-
October 26th, 2010, 12:53 PM
Post Count Number #1
SURVEYOR Ahmedabad : Sadbhav Engineering Ltd
No. DESIGNATION REQUIREMENT (Vacancy):
ASST MATERIAL ENGINEER - 2
CONST MGR(HIGHWAY) SR. HIGHWAY ENGINEER - 3
ASST / JR HIGHWAY ENGINEER - 3
SR. SURVEYOR - 4
SURVEYOR - 8
MECHNICAL ENGINEER - 2
ADMINSTRATION OFFICER - 1
PUBLIC RELATION OFFICER - 1
SAFETY OFFICER / ENGINEER (HSE) - 1
SR QUANTITY SURVEYOR - 1
CAD ENGINEER - 1
SR. CONTRACT SPECIALIST - 1
About Us:
“Our strengths today have enabled us to develop a track outstanding execution capabilities and position us as a leading infrastructure and construction company of choice.” Sadbhav Engineering Limited, incorporated in 1988 as a private company in the State of Gujarat, by Shri Vishnubhai M. Patel, having rich experience in construction field since 1968, took over the running business of M/s Bhavna Construction Co. w.e.f. 1st October 1989. At sadbhav, we converged our focus on the roads, mining and irrigation sector. We aggressively participate in the BOT opportunity in the road sector. We chose to adopt an integrated approach of developing & constructing road projects. Interestingly we believe in minimal sub-contracting. In the past one year we were awarded three BOT projects in consortium. The focus to not participate in equity but also execute a significant portion of the EPC (engineering, procurement and construction) contracts. It has also been awarded the Certificate of Excellence in Productivity, Quality, Innovation & Management by the Institute of Economic Studies, New Delhi.
Contact Us:
Sadbhav Engineering Limited
Sadbhav House,
Opposite Law Garden Police Chowki,
Ellisbridge,
Ahmedabad 380 006
Gujarat State
Click to Apply : http://www.sadbhaveng.com/Career1.htm
Website : http://www.sadbhaveng.com
Last edited by muthukalee; October 21st, 2011 at 05:03 PM.
-
May 3rd, 2011, 12:59 PM
Post Count Number #2
IJT addict
Brijesh kumar soni
brijesh753 AT gmail.com
Objective and Education :
Seeking a position to utilize my skills and abilities in the mechanical engg that offers Professional growth while being resourceful, innovative and flexible.
2007-11 Rungta College of Engineering and Technology, Bhilai, C.G. 69% B.E. (Mechanical)
2006 Saraswati shishu Mandir H.S. School, lormi, Bilaspur, C.G.. 70.4% Class XII
2004 Saraswati shishu Mandir H.S. School, lormi, Bilaspur, C.G. 82% Class X
Skills :
Modeling Autocad, Pro/E with Authorised Certification.
OS Windows 2000/XP
Others Microsoft Office, Adobe Acrobat, Adobe Photoshop
Vocational Training :
7 week Industrial visiting at NTPC Pvt Ltd. May-June 2009
is the largest state-owned power generating company in India. Forbes Global 2000 for 2009 ranked it 317th [3] in the world. It is an Indian public sector company listed on the Bombay Stock Exchange although at present the Government of India holds 84.5%(after divestment the stake by Indian government on 19october2009) of its equity
4 week Industrial visiting at Bhilai Steel Plant june2010
This steel plant was set up with the help of the USSR. Nine - time winner of Prime Minister's Trophy for best Integrated Steel Plant in the country. The plant is the sole supplier of the country's longest rail tracks of 260 metres. With an annual production capacity of 3.153 MT of saleable steel, the plant also specializes in other products such as wire rods and merchant products.
Projects :
Generation compressive residual stress on hard ball impacting on metallic component
A very effective technique for improving component fatigue strength is to modify the near surface component stress by shot peening. Shot peening is used in numerous engineering applications. It is a cold-work process in which a stream of tiny shots (0.2–2 mm) is blasted against an engineering component. Each shot impacts on the target surface, causing plastic deformation
Extra - Curricular Activities :
- Member of CRC (Campus Recruitment Council)
- Team sub leader of last year Projects
- Cleared written exam of Airforce and called for SSB interviews.for 2 times
- State level paper presentation on ADVANCED SUSPENSION SYSTEM
- Participated in AUTOCAD competition held at NIT, raipur
- Member of ISTE student chapter
Other Information :
- I am conversant with English, Hindi, and Chhattisgarhi
- Familiar with computer
- My hobbies include Biking, pencil art, Wandering new places and solving the Sudoku,Crossword
-
November 16th, 2011, 11:44 PM
Post Count Number #3
Resume for the administration department
Darshan Thakar
E –mail : Darshan.Thakar81 AT yahoo.com
OBJECTIVE :
“Obtain a position as a team-player in a people-oriented organization where I can maximize my experience in a challenging environment to achieve the corporate goals.”
