-
July 13th, 2008, 01:21 PM
Post Count Number #1
KSK Energy Ventures Ltd Warora, Hyderabad : Thermal Power Plant Site Engineer
KSK Energy Ventures Ltd.
http://www.ksk.co.in
Company Profile
KSK plc is the Indiaâs first focused Power project development and Investment Company to be listed on Alternate Investment Market (AIM) of the London Stock Exchange. KSK operates in India through its fully owned subsidiary, KSK Energy Ventures Limited (KSKEV). Its operations in the Indian Power Sector are powered by the growth opportunities it realizes and capitalizes on. Lehman Brothers of USA has 33.5% stake in KSKEV.
Experience:15 - 25 Years
Location:Warora Maharashtra , Champa CG
Job Description
- Head EPC - Mech Work for Thermal Power Plant. Project Planning, Scheduling, Contract Finalization, Execution, Monitoring, Timely completion of Project
- Conceptualizing the green field project from sketch to delivery.
- Project planning
- Deep understanding of equipment sourcing & Negotiation skills for reducing the cost of project
- Implementation and execution of mechanical erection of units apart from overseeing the civil activities
- Regular progress review with all agencies responsible to complete the project within time bound schedule
- Sound knowledge of global and domestic vendors
- Man power allocation, tap all the desired resources needed and provide leadership to entire project team
- Closely co-ordinate with finance and commercial heads
- Prepare commissioning documents & checklist for commissioning activities
- Fabrication of mechanical structures, installation & testing of mechanical systems like Raw material handling system, boilers, turbines & auxilliary
Desired Candidate Profile
- Experience in Plant/Site Work for Thermal Power Plants-EPC Project Planning, Scheduling, Contract Finalization, Execution, Monitoring.
- Fabrication of mechanical structures, installation & testing of mechanical systems like boilers,turbines & auxilliary, RMHP
- Cost Engineering, Engineering Design and Construction for Power Plant.
- Specifications related to plant equipment, auxiliaries and utilities.
- National and International industry standards in power plant engineering.
- Vendor base for providing services in power plant design and construction.
- Policies, Procedures and guidelines for contracts and material.
- Project Planning and Management.
- Engineering related IT Applications.
- Power Generation process, from fuel procurement to dispatch from plant.
- Maintenance for a power station.
Keywords: plant head, mechanical Lead, project head, project lead, site head, power, thermal, coal, mechanical
KSK Energy Ventures Limited
8-2-293/82/A/431/A
Road No:22, Jubilee Hills
Hyderabad 500033, INDIA.
E-mail: info@ksk.co.in.
Civil
The essence of this job description is putting in all efforts whenever and wherever required for
smooth implementation of the projects within the budgeted cost and time schedule.
Following is the broad list of various tasks under this job description :
** For a given project, float enquiries for Soil investigation, Topography survey and Environmental studies.
** Study the layout requirements of the project including area requirement for, main, auxiliary and balance of plant equipment, fuel storage, water storage, effluent storage, switchyard, green belt and future expansion requirements.
** Study the direction of all the inputs into and outputs out of the plant. ** Study the shape of the plot and work out a compact layout in consultation with superiors and the engineering consultant.
** Prepare the list of all the documents and drawings for preparing the documentation for various permits and clearances required for the project. ** Discuss with the engineering consultant and obtain these documents at an early date.
** In consultation with a civil design or structural consultant, work out the BOQ of various parts of the civil
** In consultation with superior and the engineering consultant float enquiries to various civil contractors, receive bids, seek clarifications and conduct meetings with contractors at a mutually acceptable location (at Head Office, Consultant's Office, Contractor's Office or at Site).
** Prepare separate technical and commercial comparative statements.
** Assist the management in finalising the contract, preparing LOI, draft Contract/ Purchase Order and release the same.
** Coordinate with Accounts Department for release of advance and follow-up payments at respective and agreed milestones.
** Coordinate and follow-up with contractor to ensure contract progress as per the agreed scope and time schedule and in line with the overall project schedule.
** Maintain all the contract documentation regarding supply of material and services rendered/ to be rendered by the contractor.
** Coordinate with site for safe, timely and sequential arrival of material. ** Follow-up and chase with the vendors to make good, any short supply. ** Prepare project schedules for civil activities for various projects pursued by KSK Group wherever you are involved.
