TVS Srichakra Ltd Chennai : Mechanical Maintenance Engineer

+ Ask Question / Post resume
Results 1 to 6 of 6
  1. Post Count Number #1
    Veteren
    Join Date
    September 23rd, 2010
    Location
    Tuticorin
    Posts
    928

    TVS Srichakra Ltd Chennai : Mechanical Maintenance Engineer

    Functional Area: Manufacturing

    Position Title AM - Mech Maintenance

    Area / Section Manufacturing / Plant Engineering

    No. of Positions 1

    Education BE(Mech)

    Experience(Yrs) 6 - 8

    Age(Yrs) 30 to 32

    Competencies required knowledge of tire industry m/cs production, TPM,ISO, Production systems

    Broad R & R Responsible for day to b/ds, TBM planning and execution,, defect reduction, conrtolling maint. cost, adhering schedules, ensuring safety procedures and improving employee morale.

    Possible CTC/M 25 K

    Additional information
    Tire plant experience must and must be conversant with all tire plant m/cs including mixing, knowledge of English must.

    Executive Manpower Requirements for Uttarakhand Unit of TVS Srichakra Limited ,
    Send your resume to harig@tvstyres.com

    About us:
    TVS Srichakra is one of the leading two and three wheeler tyre manufacturer in India rolling out over 11 million tyres per annum. Part of US $ 2.2 billion largest Auto Ancillary group TVS, founded by Sri. T.V.Sundaram Iyengar, TVS Tyres lives upto the rich heritage and strong value system of the parent company. Incorporated in 1982, the company manufactures a complete range of Two and Three wheeler Tyres and Tubes for the domestic market and Industrial Pneumatic tyres, Farm & Implements Tyres, Skid steer tyres, Multipurpose tyres, Floatation tyres etc. for the export market, at its state-of-art manufacturing facility at Madurai in Tamil Nadu. Spread over an area of 2.5 lakhs sq. mts, the manufacturing unit at Madurai employs over 2000 people.

    Contact Us
    TVS Srichakra Ltd.
    Sudarsan Bldg. 5th Fl.,
    14 Whites Rd.,
    Chennai, 600 014, India
    Tel 91 044 2852 6007,
    fax, 91 044 2852 2992
    http://www.tvstyres.com

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    CURRICULUM VITAE
    Kotresh H. M. J Correspondence Address
    M: 9480143977 S/O Jadeiah H.M
    E-Mail: hmj.kotresh AT gmail.com Warkar street behind
    Kalamma temple
    Koppal – 583231
    Karnataka

    CAREER OBJECTIVE
    To work in an organization where i have opportunities for growth, to improve my technical and management skills and aid the organization i work for, in its success and producing innovative yet practical solutions to challenging problems.

    EDUCATIONAL DETAILS
    - BE (Mechanical Engineering) from Bellari institute of technology and managament Bellary (Formerly Bellary Engg College), affiliated to V.T.U. Belgaum completed in the year 2009 with aggregate of 70.85%.
    - PUC from H. M. Ishwaran science PU college, Dharwad affiliated to Karnataka Pre-University educational Board completed in the year 2005 with aggregate of 65.66%.
    - SSLC from S. V. E. M High school. Koppal, affiliated to K S E E B completed in the year 2003 with 67.52%.

    TECHNICAL SKILLS
    Programming Languages : ‘ C ’ and Basics of Computer ( MS-Office)
    Modeling Software’s : Solid Edge
    Analysis Software : ANSYS
    Operating System : Windows 98/2000/ XP.

    PROJECT UNDERTAKEN
    Project name : Influence of liquid environments on fracture toughness
    of GFRP composites .
    Raw materials used : Epoxy, glass fiber mat, hardener, mould release
    Team size : 4
    Duration : 6 months

    Description
    The main objective of this experimental analysis is to know the fracture toughness of GFRP composites subjected to different environment conditions for different crack length using single edge notched tension test.
    It has wide range of applications related to marine, aerospace, aircraft, electrical and civil infrastructures.
    The future scope of project, it is aid of highly sophisticated equipment, the analysis of matrix cracking at the interface can be performed.

