-
October 31st, 2010, 08:10 PM
Post Count Number #1
Construction Manager Jobs Muscat : MonteAdriano
MonteAdriano Muscat : Construction Manager
Company Name : MonteAdriano
Company Location : Muscat
Designation (of vacancy) : Construction Manager
Company E-mail ID : recruitment@monteadriano.co.om
Company Website : www.monteadriano.co.om
Job Description, Candidate Profile, Company Profile, Company Address :
10 years experience as contruction manager
experience in sewage, wastewater networks, pipeline, TE
About us :
MonteAdriano Middle East is a contractor for Oman Wastewater Services Company (Haya Water) to build Al Khuwair wastewater network.
The project consists of networks of pipes connecting buildings to a central, from which the water is then pumped to Al-Ansab water treatment plant. After the water is treated, it is pumped into a separate network for irrigation purposes. In many cases, the excavations happen in existing roads to provide sufficient space for the pipes to be fitted and using appropriate equipments to dig pipe tunnels under the roads.
Contact us :
Post Address :
P.O.Box 16, MAF Qurum, P.C. 102,
Sultanate of Oman
Contacts
Tel : +968 24 566 646
Fax : +968 24 568 100
-
May 25th, 2011, 07:59 PM
Post Count Number #2
Job for Mechanical Engineer
Raja Sathish. D
Email : rajasathish.d AT gmail.com
rajasathish.d AT hotmail.com
Objective :
To pursue a mutually challenging and rewarding career in HVAC Engineering (Mechanical).
Summary :
- Overall 9 years of experience in HVAC Engineering.
- Excellent human relation skills, having dealt with a Varity
of Customers and employees.
- Proven ability to analyze, plan, manage and motivate.
- Superior ability to achieve immediate and long-term goals.
TECHNICAL QUALIFICATION :
Passed Diploma in Mechanical Engg. From V.L.B.Janakiammal Polytechnic College, Polytechnic, Coimbatore, Tamil Nadu, India in the year of 2001 with 86.80% (First Class with Honor)
EDUCATIONALQUALIFICATION :
Passed SSLC from John Dewey Matriculation Higher Secondary School Villupuram, Tamil Nadu, India in the year of 1998. (First Class with Honor)
Computer Skill :
Auto CAD 2004, MS- Office, Windows 98, Internet.
Professional Experience :
- March 2010 to Till date - with Al Faraa Gen. Cont. Co. LLC, Abu Dhabi.
Presently Working as Mechanical – Inspector in Al Ain Mall & Resort, Al Ain.
JOB RESPONSIBILITY :
- Ensuring that the Quality of material and installation work is in accordance with the approved construction program/acceptance criteria/specifications/approved materials and method.
- Ensuring that the work is completed in accordance with the approved Quality management and control system and in a safe manner.
- To inspect the Installation of HVAC & Fire Fighting works as per approved shop drawing.
- To inspect the Materials for HVAC & Fire Fighting works as per specification.
- To follow up WIR clearance with consultants.
- To clear NCR with in duration.
- To follow up with the site for variation approvals.
- To facilitate & implement in house contracting system.
- To represent site for any queries regarding material from head office.
- February 2009 to October 2009 - with Almoayyed Contracting Group, Bahrain.
Working as HVAC Projects Engineer in Gulf Hotel & Era Business Centre, Bahrain,
- To prepare Schedules of Quantities for materials required in the mechanical work of MEP projects based on tender drawings & specifications.
- To verify & prepare comparison of tender BOQ with construction BOQ.
- To submit the details as per the requirement of client / consultant for variations / EOT claim.
- To technically verify & certify the items as per the LPO for the problematic bills submitted by accounts department.
- To submit the item wise monthly LPO expense report for the mechanical divisions of project.
- To prepare & verify the cost to complete report for the running projects.
- To prepare comparison between planned & actual work done variance (monthly basis) for Mechanical divisions.
- To verify all PDC /CDC / LC documents for Mechanical Divisions for further submission to accounts.
- To submit the details of qty executed in cases of qty clarification as required by the main contractor for the MEP work or engineering sub contractor work.
- To follow up with the site for variation approvals.
- To facilitate & implement in house contracting system.
- To represent site for any queries regarding material from head office.
- September 2005 to September 2008 - with VOLTAS Ltd
Working as HVAC Site Engineer in Bahrain City Center, Bahrain Project with team of Mall Areas, Car park, and Central Cooling Plant (C.C.P) site operatives and initial 6 months worked in Procurement and Submittal.
JOB RESPONSIBILITY :
- To ensure timely execution of work at site as per the issued construction drawings, method statements and specifications.
- Ensure installation meets the quality Standards.
- To ensure proper work allocation and maintain full control at site.
- To initiate material requisition as per the requirements well in advance.
- To arrange transportation of material from store to site.
- To prepare daily work progress report and submit to Project Manager.
- To mark the progress of work on drawings.
- To proactively coordinate with the civil/other contractors and in house agencies.
- To ensure safety norms/requirements are followed and proper house keeping is maintained.
- To ensure proper maintenance of documents and records.
- To raise Inspection requests and arrange inspection accordingly.
