1.Posted in Ahmedabad Asset from 01-07-74 to 15-5-80, Mehsana Asset from 16-05-80 to 20-05-86 in C&M div.
    2.Posted in Eastern region(Assam) Sibsagar from 25-05-86 to 30-06-90 in C&M div.
    3.Posted in E&C Section MRBC, Maker tower, cuffe parade,Mumbai from 01-07-1990 to 15-05-2000
    4. Posted in Ahmedabad asset from 20-05-2000 to 30-11-2009 in C&M division
    Assignments Discharged
    A.ONSHORE EXPERIENCE
    1. Preparation of estimates,tendering activities,award of C&M works for execution of laying of flowlines, laying of trunk feeder/collector pipelines, consruction of various capacities of MS vertical storage tanks along with its civil foundations (from 50 M3 to 5000 M3 ) at Ahmedabad Asset .Discharged duties as supervision/inspection at drill sites for laying of flowlines in nawagam,jhalora,sanand,viraj,south kadi, Jotana,sobasan fields, and installations of Ahmedabad,Mehsana assets at various levels from E0 to E4
    2.Constuction of New EPS station, GGS and Revamping jobs at GGS,CTF,ETPand water injection plant at Kalol,area-3
    3 a).Laying of 6” dia HP water inj line from kalol 5 to kll CTF via kll ggs2.
    b) Laying of new HP gas line from Ramol ggs to CTF navagam
    c)Laying of oil line from Lim ggs1 to Lim ggs2
    d)Laying of 8”dia oil line from Nandej EPS to Ramol ggs
    e)Laying of 8”dia eff. Disposal line from virag ggs to s.kadi ctf
    4.Construction of LP gas compressors stations at Lakwa ggs2,3,4,5,6,7,8 and HP gas compressor station at Lakwa ggs1,laying of flowlines in Lakwa fields
    B.OFFSHORE EXPERIENCE;
    5.Executed the new well platforms HSA and HSB in South Heera field and major revamping jobs at HPS process platform in the capacity of Project co-ordinator right from clearance of FR,PIB & CCEA,Award of work,execution of work which envolves monitoring of daily,weekly,monthly progress reports, holding meetings with turnkey contactors, planning catch-up plans where progress is not as per the schedule completion, interacting with the various agencies eg inspection agencies,suppliers,arranging timely inspectors at workshops, manufacturing units,arranging various offshore permissions for working of contractors staff at off shore site at lay barge, arranging shut down of operation for carrying out modification jobs at operational process plateform, preparing joint punch list after commissioning of project and finalization of work comprising of establishing of delay in work if any for working of liquidated damages.for issuing of final completion certificate to the turnkey contractors
    6) Executed laying three pipeline project in Neelam and south heera field as project co-ordinator
    7) Laying of 8 segments of co-flex water inj lines in Bombay high south,inspection of co-flex pipes at Paris,France at the manufacturing unit of the company
    8) Supervised Neelam Process Platform construction at HHI shipping yard Ulsan South Korea for two months in Aug,1995
    I performed duty as Location Manager(works) in Ahmedabad asset in E&C div for 1-1/2 yrs and worked as incharge of C&M div Ahmedabad Asset from June2003 to Nov,2009

    Strengths :
    - I believe in achieving success mainly due to persistent hard work,maintening cordial working atmosphere and relationship with working team members and management.
    - In order to complete the Project in time, I emphasize on close involvement of senior management whenever needed

    JAGMOHAN SINGH
    Qualification B.E(Mech) in June,1973
    Univ/College Kurukshetra univ, Rgional Engg. College
    O1-12-1949
    Superannuated on : 30-11-2009 on the Post of Dy.General Manager(C&M)
    Contact Details
    E-702, SAHAJANAND APPTS, Gurukul road, Memnagar
    Ph. 9904910079
    email.jagmohanassal AT gmail.com AHMEDABAD-380052
    Experience
    Total …35-1/2… Years
    1.Posted in Ahmedabad Asset from 01-07-74 to 15-5-80, Mehsana Asset from 16-05-80 to 20-05-86 in C&M div.
    2.Posted in Eastern region(Assam) Sibsagar from 25-05-86 to 30-06-90 in C&M div.
    3.Posted in E&C Section MRBC, Maker tower, cuffe parade,Mumbai from 01-07-1990 to 15-05-2000
    4. Posted in Ahmedabad asset from 20-05-2000 to 30-11-2009 in C&M division
    Assignments Discharged
    A.ONSHORE EXPERIENCE
    1. Preparation of estimates,tendering activities,award of C&M works for execution of laying of flowlines, laying of trunk feeder/collector pipelines, consruction of various capacities of MS vertical storage tanks along with its civil foundations (from 50 M3 to 5000 M3 ) at Ahmedabad Asset .Discharged duties as supervision/inspection at drill sites for laying of flowlines in nawagam,jhalora,sanand,viraj,south kadi, Jotana,sobasan fields, and installations of Ahmedabad,Mehsana assets at various levels from E0 to E4
    2.Constuction of New EPS station, GGS and Revamping jobs at GGS,CTF,ETPand water injection plant at Kalol,area-3
    3 a).Laying of 6” dia HP water inj line from kalol 5 to kll CTF via kll ggs2.
    b) Laying of new HP gas line from Ramol ggs to CTF navagam
    c)Laying of oil line from Lim ggs1 to Lim ggs2
    d)Laying of 8”dia oil line from Nandej EPS to Ramol ggs
    e)Laying of 8”dia eff. Disposal line from virag ggs to s.kadi ctf
    4.Construction of LP gas compressors stations at Lakwa ggs2,3,4,5,6,7,8 and HP gas compressor station at Lakwa ggs1,laying of flowlines in Lakwa fields
    B.OFFSHORE EXPERIENCE;
    5.Executed the new well platforms HSA and HSB in South Heera field and major revamping jobs at HPS process platform in the capacity of Project co-ordinator right from clearance of FR,PIB & CCEA,Award of work,execution of work which envolves monitoring of daily,weekly,monthly progress reports, holding meetings with turnkey contactors, planning catch-up plans where progress is not as per the schedule completion, interacting with the various agencies eg inspection agencies,suppliers,arranging timely inspectors at workshops, manufacturing units,arranging various offshore permissions for working of contractors staff at off shore site at lay barge, arranging shut down of operation for carrying out modification jobs at operational process plateform, preparing joint punch list after commissioning of project and finalization of work comprising of establishing of delay in work if any for working of liquidated damages.for issuing of final completion certificate to the turnkey contractors
    6) Executed laying three pipeline project in Neelam and south heera field as project co-ordinator
    7) Laying of 8 segments of co-flex water inj lines in Bombay high south,inspection of co-flex pipes at Paris,France at the manufacturing unit of the company
    8) Supervised Neelam Process Platform construction at HHI shipping yard Ulsan South Korea for two months in Aug,1995
    I performed duty as Location Manager(works) in Ahmedabad asset in E&C div for 1-1/2 yrs and worked as incharge of C&M div Ahmedabad Asset from June2003 to Nov,2009

    Strengths :
    - I believe in achieving success mainly due to persistent hard work,maintening cordial working atmosphere and relationship with working team members and management.
    - In order to complete the Project in time, I emphasize on close involvement of senior management whenever needed

    JAGMOHAN SINGH