    Seminar name : Impact properties of high temperature fiber metal laminates.

    STRENGTHS
    Self-motivated, regulated, innovative ideas, hard work, quality, timeliness of service, independent problem solving attitude, and honoring the commitment with high sense of team spirit.

    KEY SKILLS
    - Quick Learner.
    - Good Aptitude and Good Logical Reasoning.
    - Good Verbal and Non Verbal skills.
    - Decision Maker.
    - Can Work Efficiently and Even Under Pressure.
    - Team Worker.

    PERSONAL DETAILS
    Name Kotresh H.M.J
    Date of Birth 16-09-1986
    Sex Male
    Father's name Jadeiah H.M
    Languages Known English, Hindi, Kannada, Telugu
    Nationality Indian
    Hobbies Playing cricket, volley ball,window games,Watching T .V.
    Permanent Address S/o Jadeiah H.M.
    Warkar street behind kalamma temple
    Koppal.
    Pin code:583231
    Contact number +919480143977

    DECLARATION
    I hereby declare that the above statements are true and complete to the best of my knowledge and belief. I also declare that I am a citizen of Indian by birth.

    Yours sincerely,
    Kotresh H.M.J

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    KRISHNAN RAMARENGANATHAN
    Summary of experience
    Worked as a installation and commissioning engineer of boiler, BOP, rotary and static mechanical equipments, bunker, piping etc and all the power plant equipments. Working till date also as an installation, commissioning, operation and maintenance engineer for the past 6 years in the power sector with a core field of mechanical engineering. I am an effective team leader and a team member of the projects. All the mechanical activities handled with the help of Boiler Regulations and other related plant installation procedures.SOFTWARES
    Used AUTOCAD, PRO-ENGINEERetc. Theoritical concepts like Material mettalurgy, welding concepts, Basic Electrical and Instrumentation engineering etc, with drawing knowledge.

    Summary of technical experience
    Operating systems : MS windows XP AND VISTA
    Theoretical procedures : manpower management, estimating and costing
    Project scheduling, mathematical calcualtions
    Tools : welding knowledge, process planning,
    Drawing reading knowledge
    Additional skills used : AUTOCAD, PRO-E, MS office for data management
    System, MS PRIMVERA e tc
    WALCHAND NAGAR INDUSTRIES LTD OCT2010- till date
    Project name :M/s CHEYYAR CO-OP SUGAR MILLS, TNEB PROJECT
    Power Plant capacity : 15 MW PROJECT TRAVELLING GRATE EPC PROJECT

    Designation : SITE ERECTION AND COMMISIONING MANAGER
    POSITION HELD : MANAGER (ERECTION AND SERVICES)
    May2010- till date
    - Worked as on-site Manager for fabrication ,erection of pressure parts and Non-pressure parts installation engineer
    - Aiding client for the project execution and satisfying them with good quality.
    - Be part of the Product support and quality contol team.
    - Team work co-ordination and invoice accounting with clients and other vendors
    - NDT, Pressure parts, non pressure parts, piping welding knowledge, etc,
    - Budget preparation, cost, time schedule estimation for project completion
    - Project scheduling L1, L2,L3 and upto L4 with client.
    - Preparing QAP and PQR documents.
    - Conducting review meeting and kickoff meeting with contractors and clients.
    - Document all new and existing processes.
    - Co-ordinate with all project contractors and vendors and also other members in the team.
    - Mentor new team members.
    - Team work co-ordination and invoice accounting with clients and other vendors
    - NDT, Pressure parts, non pressure parts, piping welding knowledge, etc,
    - Budget preparation, cost, time schedule estimation for project completion
    - Co-ordinating ALL civil, electrical,instrumentation activities
    ISGEC JOHN THOMPSON NOIDA
    Project name :M/s SHIRIRAM EPC LTD, HANUMANGARH and NARSHIMPUR
    Power Plant capacity : 10 MW PROJECT TRAVELLING GRATE BOILER