PROFESSIONAL EXPERIENCE :
I have been associated with Vodafone Rajasthan process as a Team Coach from 24 April 2008 on Azure Payroll.
Current Job Profile :
- Team Handling with 22 Members.
- Maintaining performance reports & feedbacks
- Team meetings, sharing experience.
- Motivating them to bring out the best with prizes, contest, Day celebrating,
- Doing Team Efforts on floor & outing program, sharing thoughts and do fun in breaks.
- Performance Management : Individual performance tracker, Spoc responsibilities, trainings, contest, briefings, Service Level & effective break management are my skills and initiatives.
- Reports & Documentation : Maintain a record of performance through critical incident reports, collecting data including work records, reports, and input from others familiar with the staff members.
- Asset Management : By maintaining Company’s assets with documentation to obtain the highest returns at the lowest possible cost.
Achievements :
During my Tenure of 44 months, 22 team members from my team moved to the other LOB’s
Like Pre- Gold, Postpaid, Trade, Chordiant desk and Gprs desk. 3 Team Members of my team
Who were promoted to next level as a Team Coach.
- I was rewarded with “BEST TEAM COACH” trophy for the month of June ’09.
- Individual TOP GUN winner for the month of August’09 and October’09.
- Organized RPL Cricket tournament for Rajasthan Process in the April’10
- Awarded with the Star of the Month for the month of March’11 in Rajasthan Process.
- Achieved 2nd Position for Lowest Tagging Fetal Error Contest in the month of Sep’11 initiated by Circle Team.
Experience Summery :
2) Company : Mphasis bpo- Ahmedabad
Job Profile : In Airtel-Gujarat as a S.M.E & Training co-ordinator.
Period : from 27 September ‘05 to 23rd April 08.
1) Company : iCall India pvt ltd - Ahmedabad
Job Profile : In Bsnl-Gujarat as a Sr Customer Service Executive.
Period : 23 march’04 to 23 Oct‘05.
EDUCATION :
- Graduate in commerce April-2003 from Shree V.Z.Patel commerce college, S.P.University at Anand.
COMPUTER SKILL
MS office, Internet & Tally
-
April 15th, 2013, 10:14 AM
Post Count Number #4
SIR,
MY NAME IS SESHU BABU IAM CIVIL ENGINEER WITH OVER 17 YEARS OF EXP IN INDIA AND ABROAD PRESENTLY IAM WORKING IN SRK PROJECTS WANT TO RELOCATE.I SAW YOYR ADVERTISEMENT AND WANT TO BE ONE OF THE CANDIDATE IN YOUR COMPANY HERE WITH IAM SENDING MY RESUME FOR YOUR REFERENCE AND YOUR NECESSARY ACTION PLEASE
THANKING YOU SIR
YOURS SINCERELY,
SSESHU BABU
CURRICULUM VITAE
SURNEEDI SESHU BABU shubabusurneedi AT yahoo.co.in seshu_bb AT rediffmail.com
CARRIER OBJECTIVE :
To work for growth of organization to secure the key position of management by excellent leadership skill, innovative technology, meticulous planning, and completion of project as per schedule and team work.
EDUCATION QUALIFICATION : 1) B.Tech in Civil Engineering(2011)
(RVD UNIVERCITY)
2) Diploma in Civil Engineering from(1994)
ANDHRA POLITECHNIC
PERSONAL INFORMATION
NAME : SURNEEDI SESHU BABU
FATHER’S NAME S. Sri Hari Rao
DATE OF BIRTH : 04 April 1971
MARITAL STATUS : MARRIED
LANGUAGES KNOWN : ENGLISH, HINDI & TELUGU
WORK EXPERIENCE : 17+ years in the Highways & Other Civil Works.
IN INDIA : 12+ years
IN ABROAD : 5+ years
SPECIALISED FIELDS : Construction of Highways & CIVIL WORKS .as per
MORTH &B.S specifications
MAIN JOB PROFILE :
1) Execution of various types of Foundations like bored cast-in-situ Piles (Marine & Land), Pile caps, Sub-structures, Minor bridges, Box culverts, slab culverts, HP culverts, Underpass, Retaining walls, covered drainages, RE walls, water Pipe lines and water tanks capacity 3MMIG,excution of construction activities in mini substation.