- To minimize wastages of manpower and material and avoid any occurrence of abortive work.
- To impart on the job training to foremen/workmen on installation methods and procedures and application/operation of tools and requirements.
- To compare the revised drawing with earlier revised drawing of quantity variation for Engineering Submission (E.I).
- To Raise Request for information (RFI) when the details are not sufficiently.
- To Quantity agreeing with client
- To make the pricing for E.I variations and submissions.
- To prepare the material submission according to Specification, price and technical comparisons.
- To give the clearance for civil work inspection request.
- To get the Quotation from suppliers and price comparison with various suppliers.
- To maintain record drawing to note changes for as built drawing.
- Any other related duties and responsibilities as assigned by the site engineer/Area manager.
- To coordinate with Main Contractor & Client for Handing Over.
PROFESSIONAL TRAINING UNDER GONE :
- Heat load calculations
- Pump head calculations
- External static pressure calculations
- Sizing of Piping and ducting
- Selection of equipments
- GRP lamination methods
- Quality Standards
- Plumbing and Fire fighting Systems
- Electrical and Basics of BMS system
Major Projects Done :
Handled in the capacity of “Site Engineer-HVAC”
1. Voltas Limited Project Bahrain City Centre, Kingdom of Bahrain.
Client : Majid Al Futtaim Investment LLC, Dubai (UAE)
Consultant : Connell Mott MacDonald Ltd., Dubai (UAE)
Main Contractor : Cebarco – WCT W.L.L. Bahrain
This multi-million dollars project having Hotel and Mall includes capacity of 12810 TR approx. Chilled water AC systems. This includes CHW Pumps, Chillers (1530 L/s), AHU’s & FCU’s,
Responsible for AHUs, FCUs, Axial Fans, Jet Fans, Smoke Extract Fans, CHW Pipes & HVAC Ducts (S.S, G.I, PIR Ducts] installation, testing & commissioning.
Having Knowledge in installation, testing & commissioning
of Chillers, Primary Pumps-7 Nos, Secondary pumps-24 Nos, Cond.Pump-7 nos, Cooling tower-7 Nos, Chilled water Piping (600 dia-Tunnel piping, Victaulic joint, 1000 dia and other sizes) condenser water piping (GRP-1200 dia & other sizes) and other equipment in central cooling plant. (Pressurisation unit, Chemical dosing, make up pump, vortex air separator, side stream filtration unit, heat exchangers-7 Nos and automatic tube cleaning system)
- May 2003 to Septemper 2005 Voltas Limited - Chennai
Worked as a HVAC Supervisor. For this project my job profile is as below.
JOB RESPONSIBILITY :
- Execute HVAC work at site in coordination with other services by leading a team.
- Complying with all Company Policies, Quality procedures, Statutory Regulations, Safety Regulations and project Specifications
- Ensuring that the Quality of material and installation work is in accordance with the approved construction program/acceptance criteria/specifications/approved materials and method.
- Ensuring that the work is completed in accordance with the approved Quality management and control system and in a safe manner.
- Proactive Management of materials, labor and tools/tackles.
- Coordinating and planning of day-to-day site activities/works with site staff.
- Proactive coordination with civil/subcontractor for proper execution and planning.
- Prepare and project any requirement with respect to materials, plant, tools & manpower or any other items required for timely/safe execution of MEP services/activities.
- Preparation and submission of daily/weekly/monthly reports with respect to work allocation, progress, programme and workforce to Construction Manager.
- Provide all required inputs/information to the QS through CM with respect to the monthly progressive billing.
- Ensuring that the work is executed in accordance with the construction drawings, specifications, agreed procedures and method statements in a safe manner.
-
July 16th, 2011, 01:13 PM
Post Count Number #3
colledgeMEL AT aol.com
03-2010 - present Tunnel Manager Targetunderground
Running Pipe Ramming & Pipe Pushing Projects in Muscat Oman
Pipe Sizes 36” 42” 48” Steel Pipes Under Road Crossings for new Pipelines
Involved hands on setting up / ramming / cleaning out monitoring line & level
9-08 > 03-2010 Project Manager Dutco McConnell Dowell Dubai
Involved in pricing Projects from 5million through to 154million
Full Project Management on Gas pipeline in Fujairah 14” Steel covering all meetings / NOC / site activities and weekly reports ect. Also Hamriyah steel 10” steel pipeline plus Meter and Pressure reduction skid installation with scada system.
Also on 48” Gas Pipeline NOC / Permit Manager
Also Directional Drilling and Auger Boring.
Listed below Projects involved with.
Sewer / Storm / Irrigation / Fire / Portable water / Trenchless methods / Steel pipelines
6-08 > 9-08 Construction Manager - Shareidge ltd Ireland
Water Scheme for Sligo council (Keash water scheme)
Site based running the teams from welding / trial holes / Directional Drilling / testing and connections followed by commissioning.
10k of Directional drilling with bits of open cut water mains and services.
7-07 > 6-08 Construction Manager - JCharlton Water engineers
Scottish Water AT Northumbrian Water
Supervising large diameter pipelines p.e also ductile. 500mm / 550mm
Special Sections Directional Drilling.