    Designation : SITE ERECTION AND COMMISIONING INCHARGE
    May2010- oct 2010
    - Worked as on-site Incharge for fabrication ,erection of pressure parts and Non-pressure parts installation engineer
    - Aiding client for the project execution and satisfying them with good quality.
    - Be part of the Product support and quality contol team.
    - Team work co-ordination and invoice accounting with clients and other vendors
    - NDT, Pressure parts, non pressure parts, piping welding knowledge, etc,
    - Budget preparation, cost, time schedule estimation for project completion
    - Project scheduling L1, L2,L3 and upto L4 with client.
    - TPM and TQM used.
    Designation : OPERATION AND MAINTAINENCE ENGINEER
    ISGEC JOHN THOMPSON NOIDA
    Project name :M/s BILT POWER LTD PUNE,INDIA
    Power Plant capacity : 2X30 MW PROJECT

    Jan2010 – April 2010
    - Working as an on-site Incharge for fabrication ,erection of pressure parts and Non-pressure parts installation engineer and also plant operation and maintainence engineer.
    - Aiding client for the project execution and satisfying them with good quality.
    - Be part of the Product support and quality contol team.
    - Interact with cient and vendors.
    - Document all new and existing processes.
    - Co-ordinate with all project contractors and vendors and also other members in the team.
    - Mentor new team members.
    - Team work co-ordination and invoice accounting with clients and other vendors
    - NDT, Pressure parts, non pressure parts, piping welding knowledge, etc,
    - Budget preparation, cost, time schedule estimation for project completion
    - Installed more than 50 tons Installation in 1.5 MONTHS.
    - Troubleshooters rectified with unique quality, and performance study done.
    - Scheduled activities completion at the scheduled time.
    - Performance around 85-90%
    - TPM and TQM used.
    - Project scheduling L1, L2,L3 and upto L4 with client.
    - Co-ordinating ALL civil, electrical,instrumentation activities
    Senior Erection and commissioning engineer
    CETHAR VESSELS LTD, TRICHY
    Project name :M/s ORIENT CEMENT LTD,ANDHRAPRADESH ,INDIA
    Power Plant capacity : 50 MW PROJECT
    Designation : senior engineer/ mechanical Incharge

    Jan 2008-Dec 2009
    - Working as an on-site engineer for O& M as well as installation engineer.
    - Aiding client for the project execution and satisfying them with good quality.
    - Be part of the Product support and quality contol team.
    - Interact with cient and vendors.
    - Document all new and existing processes.
    - Co-ordinate with all project contractors and vendors and also other members in the team.
    - Mentor new team members.
    - Team work co-ordination and invoice accounting with clients and other vendors
    - NDT, Pressure parts, non pressure parts, piping welding knowledge, etc,
    - Budget preparation, cost, time schedule estimation for project completion
    - Installed more than 500 tons Installation in 3 MONTHS.
    - Troubleshooters rectified with unique quality, and performance study done.
    - Scheduled activities completion at the scheduled time.
    - Performance around 85-90%
    - TPM and TQM used.
    - Project scheduling L1, L2,L3 and upto L4 with client.
    - Co-ordinating ALL civil, electrical,instrumentation activities
    Duties and responsibilties
    - Worked as a Boiler Incharge and MECHANICAL Incharge of 1X114 TPH CFBC BOILER (Manpower strength=150 nos).
    - Also working as a co-ordinator for steam, feed piping and boiler integral piping.
    - Completed the 440 m3 Coal bunker -4Nos Lime stone bunker 200 m3-2 Nos
    In 6 Months individually in 8 Months in the schedule period (Manpower used-12 Nos)
    - Completed the project in the Committed Schedule and performance of boiler and bunker is 95-100%
    - Engineers team strength= 25Nos.
    - Completed the whole project at the scheduled time.Co-ordinating with other EPC activities of power plant
    - Completed 4 nos of feed pump erection and allignment in 2 months. Maintaining the superior quality of all the installation materials
    - Rotary and static equipment erection
    - Installation and Commissioning of ESP
    - AUTOCAD, ISOMETRIC DRAWING READING KNOWLEDGE.
    - Machining process knowledge.
    - Manpower Management for the manpower control.
    - Total quality Management with the use of all NDT procedures
    - Financial planning done for cost reduction.
    - Piping knowledge.
    - Pressure parts and non pressure parts erection and welding knowledge.
    - Knowledge of welding of all types of materials.
    - Cordinating for the completion of IBR FORMALITIES.
    CETHAR VESSELS LTD, TRICHY
    Project name :M/s MONNET ISPAT AND ENERGY LTD,RAIGARH ,INDIA
    Power Plant capacity : 9O MW PROJECT
    Designation : senior engineer/ boiler erection and Fabrication Incharge