** This schedule will include the specification preparation, tendering, clarification meetings and contract finalisation schedule.
** Follow the schedule strictly to achieve the target dates. After studying the project schedule, ensure timely actions for activities.
** Follow up and discuss remedial measures. Review it weekly / fortnightly and update the management on impact of various activities on main project schedule.
** Post conclusion of the civil contract, maintain activity chart for each civil contract for the respective projects and report status for action, periodically.
** Site action Report - Organize remedial measures for problems reported from site including problems related to design drawings, non-supply of material and other logistics difficulties.
** To issue letter to contractor informing of slippage, if any. Close monitoring is to be ensured.
** Periodic visits to site to assess progress and attend to site problems.
** To attend monthly project review meeting and formulate the action plan as recorded in the minutes of meeting.
** Study the impact on the project schedule and budget and inform the management immediately.
** Monitoring of consultant's work progress is to be recorded continuously. ** Maintain the date wise log-book drawing issue / release status.
** To be at site during any major civil activity as critical foundation concrete pouring etc. and check adequacy.
** Provide relevant information and assist the other departments in obtaining permits and clearances for the project.
** Be responsible for coordination with the engineering consultant for, on-time release of specifications, tender documents, release of drawings and approval of contractor/supplier submitted drawings or specifications.
** In consultation with the consultant and superiors, support the site for any road-block removal towards smooth implementation of the project in time and within the budget.
** Develop familiarity with Autocad and Project management softwares.
Budget
** Budget preparation.
** Review of actual expenses vs planned. Variance analysis.
** Revising the budget based on changing project schedule.
** Prepare monthly MIS and forward to management for review
** Verify the bills forwarded by the contractor for the work done and against site job completion / measurement certification and the contracted payment terms.
** Forward the bill for approval and finally to accounts, for payment. ** Maintaining, on computer, records for payment to each contractor
Qualification : BE / B.Tech in Civil engineering
Experience : 10 to 15+ years
Location : Hyderabad, Warora
No. of Positions : 2
--------------------------------------------------------------------
Position : Deputy General Manager Technical / Manager Technical - O&M
Location : Hyderabad
Qualification : Master / Bachelors Degree in Mechanical Engineering
Experience :12 – 15 years in power plants associated with Gas / Steam based Generator, Turbine.
The candidate should have extensive experience in Planning and handling balance of plants.
He should have demonstrated managerial skills. Certification in Boiler operations
Reporting to : Head Operations
Responsibilities:
** Ensure implementation of Operations and Maintenance contract
** Ensure adherence to Maintenance Schedule
** Review of Plant proposal for modifications
** Spares planning
** Analysis of MIS on downtime and operations parameters
** Reduce unscheduled outages
** Operations and Maintenance, Vendor evaluation
** Performance planning and implementation
** Implement compliance of safety and environment
** Water and Fuel analysis
** Monitoring Auxiliary consumption
** Monitoring performance parameters Vs. contractual guarantees
** Understanding and maintenance of project as built drawings
** Analysis of consumables
** Ability to trouble shoot
** Ability to handle multiple power plants
-----------------------------------------------------------------
Position : AGM / DGM / Manager Commercial – O&M
Location : Hyderabad
Qualification : Master / Bachelors Degree in Mechanical Engineering In addition,
MBA will be an added advantage
Experience :10 – 12 years in power plants associated with Gas / Steam based Generator, Turbine,
Boilers and BOP. The candidate should have extensive experience in handling Commercial
operations of power plants. He should have demonstrated managerial skills.
Reporting to : Head Operations
Responsibilities:
** Review of contracts
** Identify commercial issues for resolution
** Coal planning and procurement
** Transport contracts for Coal and Fly Ash.
** Billing as per PPA / PDA
** Follow up on payments
** Spares procurement
** Regulatory issues
** Working knowledge on Direct and Indirect taxes
** Familiarity with ABT implementation
** Follow up on deliveries and vendor development for spares
-------------------------------------------------------------
Position : Head - Planning Scheduling and Coordination
Level : Senior / Middle
Location : Head Office (Hyderabad)
No. of Position : 1
Your Role : Senior Management / Middle Management To be responsible for the overall integrated planning for the development of the long term plan for the Organization to achieve capacity targets visualized.Develop the individual
** Pre Order Network for the Development Phase of the Project for activities prior to the Zero Date of the Project which is the key to Main Project take off in time .