2) Execution of various items involved in Highway construction like Earthwork, Soil stabilization Sub-Base & Base Course, Bituminous Courses, PQC, DLC, Protection work & Road junctions, safety norms in road construction any other duties as directed by the Management from time to time. Preparation of subcontractor bills, Reconciliation of Materials
WORKING EXPERIENCE :
PRESENT ASSIGNMENT : Working as a D.P.M in SRK projects Pvt Ltd
PROJECT : Construction of 2 lane NH-59 road in state of Arunacal
Pradesh Package 1 and 4(Total 23 k.m)
PERIOD OF WORKING : From Dec 2012 to till date
CLIENT : NATIONAL HIGHWAY AUTHARITY
CONSULTANT : P.W.D
PREVIOUS ASSIGNMENTS :
1) EMPLOYER : AGRI GOLD PROJECTS PVT ltd
POSITION : Construction Manager
PERIOD OF WORKING : From MAY 2010 to Nov 2012
CLIENT : Punjab infrastructure board
CONSULTANT : SMEC
PROJECT : Up grading of Southern By pass Road & Canal lining in
Ludhiana Total 23 Kms
2) EMPLOYER : National united Engineering & Contracting Trading
L.L.C OMAN
PERIOD OF WORKING : From Dec 2008 to Apr 2010
POSITION : Senior Eng
PROJECT : Construction of road to tourist spot in Muqual
CLIENT : M.R.M OMAN
CONSULTANT : National Engineering Office & partners
3) EMPLOYER : Galfar Al Misnad W.l.l Qatar
POSITION : Civil Engineer
PROJECT : Design and construction of potable water storage Tanks of 3
MMG capacity ,internal roads, and pipeline laying
PERIOD OF WORKING : Sep’ 2006 to Oct 2008
CLIENT : Qatar Petroleum
CONSULTANT : Rambel International Ltd.
4) EMPLOYER : Khalid Bin Ahmed& Sons LLC Oman
POSITION : SITE ENGINEER
PROJECT : Design and construction of road from AL – Lehban to
Khant, construction of Alkhud INTER change in Muscat,
Internal roads in Royal Camp
PERIOD OF WORKING : From Aug’ 2003 to July’ 2006
CLIENT : Ministry of Transport and Communications Oman
CONSULTANT : Renardet SA & Partners & Parsons International
5) EMPLOYER : M/S Dodsal pvt ltd
POSITION : Site Engineer.
PROJECT : The work involves strengthening and upgrading of existing 2 lanes to 4 leans of NH-8 for a length 79.6km. The work involves construction of Toll Plaza, with PQC, Major & minor Bridges
PERIOD OF WORKING : From Feb2001to AUG 2003
CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA
CONSULTANT : CES India Ltd. With ASSIEATION OF BECOM
6) EMPLOYER : M/s BSC-RBM-PATI (JV), HYDERABAD
POSITION : Site Engineer
PERIOD OF WORKING : From Dec’ 1999 to Jan’ 2001
CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA
CONSULTANT : SMEC INTERNATIONAL PVT. Ltd
PROJECT : Four lining of NH-8 from Gurgaon in Haryana (Km 36.630)
to Kotputli in Rajasthan (Km 162.50) The work involves construction of two new lanes and strengthening of existing two lanes of NH-8 for a length of 125Km. The work involves one ‘Rail over Bridge’ with reinforced earth structure and several minor bridges and culverts. Total cost of project is approximately 310 crores.
7) EMPLOYER : M/s Srisaila Constructions, Vishakapatnam
CONSULTANTS : Karnataka Electricity Board, NTPC (Tamilnadu)
PERIOD OF WORKING : From Jun 1997 to Nov’1999
POSITION : SITE ENGINEER
RESPONSIBILITY : Execution of piling work from boring to pile cap concrete
for both land piles & marine piles, conducting SPT test, pile load tests
08) EMPLOYER : M/s C.D Constructions Pvt Ltd., Vishakapatnam
POSITION : Jr Civil Engineer
CLIENT : BHARATH PETROLIUM CORPAREATION LTD
CONSULTANT : Rashtriya Paroyog Nirman Nigam
PERIOD OF WORKING : June1996 to june1997
RESPONSIBILITY : Supervision of bored cast-incite piles maintaining the
bore log, pile cape concreting
09) EMPLOYER : CHITHANYASRAVANTHI(N.G.O), Vishakapatnam
POSITION : Civil supervisor
PERIOD OF WORKING : June1994 to June1996
RESPONSIBILITY : Design & construction of check dams
COMPUTER PROFICIENCY : MS office, Primavera .
Place: Kakinada
Date:03 /03/2013
Yours faithfully
(SURNEEDI SESHU BABU)
-
May 24th, 2013, 10:33 AM
Post Count Number #5
surveyor job
I have 3 years experience. I want surveyor job.