    Mar2006-Jan 2008
    - Working as an on-site engineer for installation of boiler and rotary and static equipments.
    - Aiding client for the project execution and satisfying them with good quality.
    - Be part of the Product support and quality contol team.
    - Interact with cient and vendors.
    - Document all new and existing processes.
    - NDT, Pressure parts, non pressure parts, piping welding knowledge, etc,
    - Budget preparation, cost, time schedule estimation for project completion
    - Worked as a 9 months As a Fabrication Incharge of Structures and Ducts.(Manpower strength=45 nos)
    - In the next 6 months worked as a erection Incharge of 2X10.2 TPH WHRB Boilers which is Completed By MAR 2007(Manpower strength=60 nos) .
    - In the next 6 months worked as a erection Incharge of 2X33.4 TPH WHRB Boilers which is Completed By SEP 2007(Manpower strength=75 nos).
    - In the rest of the months worked as a Erection Incharge 1x120 TPH AFBC Boiler and also as a Total Project Co-ordinator with Completion at MAR 2008. (Manpower strength=100 nos).
    - Total boiler integral and steam piping incharge in the whole project completion time of about 2500m pipe line completed in 8 months includes commisioning. (Manpower strength=50 nos).
    - Engineers Team strength :16 nos.Performance around 85-90%,TPM and TQM used.
    - Project scheduling L1, L2,L3 and upto L4 with client.
    Duties and responsibilties
    - Worked as a Boiler Incharge and MECHANICAL Incharge of 1X120 TPH AFBC ,2X33.4 TPH, 2X 10.2 TPH WHRB BOILER (Manpower strength=150 nos).
    - Also working as a co-ordinator for steam, feed piping and boiler integral piping.
    - Completed the project in the Committed Schedule and performance of boiler and bunker is 95-100%
    - Engineers team strength= 25Nos.
    - Completed the whole project at the scheduled time.Co-ordinating with other EPC activities of power plant
    - Rotary and static equipment erection
    - AUTOCAD, ISOMETRIC DRAWING READING KNOWLEDGE.
    - Machining process knowledge.
    - Manpower Management for the manpower control.
    - Total quality Management with the use of all NDT procedures
    - Financial planning done for cost reduction.
    - Piping knowledge.
    - Pressure parts and non pressure parts erection and welding knowledge.
    - Knowledge of welding of all types of materials.
    - Cordinating for the completion of IBR FORMALITIES.
    Project name :M/s NALWA SPONGE IRON AND POWER LTD,RAIGARH ,INDIA
    Power Plant capacity : 23MW PROJECT
    Designation : Trainee engineer- boiler erection and Fabrication Incharge