** Overall Master Net work for each Project
** These networks development to be part of a process in which executing departments own the responsibilities for the plans
Monitoring and Control of the Projects to ensure completion of projects in time. To identify timely to Management the key areas of concern and ensure correct measures be taken.
Must analyze the different progress reports emanating from site, EPC Contractor and other departments to pick up the critical areas for ensuring the actions, advise on formats compliance, improvement etc., In the process of identification of progress & bottle necks - must be able to project through different techniques the highlights for early actions.
Carry out periodical audit of the Planning, scheduling and monitoring systems and make the systems tune to effective implementation.
Must lead /guide a team of Planning Engineers at different levels both at
Head Office and site for effective Project implementation.
This being considered as a critical function in the organization, the organization considers this role as a service role making things happen for organization to realize the capacity targets it has visualized for itself over the time horizon.
------------------------------------------------
Position : Manager - Planning Scheduling and Coordination
Level : Middle / Junior
Location : Head Office (Hyderabad), Warora & Bikaner
No. of Positions : 3
Your Role : Middle Management /Junior Management Planning
The requirement of planning and monitoring will be as indicated above areas but sufficiently in detail in the respective area of posting that is - Site execution of construction /erection activities or at head office for the activities of Engineering /Contracting & Procurement areas /Activities of obtaining “Permits and License” etc.,.
The adoption of work breakdown structures, the preparation of Level 2 and 3 schedules, weightage allocation, resource planning, manpower histogram, monitoring of construction work would be of relevance Ability to plan the resource requirements, resource mobilization and demobilization and liaison with all Engineers and monitoring the progress, taking corrective, augmenting the sources will also be equally relevant. Similarly in the areas of Engineering and Expediting the detail understanding of the Engineering /manufacturing assembly process would be relevance for effective planning, monitoring and control.
He will provide all the required support to the Project Head at site / General Manager / Head Office Management as necessary. His reporting head will be based on location of posting.
Your Skills
The exposure to areas of Engineering /contacting ,procurement and expediting / site execution and the thorough knowledge of the process to be available for aiding the skills of realistic planning and provide alternate sequences for project target realization .
Should be Computer literate conversant with latest tools in Planning & Scheduling like Primavera, PS8, MS Project and should be able to work on various planning and scheduling packages.
Should be able to proactively identify key areas of concern and take corrective measures. Also should have full knowledge of progress reporting of various types of works and highlight key hold ups to client in time.
Excellent man management, people leadership, communication skills.
Your Background
Graduate Engineer in Mechanical/Electrical Engineering with Post Graduate Degree /Diploma in Business Management
With Experience of 5 to 15+ years of which a Minimum 3- 5 Years in directly Planning and Scheduling and Monitoring field .Candidate should have experience in work breakdown structures, weightage allocation, resource planning, manpower histogram, monitoring of construction work and be able to independently prepare activity wise Level-1, II, III schedules.
Candidates will be considered for Senior/Middle/Junior positions based on their experience.
He will be fully knowledgeable of Process sequence / sequence of construction / erection / process etc., He will be fully knowledgeable of Process sequence / sequence of construction / erection / process etc., He will be fully knowledgeable of Process sequence / sequence of construction / erection / process etc.,
Balance years may be in other areas of direct Project Execution /Project Engineering /Project Contracting / procurement / Project Coordination which will enhance the planning process making it more realistic and effective .
Remuneration : Commensurate with experience and qualification
Contact Information : careers@ksk.co.in
-
May 25th, 2009, 04:01 PM
Post Count Number #2
Re: KSK Energy Ventures Ltd. : Warora Maharashtra , Champa CG, Hyderabad : Career
R E S U M E
Name : Prashant.Jaiswal
Email : jaiprashant2007@rediffmail.com
Myself :
I am a person with positive attitude, comprehensive problem solving abilities, excellent verbal & written communication skills , leadership, who works whole-heartedly in each & every activity taken up & there by achieves excellence. I consider myself as a good team player having asserts of intellectual knowledge, emotional capital and sociability.