-
April 19th, 2017, 02:08 PM
Post Count Number #6
RESUME
Proposed Position : Survey Engineer
Name of Personnel : Kalpesh Ravajibhai patel
Date of Birth : 30th September 1983
Nationality : Indian
Education Qualification :
ITI in Surveying 1999, Gandhinagar, Gujarat
Computer Aided Civil & surveyor
Membership of Professional Associations :
NILL
Training undertaking :
Auto cad, Calquan
Publication :
NILL
Employment Record :
From September 2008 to till date
Employer : Egis Bceom International S. A.
Position held : Sr. Surveyor
From July 2006 to August 2008
Employer : Ranjit-Tarmat(JV)
Position held : Sr. Surveyor
From March 2005 to July 2006
Employer : Universal Engineering & Consultancy Services (Jaipur)
Position held : Sr. Surveyor
From November 2002 to March 2005
Employer : Ranjit-Gaytri (JV)
Position held : Surveyor
From June 2000 to November 2002
Employer : SAI Consulting Engineers Pvt. Ltd.
Position held : Surveyor
From January 2000 to June 2000
Employer : Earth Survey Engineers
Position held : Surveyor 8.0
List of Projects on which the Personnel has worked :
February 2012 to till date :
Egis Bceom International S. A.
Survey Engineer
Six Laning of Existing Three Lanes For Bagodara-Wataman-Tarapur-Vasad Road, SH-8, on BOT (VGF) Basis, Project Length : 101.900 kms, 0+000 to 101+900.
Project Detail : Construction of Additional Three Lane for Bagodara-Wataman-Tarapur-Vasad Road to make it Six Lane Divided
Carriageway Facility under Viability Gap Funding Scheme of Government of India on Build, Operate and Transfer (BOT) basis.
Duration : 6th Feb. 2012 to till date
Client : Gujarat State Road Development
Concessionaire : GVK Bagodara Vasad Express Way Private Limited
Independent Engineer : Egis Bceom International S. A.
Location : Anand (gujarat, India)
Project Cost : INR 1109.883 Crore
As Survey Engineer, was responsible for checking of Alignment as per the Drawings, routine TBM checking, topographical survey for
verifying ROW in the JMS sheet with GPS, checking and verification of various encumbrances and land issues, checking the levels for
various layers (OGL, Embankment, Sub-grade, GSB, WMM, BM, DBM & BC), Median and Kerb alignment checking, Drain layout, Junction layout, Bus bay layout,
Structure layout and alignment checking and Toll plaza layout checking.
September 2009 to till date :
Egis Bceom International S. A.
Survey Engineer
Four Laning of Ahmedabad-Viramgam-Maliya Road on BOT (VGF) Basis, Project Length : 183.565 kms, 11+500 to 195+065.
Project Detail : Construction of Additional Two Lane for Ahmedabad Viramgam Maliya Road to make it Four Lane Divided Carriageway
Facility under Viability Gap Funding Scheme of Government of India on Build, Operate and Transfer (BOT) basis.
Duration : September 2009 to till date
Client : Gujarat State Road Development
Concessionaire : L&T Ahmedabad-Maliya-TollwayLimited.
Independent Engineer : Egis Bceom International S. A.
Location : Ahmedabad, India
Project Cost : INR 1015.36 Crore
As Survey Engineer, was responsible for checking of Alignment as per the Drawings, routine TBM checking, topographical survey for
verifying ROW in the JMS sheet with GPS, checking and verification of various encumbrances and land issues, checking the levels for
various layers (OGL, Embankment, Sub-grade, GSB, WMM, BM, DBM & BC), Median and Kerb alignment checking, Drain layout,
Junction layout, Bus bay layout, Structure layout and alignment checking and Toll plaza layout checking.
September 2008 to September 2009 :
Egis Bceom International S. A.
Survey Engineer
Punjab State Road Sector Project Consultancy Services for Quality Assurance and Technical Support for Package II (Phase I) Part B, Project Length : 361.70 kms, 9+000 to 46+970,0+00 to 33+600, 1+000 to 29+550 Lane, Funded by: World bank Condition of Contract: - ,
Project Detail :
(i) PSRSP/WB/RH/2/NCB KM-9+000 TO 46+970 Project Cost 44 Crores
(ii) PSRSP/WB/RH/3/NCB KM-0+000 TO 33+600 Project Cost 47 Crores
(iii) PSRSP/WB/RH/6/NCB KM-1+000 TO 29+550 Project Cost 25 Crores
Duration : September 2008 to till date
Client : PWD B&R, Punjab, Governor of Punjab
Location : Punjab, India
As Survey Engineer, was responsible for PWD
July 2006 to August 2008 :
Ranjit-Tarmat(JV)
Sr. Surveyor
National Highway Project (RJ-III, E.W.Corridor- II) NH-76. Gogunda to Udaipur (KM 32), Chainage (73000- 104.724), Project Length : 32 kms, 73+000 to 104+724 Lane, Funded by: NHAI Condition of Contract: - ,
Project Detail : NHAI Rj-3 km-73+000 TO 104+724
Duration : November 2005 to August 2008
Client : National Highway Authority of India.