    Apr 2005-feb2006
    - Working as an on-site engineer for installation of boiler and rotary and static equipments.
    - Aiding client for the project execution and satisfying them with good quality.
    - Be part of the Product support and quality contol team.
    - Interact with cient and vendors.
    - Document all new and existing processes.
    - Co-ordinate with all project contractors and vendors and also other members in the team.
    - Mentor new team members.
    - Team work co-ordination and invoice accounting with clients and other vendors
    - NDT, Pressure parts, non pressure parts, piping welding knowledge, etc,
    - Budget preparation, cost, time schedule estimation for project completion
    - Worked as a 9 months As a Fabrication Incharge of Structures and Ducts.(Manpower strength=45 nos)
    - In the next 6 months worked as a erection Incharge of 2X10.2 TPH WHRB Boilers which is Completed By MAR 2007(Manpower strength=60 nos) .
    - In the next 6 months worked as a erection Incharge of 2X33.4 TPH WHRB Boilers which is Completed By SEP 2007(Manpower strength=75 nos).
    - In the rest of the months worked as a Erection Incharge 1x120 TPH AFBC Boiler and also as a Total Project Co-ordinator with Completion at MAR 2008. (Manpower strength=100 nos).
    - Total boiler integral and steam piping incharge in the whole project completion time of about 2500m pipe line completed in 8 months includes commisioning. (Manpower strength=50 nos).
    - Engineers Team strength :16 nos.Performance around 85-90%,TPM and TQM used.
    Duties and responsibilties
    - Worked as a BOILER Incharge of 1X85 TPH AFBC BOILER (Manpower strength=80 nos).
    - Also working as a co-ordinator for steam, feed piping and boiler integral piping.
    - Completed the project in the Committed Schedule and performance of boiler and bunker is 95-100%
    - Engineers team strength= 5Nos.
    - Rotary and static equipment erection
    - AUTOCAD, ISOMETRIC DRAWING READING KNOWLEDGE.
    - Machining process knowledge.
    - Manpower Management for the manpower control.
    - Total quality Management with the use of all NDT procedures
    - Financial planning done for cost reduction.
    - Piping knowledge.
    - Pressure parts and non pressure parts erection and welding knowledge.
    - Knowledge of welding of all types of materials.
    - Cordinating for the completion of IBR FORMALITIES.
    PLACE OF TRAINING : ENNORE THERMAL POWER STATION, CHENNAI
    ROLE: Trainee for exposure of power plant
    PERIOD : 1-OCT 2003 TO 22-NOV-2003
    DUTIES AND RESPONSIBILITIES :
    1. Worked as a Maintenance Engineer in the 125MW SHUT DOWN Power plant for a month of time.
    2. Controlled the total team of ENNORE THERMAL POWER STATION Of Boiler Maintenance having team strength of 20 persons.
    3. Exposure of operation of power plant especially boiler and turbine has been trained.
    4. Good team management skills improved.
    MINI PROJECTS EXPERINCE:
    PLACE OF TRAINING : 3CTECHNOLOGIES
    TITLE : DESIGN OF JIGS AND FIXTURES (PRO-E Modelling and Simulation)
    Company : LMW Ltd.
    PERIOD : JUN 2003 TO DEC 2003
    DETAILS OF PROJECT

    1. Worked as a design engineer for designing Jigs and Fixtures for Automatic Machining Accuracy, Reduction of Scrap, reducing Cost of Work Pieces Done. 2.
    2. Total team Capacity :6 nos
    3. Customer requirement completed and executed.
    Software Used : PRO-E WILDFIRE, AUTOCAD2004
    FINAL YEAR PROJECT
    ROLE : EXECUTION ENGINEER
    TITLE: FEATURE EXTRACTION
    PERIOD : MAY 2004 –APRIL 2005
    DETAILS OF PROJECT
    1. Worked as a Project leader for Executing the Project By “ Integrating Process Planning and Design In Manufacturing Industry.
    2. To make easiest a product for process planning engineer against the design.
    3. It is the live project under progress in japan for reducing the production time of a product.
    ACHIEVEMENT: Declared as the best Project in the Department. It is also given as the best project Team in the Final year project.
    SOFTWARE USED : AUTOCAD 2004 AND C PROGRAMMING.
    EDUCATIONAL QUALIFICATION
    - SECONDARY SCHOOL EDUCATION Completed in Sethu Lakshmi Bai School (1999) With 81.6%.
    - HIGHER SECONDARY SCHOOL EDUCATION Completed in Sethu Lakshmi Bai School (1999-2001) With 88.98%.
    - B.E. in PRODUCTION ENGINEERING (2001-2005) IN Government College Of Technology with 75.04%.
    SOFTWARE EXPOSURE:
    Application software : PRO-E WILD FIRE, AUTOCAD2004
    Programming languages : Basics in C,C ++ and visual basic