Career Objective :
To be a part of an Organization that gives me challenges and opportunities to learn and update my knowledge and skills. To be a part of a team that dynamically works towards the growth of the Organization.
Work Experience :
1). BIRLA CEMENT Ltd. CHITTORGARH (RAJ.) From 1999 to 2007
2). Murli Industries Ltd. (CEMENT UNIT), CHANDRAPUR, (MS) Working as Shift. Chemist from 17 July 2007 to Present in project for 3.0 MTA capacity plant.
Expertise & Proficiency :
- Raw Mix Design
- Limestone and Coal pile Preparation
- Calibration & Operation of XRF (Phillips Minipal-4 & Bruker S4 Pioneer)
- Calibration & Operation of Flame Photometer
- Calibration & Operation of Blaine Apparatus
- Chemical analtsis of various raw materials (LImestones,Bauxite,Blue Dust,Laterite,Shale,Coal Ash,Fly Ash,Gypsum,Clinker)& finished product (OPC,PPC)
- Using of Instruments like UV Spectrophotometer, Flame Photometer, Gas Analyzer. X-ray analysers.
- Knowledge of using Pollution Control equipment like Stake Monitoring Kit, High volume Sampler etc.
- Testing of Raw materials, Semi-finished, Finished products in Cement plant by traditional methods.
- Knowledge of using Techometer, Pyrometer for checking temperature of radiation, different types of Monometers.
- Knowledge of using Pitot tubes, Ventury meters for determination of Velocity of Air at different points.
- Knowledge of different calculations for Screw conveyors, Belt conveyors, Elevators, Kiln, Mills, Jaw Crusher, Hammer Mill, Air slides, Aeration & Blending (Pneumatic), Air lift pumps etc.
- Knowledge of computer operation, MS office (Excel, Word, Power-Point), Internet .Knowledge of using Math Cad , Design Cad softwares.
Academic Qualification :
- B.Sc. from Nagpur University in the year 1994 securing 59.33% with Chemistry, Physics and Mathematics as main subject.
Personal Data :
Date of Birth : 22/05/1973
Sex : Male
Marital Status : Married
E-mail ID : jaiprashant2007@rediffmail.com
Languages known : English, Hindi, & Marathi
Interest & Activity : Making friends, Playing Cricket, Music,
Place : CHANDRAPUR
( Prashant. s. Jaiswal)
SIGNATURE
-
November 28th, 2011, 03:05 PM
Post Count Number #3
Mangesh R. Sontakke
Email Id : mangeshsontakke23 AT gmail.com
Specialization : MBA
Major : Financial management
Minor : Marketing management
OBJECTIVE :
“Want to grow in the organization both professionally and as an individual, to attain highest level of self-satisfaction and motivation”
QUALIFICATION :
M.B.A.(4th sem) 2011 P.R.Patil college of Management Amravati Amravati University 54.50 %
EDUCATION :
YEAR OF PASSING COLLEGE/SCHOOL UNIVERSITY/BOARD PERCENTAGE :
S.S.C 2001 Karmaveer vidhyalaya, Chandrapur. Nagpur University 48.93 %
H.S.S.C (Commerce) 2003 Dr. babasaheb Ambedkar college chandrapur. Nagpur University 48.83 %
B.COM 2009 A.C.S College, chandrapur. Nagpur Board 41.72 %
M.B.A.(1ST Sem) 2010 P.R.Patil college of Management Amravati Amravati University 56.83 %
M.B.A.(2ND Sem 2010 P.R.Patil college of Management Amravati Amravati University 55.66 %
M.B.A.(3RD Sem) 2011 P.R.Patil college of Management Amravati Amravati University Appear
PROJECT :
College Name : P.R .Patil college of Management Amravati
Project Name : A study of loan products available in nationalized bank for development farmers in Amravati city.
Duration : 3 month’s
COMPUTER-SKILL :
Packages Known : Ms Office,D.T.P, TALLY.
Work experience :
- As a Data entry operator in bank of India (2 years)
-
July 7th, 2012, 02:56 PM
Post Count Number #4
Resume
CURRICULUM VITAE
CHETAN N. CHOUDHARI
Email ID :chetanchoudhari123 AT gmail.com
OBJECTIVE :
To reach a challenging position in an esteemed organization where my potential & technical skills get excelled and lead to success in every phase of Company Development.