Location : Rajasthan, India
Project Cost: INR 208 Crore
As Survey Engineer, was responsible for fixing bridge alignment approaches, pier and abutments, leveling work, detailed survey
work by using Total Station, Traversing, Fixing of Alignment, Taking levels for fixing T.B.M. Longitudinal section and Cross sections, Earthwork Calculation. Fixing the R.O.W. for roads, traffic survey. Also responsible for setting out curves & layout of structures, management of field staff, responsible for execution of the various survey activities regarding Earthwork, Subgrade, GSB, WMM, DBM, BC work and preparation of tolerance sheets.
March 2005 to July 2006 :
Universal Engineering & Consultancy Services (Jaipur)
Sr. Surveyor
Four laning of Pune-Ahmednagar Road, Section Shirur-Ahmednagar (SH-60 from Km.64+000 to Km.120+400) in the state of Maharastra, Contact Package No. BOT-01, Project Length: 56.400 kms, 4 Lane, Funded by: BOT Condition of Contract: - ,
Duration : March 1985 to November 2005
Client : Chetak Enterprises / Govt. of Maharastra PWD
Location : Maharastra, India
Estimated Escalated Project Cost: Rs. 126Crores
As Head Surveyor, was responsible for Looking after the Survey work with Advance Total Station Topography Survey, Plot Demarcation, Survey involved in inventory for topographical Survey and Demarcation, fixing of proposed CL on ground, Making of Longitudinal section and Cross sections, Bench Mark fixing and data collection of site, Establishing RLs.
November 2002 to March 2005 :
Ranjit-Gaytri (JV)
Surveyor
Construction of four laning Udaipur-Gandhinagar road project of Golden Quadrilateral on NH-8, Contact Package UG-II (Km.340+000 to Km.396+00) in the state of Rajasthan, Project Length: 56 kms, 4 Lane, Funded by: NHAI, Condition of Contract: - ,
Duration : November 2002 to March 2005
Client : National Highway Authority of India
Location : Rajasthan, India
Estimated Escalated Project Cost: Rs. 120Crores
As Survey Engineer, was responsible for fixing bridge alignment approaches, pier and abutments, leveling work. involved in inventory for roads and CD work, Alignment traverse, fixing of proposed CL on ground, Making of Longitudinal section and Cross sections, Calculation, Bench Mark fixing and data collection of site, Establishing RLs.
June 2000 to November 2002 :
SAI Consulting Engineers Pvt.Ltd
Surveyor
Bagodara to Bhavanagar SH-1, DPR WARKS
Bhuj to Bhachau SH-36, DPR WARKS
Nakhatrana to Panandaro SH- 42, DPR WARKS
Duration : November 2002 to March 2005
Client : PWD
Location : Gujarat, India
Estimated Escalated Project Cost: Rs. 100Crores
As Survey Engineer, was responsible for fixing bridge alignment approaches, pier and abutments, leveling work. involved in inventory for roads and CD work, Alignment traverse, fixing of proposed CL on ground, Making of Longitudinal section and Cross sections, Calculation, Bench Mark fixing and data collection of site, Establishing RLs.
January 2000 to June 2000 :
Earth Survey Engineers
Surveyor
Town Planning Ahemadabad City
Ahemadabad Municipal Corporation
Duration : January 2000 to June 2000
Client : AMC
Location : Gujarat, India
Estimated Escalated Project Cost: Rs. 10 Crores
As Survey Engineer, was responsible for
Details of the current assignment and the time duration for which services are required for the current assignment.
Mr. Kalpesh Ravajibhai patel (Mobile No. 09998673783,09998722162) is currently working on “Construction of Additional Three Lane
for Bagodara-Wataman-Tarapur-Vasad Road to make it Six Lane Divided Carriageway Facility under Viability Gap Funding Scheme of
Government of India on Build, Operate and Transfer (BOT) basis. He will be available from 8th FEB, 2012.
CERTIFICATION:
I am willing to work on the Project and I will be available for entire duration of the Project assignment as required.
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications and my
experience.