Site based over see all activities from excavations / welding & ditching / Pressure testing and connections / commissioning. Weekly reports ie payroll / plant ect
4-07 > 7-07 Construction Manager - Fastflow pipelines
Northumbrian Water term Contract south and east area
Over see Design team and have input on methods of pipe laying ie Trenchless or open cut methods. Take on meetings with client also company present weekly reports.
Over see Pipebursting and Relining Projects
5-05 > 4-07 Contract Manager - CaL Solutions ltd
Street lighting contract - Newcastle area.
Control hire and fire of Labor / motivation of teams / execution of works / meetings and week reporting to client also company.
9-04 > 5-05 Contract Manager - Enterprise plc
Leakage contract - Thames water east AT west London. 135 Teams
Plan teams for day shift also night shift for leakage controls / rapid response teams to fix leaks
All sizes diameters. Program excavations / repair / Backfilling and permanent reinstatement.
Weekly meeting client and company and issue reports.
10-03 > 9-04 Sub Contracting
Gas contract McAlpines Yorkshire mains / services & pipebursting
BT ducts Enterprise plc - North east.
Hands on sub-contracting excavations / pipebursting / pipe laying / connections / reporting
7-03 > 10-03 Versteden (rotterdam) Pressure testing
working in petro chemical plant pressure testing from 1 bar to 16 bar
all above ground pipework 1" > 30"
01 > 7-03 Sub Contracting
pipebursting AT insertion Gas/Water contracts.
Hands on excavations / pipe work / specialist works ie pipebursting / slip lining / reporting.
01 for six months Superintendent (portland construction co U.S.A)
pipebursting sewer lines South Carolina/Tennessee/Atlanta/Kentucky USA
main lines 6" 8" 10"12"20"28" and laterals 3"4"
also point repairs.(man hole to man holes up sizing existing sewer pipes)
All works from excavation through to upsize of pipes / connections to man holes and commissioning.
Also weekly reporting of measures and labor ect.
00 > 01 Sub contractor
pipebursting AT directional drilling
contracts in UK also Germany drilling the Munich auto-ban for ducts.
Gas/Water AT ducts
Specialist sub-contractor on Trenchless methods hands on.
99 > 00 Construction Manager (ARM)
Severn Trent - water.
mains AT services new works AT renewals pipebursting/directional drilling.
Advise planners on methods / Program teams / monitor teams / meetings and weekly reporting.
98 > 99 Works Director (A.H.Ball) Water.
North Surry / Bournemouth - term contracts water leakage / Thermo pipe insertion.
Mid Kent / Wessex / Cambridge all one off specials cross country pipelines water.
Monitor company performance and advice on work methods also look for expansion to new clients and new methods of working within Trenchless methods.
96 > 98 Sub contractor
pipebursting / directional drilling AT open cut
water contracts.
Hands on Specialist sub-contractor in Trenchless methods
85 > 96 Kentons Utilities.
85-89 Forman - Pipebursting (water) 2" > 8” cast AT splitting steel / ductile / p.e
89-90 Superintendent running pipebursting crews also specials drilling / chain trenching
90-92 Contract Manager Gas term contract North east.
92-94 Regional Manager Water contracts all UK also Europe.
94-96 Works Director Water contracts
Scottish water - Northumbrian water
Hartlepool water - York water
Yorkshire water - Cambridge water
Three valleys water - Mid Kent water
Southern water - Wessex water
West Surrey water
Europe Contracts
Italy water pipeline ( 80mm P.E split and inserted 140mm )
Poland gas pipeline ( pipebursting )
I.O.Man water pipeline ( pipebursting )
Gurnsey water ( pipe splitting - Consplit )
All works from hands on pipe laying Forman through to Works Director.
Involved in bringing Trenchless methods into company Develop the systems and train personnel to operate such systems. Educate and demonstrate methods to new clients and develop work orders. Monitor contracts and weekly reporting.
81 > 85 P.J.Burke
Service layer (Gas.) also Mains insertion work Gas.Pipelaying Forman installing Gas services by mole methods / pipe insertion.
78 > 81 W.Press AT sons - employed as Labor
Gas distribution work Scotland
Gas pipelines steel 6" / 18" / 3 x 12" cross country involved in all work from stringing to backfilling.
Tickets - Qualifications.
Street Works Supervisor level RASWA.
C.I.T.B. GD4 Gas also passport to work gas safety.
N.V.Q. Level 2 main laying Water.
CPCS 360 all sizes excavators
NVQ 360 excavators
C.T.A 180 excavators
Also Certificate for Directional Drilling.
Diploma in Operational Management.
Experience covers all pipe work on Gas/Water AT Sewers.
Supervising and Management
all No-Dig systems-specializing in pipebursting.
cable and duct laying.
Operate all types of excavators - track/wheel any sizes.
Involvement on contracts from advising planers on methods of work and to price into jobs.
Also hire of Labor / program / motivate / monitor / reporting and developing better and smarter ways of working for company also clients.
Specialist in all Trenchless methods.
Have UAE ID card also UAE Drivers Licence