EDUCATION :
Examination College-University Year of Passing Percentage
Semester 8th RTM Nagpur 2012 69.47
Semester 7th RTM Nagpur 2011 76.72
Semester 6th RTM Nagpur 2011 70.00
Semester 5th RTM Nagpur 2010 62.61
Semester 4th RTM Nagpur 2010 65.16
Semester 3rd RTM Nagpur 2009 59.53
First year RTM Nagpur 2009 57.20
HSC MS-Board 2008 54.33
SSC MS-Board 2005 63.86
DEGREE :- 70.00% AGGREGATE:- 65.00%
COMPUTER LITRECY :
Operating system : Windows 98/xp/vista/7
Languages : C.
Packages : Office 2003,07 etc.
PROJECT DETAILS :
Title :- Power Saving of Street Light Using IR Sensor And LDR
Member :- 5
Application & Description :- The main aim of the project is Automatic street power saving system with LDR and IR SENSOR by using Microcontroller, this is to save the power..
TITLES AND AWARD RECEIVED :
Held winner position in National Level Technical Event at Blitzkrieg in year 2011
And University Topper (1st RANK ) in CE (Communication electronics).
TRAINING :
I have done Internship Training at DMIETR in ‘MSME MANAGERIAL EXCELLINCE GOVT. OF INDIA’.
EXTRA CURRICULAR ACTIVITIES :
- Present a paper in “INTERNATIONAL CONFERENCE” at Agnihotri Collage of Engineering Wardha in Feb. 2012.
- Participated in Roborace in “Aayam” at Jaipur (Raj.)
STRENGTH :
- Ability to work alone.
- Hardworking.
- Quick learner
HOBBIES :
- Listening music
- Playing volleyball
- Reading Novel
Date :-
Place : -
Chetan N.Choudhari
-
June 14th, 2013, 09:52 PM
Post Count Number #5
CURRICULUM VITAE
Curriculum Vitae
Name :-GIREESH KUMAR HANUMARA
E-mail id :-hgireeshkumar.147 AT gmail.com
Objective :
To work in a healthy, innovative and challenging environment extracting the best out of me, which is conducive to learn and grow at professional as well as personal level thereby directing my future endeavors as an asset to the organization.
Academic Qualification :
Academic Qualification Institute/ University Year of Passing CGPA :
Graduation DRK Institute of Science and technology 2012 59.25
12th Chaithanya 2007 94.1
10th Kumar Public School 2005 84.16
Other Computer Proficiency :
** Operating Systems : DOS, WINDOWS :
** Programming Languages : C,JAVA 1.7,.NET4.0
** Tools : MS OFFICE
Summer Internship and Working Projects
** MINI PROJECT PROFILE :
** INTERFACING GRAPHIC LCD TO FPGA
** PROJECT DESCRIPTION :
** Hear Graphic LCD controller is used to control the display and refresh operation of LCDs.
** This design illustrates the implementation of a 2.8” TFT LCD controller using FPGAs.
** As a controller, the FPGA generates all the required interfacing signals and implements the functions that are required for such a system.
** MAIN PROJECT PROFILE :
** Title : POWER MANAGEMENT SYSTEM FOR HIWAYS WITH VEHICLE ARRIVAL BASED LAMP CONTROLLING
** PROJECT DESCRIPTION :
** The main aim of this project is to develop a system to manage the power for hi-ways.
** Here we are using PIR and LDR Sensor for controlling. PIR is used for Human Detection and LDR is used for light intensity. As soon as the human is detected the power is on and off when he moves away.
** The micro controller is interfaced with PIR Sensor and LDR with 555 timer and the devices are on and off using relays when human is detected.
** LCD displays whether the human is detected or the device is on or off
** Power supply is 5v or 12v given by power supply unit by 7805 regulators and power supply unit.
Extra Curricular Activities and Achievements :
** Stood school second in s.s.c Board Examination.
** Stood class first in INTER MEDIATE Examination.
** Participated in essay writing and got first prize.
** Organizer for VLSI WORKSHOP in ILLUMINATI 2K10
Personal Information :
Hobbies : Listening Music, Surfing, solving mathematical puzzles.
D.O.B : 13th September 1989.
Gender : Male.
Languages Known : English, Telugu, Hindi.
Email :hgireeshkumar.147 AT gmail.com
hgireeshkumar.147 AT outlook.com
I hereby declare that the above written particulars are true and correct to the best of my knowledge and belief.
GIREESH KUMAR .H
-
June 16th, 2013, 06:20 PM
Post Count Number #6
KRISTAPATI HARISH
harishk.sharma13 AT gmail.com
Objective :
I am seeking a position in a core company where I can develop and excel , doing best to the organisation.
Educational Quallifications :
Name of the school/College Board Course Percentage / cgpa Year of passing
SCSVMV University, Kancheepuram SCSVMV BE EEE 8.61 2013
NARAYANA(P.R.Reddy) Junior College , Anantapur Board Of Intermediate Education , A.P
12th class 86.8 2009 The Aditya Birla Public School, Kurnool
CBSE 10th class 87.9 2007
Inplant Training Undergone :
Elecrical Design Course,Dhanush Enterprises from May 21,2013
Understanding Thermal Power Plant , UltraTech Cements,Tadipatri
Overall Process Of Thermal Power Plant,Rayalaseema Thermal Power Plant,Kadapa
Computer Proficiency :
Basic knowledge on Ms office
Basic knowledge on Mi power, Magnet,PSCAD softwares
Basic knowledge on C , C++
Extra-curricular Activities :
Learnt and practised Flute for 1year
Was awarded as “Best Flutist ” in school band team
Philately
Personal Details :
Date of Birth : 13/03/1992
Languages Known : Telugu,English,Hindi
-
July 15th, 2013, 10:26 PM
Post Count Number #7
RESUME
Mayur Choudhary
E-mail –c.mayur91 AT gmail.com
Career Objective :
To contribute towards the growth of any organization where I work through the application of my technical skills and other significant talents, all the while enhancing and updating my knowledge with the dynamically changing world.
Academic Qualifications :
S.No Qualification Name of Institute University/Board Year Percentage
1. BE (Branch Electrical & Electronics) SDITS, Khandwa (M.P) Rajiv Gandhi Technical University 200913 74.34
2. 12th Examination School For H.S. School Nepanagar M.P. Board 2009 66.2
3. 10th Examination School For H.S. School Nepanagar M.P. Board 2007 66.2
Major Training :
Organization Name : 400/220 Kv Substation of Power Grid Corporation of India Limited,KHANDWA (M.P)
Duration : 2 Weeks
Technologies /Tools : Power Transmission.
Key Learning : In Major training I learn basic knowledge Power Transmission line.
Projects Undertaken :
MAJOR PROJECT :
Title : Simultion of Multipules AC-DC Convter for Medium Voltage ADS’s.
Team Size : 3 Members
Duration : 3 Months
Description : In this project we reduces the Harmonice by transformer phase Shifted.
Learnt Skills : Team Work.
MINOR PROJECT :
Title : Speed Control of DC Moter Using for PWM.
Team Size : 3 Members
Duration : 2 Months
Description : In this project we avoid use Vairabel Resistance by speed control of PWM.
Learnt Skills : Team Work.
Computer Proficiency :
Well acquainted with basic computer applications.
Basic knowledge of MATLAB.
Achievements & Extra Curricular Activities :
No.
Personal Details :
Name :Mayur Choudhary
Date of Birth :17thDec,1991
Father’s Name :Mr.Santosh Choudhary
Languages Known :Hindi, English.
Hobbies and Interests : Listening to songs & Playing Cricate.
Strength :Good Grasping power, Positive Attitude, Team Worker. Weakness xxxxxxxxxxxxxxxxxx Permanent Address At Post Siwal The. Nepanagar Dist Buranpure (M.P.) Permanent contact No. +91-7898844684
Declaration :-
I hereby declare that the information given above is true to best of my knowledge.
Place :Khandwa
Date
-
August 10th, 2013, 11:16 AM
Post Count Number #8
CURRICULAM VITAE
CURRICULAM VITAE
DEVENDRA CHOUHAN
Email : devendra.chauhan81 AT gmail.com
Career Objective :
A highly talented, professional and dedicated Civil Engineer with over Nine years experience in Sr.Project Engineer (planning&billing) and directing the construction and maintenance of roads, bridges and building work. I am seeking to take up a managerial position in the field of Civil Engineering and take on challenging, creative and diversified projects.
Employment History :
Feb 2011 – present : Sr. Project Engineer(Planning & Billing)
Kaybee Construction & Engineers Pvt. Ltd (Mumbai)
- Responsibilities :
Knowledge of understanding contract work-orders and contractual correspondence related to the Project..
Estimating the Quantities for Earth work, RCC works and all internal and external finishing works as per drawings.
Comparing the estimated quantities with BOQ and preparing variations.
Collecting quotations from Sub Contractors.
Preparing the Comparative Statements for Sub Contractors work with help of equations.
Preparing the work orders for Sub Contractors based on the comparative Statements.
Deliver risk assessments, technical files and other technical documentation required by safety legislation and procedures.
Allocate work to other members of team in order to ensure delivery of design to quality, time and budget.
Select and strategize allocation of work to sub-contractors.
Supervise technicians, technologists and other engineers and review and approve designs, calculations and cost estimates.
Act as project or site supervison for land survey and construction work.
Oct 2010 – Jan 2011 : Sr.Engineer
Mata Kanyaka Infrastructure Pvt. Ltd Nagpur
- Responsibilities :
Preparation of construction schedule including the requirement of manpower, materials and machinery to meet the schedule.
Overall site supervision of various works including foundation and superstructures.
Analysis of tender documents and preparation of Estimates.
Preparation of Bill of quantities, Abstract and evaluation of work undergone.
Site survey and measurement of works executed.
Execution of construction activities as per schedule.
Assuring of technical perfection in every stage of construction at site.
Advised on procurement, manufacture, assembly, construction techniques, and sequencing of works as appropriate.
Maintained contact with civil engineering to ensure an up to date knowledge of materials and techniques.
Assisted Production Integrators with planning activities.
Supported Suppliers, by making buildability a primary consideration in design.
Carried out pavement condition inspections and reporting.
Jan 2008 – Sep 2010 : Field Engineer
Arctech Consultant Pvt. Ltd Kolkota
- Responsibilities :
Responsible for collecting all information from site Engineers, MEP Engineer & Architects.
Coordinating with Procurement Department for Material purchasing & Submittals as per Project Specifications and drawings.
Attending weekly & monthly progress meetings
Set the ordinates for the structural & architectural drawings for execution of work at site
Preparation of shop drawings for windows, doors and glazing works
Attending co-ordination meeting with project managers and concerned engineers and report to the company management
Assist in surveying work needed for design and construction of public works projects.
Performed field checks of project sites or survey areas to verify survey results or features.
Coordinated public works engineering activities with private engineering firms, developers, vendors, and the public.
Provided information and respond to complaints and concerns from the public.
Assisted in the development of revised design and construction standards for public works structures and appurtenances.
Prepared Bills and reports.
Researched publications and industry information sources.
Maintained and updated Pavement Management System including distress surveys on site.
July 2005 – Dec 2007 : Project Engineer
Rai Singh & Company, Balaghat (m.p)
- Responsibilities :
Started out as Site engineer responsible for documents and assisting senior engineers and promoted to Project engineer after two projects
General site supervision duties for development of Roads & commercial apartment blocks including carparks and other public facilities.
Education / Qualifications :
Master Degree in Commerce (Private) Graduated 2006 Dr. Hari singh Gour University Sagar (MP)
Diploma in Civil Engineer Graduated 2005 Rajiv Gandhi Prodhyogiki Vishwvidylaya Bhopall
Skills :
Name Proficiency :
Post Graduation Diploma in Computer Application Advanced
Tally in Accounts Advanced
Hobbies / Interests :
Playing Football ,& Cricket. Reading books.
Pesonal Details :
Name : Devendra Chouham
Date of birth : 28th august 1981
Father’s name : Shri Govind Singh Chouhan
Category : General
Nationality : Indian
Martial status : Married
Sex : Male
Declaration :
I here by declare that all above information is true & correct to the best of my knowledge & belief.
Date :
Place :
Signature
Devendra Chouhan
-
July 30th, 2014, 11:41 AM
Post Count Number #9
Whether any opening is available for fresh mechanical graduate engineers?