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    K.KALAIVANAN
    E-Mail : Mech_kalai1984 AT yahoo.com.Phone
    Maintenance Team Leader with a reputed organisation in Automobile, and Mechanical Engineering Sectors.
    SYNOPSIS
    - A result oriented professional with around 5 .8years of experience in Maintenance and, Process Improvements.
    - Previously associated with Visteon Automotive System India Pvt.Ltd Chennai. As Team member technician.
    - Presently associated with Visteon Automotive Systems India Pvt.Ltd Pune. As Team leader.
    - Expertise in Trouble Shooting, M/c Breakdowns, planning and scheduling Preventive Maintenance without affecting the production requirements.
    JOB PROFILE
    - Preparation of Preventive Maintenance Check sheet & Schedule.
    - Preparation of Predictive Maintenance schedule & Check sheet.
    - Daily Report Updating.
    - Break down Memo, History card, BD history Updating.
    - BD Analysis & ICA/ PCA Implementation.
    - Preventive & Predictive Maintenance Adherence & record Updating.
    - Spares Management.
    - Material follow-up with supplier.
    - New project Handling & assist to supplier.
    - Responsible for Breakdown & preventive maintenance Automation system.
    - Responsible for Breakdown & preventive maintenance of Injection moulding m/c.
    - Responsible for Breakdown & preventive maintenance of Paint shop.
    - Training to team members & assist them.
    - Daily Review with Engineer.
    - Preparation for internal & External Audits.
    - Why Why Analysis updating for B/D & Implementing PCA.
    PROFESSIONAL EXPERIENCE
    Since june to Aug 2006 Visteon Automotive System India .Pvt .Ltd Chennai.
    Company Profile :
    Visteon located in Maraimalainagar, Chennai. It’s a global group of company.
    Plant involved in manufacturing of Plastic parts for car interior & exterior.
    Its major customers TOYATO,HYUNDAI ,FORD,GM. The company is ISO 9000-2000 and 14001 certified. TPM & KAIZEN are also practiced in plant. It is TS 16949 certified.
    Job Responsibilities :
    - Developing the new products process.
    - Making Control plans for new Products by using Auto Cad.
    - Making work instructions for new products.
    - Making trails on machines for new development products.
    - Preparing documents for TS16949.
    NOVEMBER 2006 to till date Visteon Automotive Systems India Pvt.Ltd, Pune.
    Company Profile :

    Visteon located in Hinjewadi, Pune. It’s a global group of company.
    Plant involved in manufacturing of Plastic parts for car interior & exterior.
    Its major customers M&M, TATA Motors, VW, Mahindra Renault. The company is QS-9000, ISO 14001 & ISO 18001 certified. TPM & KAIZEN are also practiced in plant. It is TS 16949 certified.

    Hands on Experience :
    - New project Handling.
    - Maintenance of Moulding Machines from 530 Ton to 2800Ton.
    - Maintenance of Moulding M/c Robots.
    - Maintenance of EOT Cranes.
    - Maintenance of air compressor.
    - Maintenance of moulding accessories Like HRS, Dehumidifier, MTC Etc.
    - Maintenance of paint shop over all system.
    - Installation & commissioning of moulding M/C.
    - Maintenance of Dash Board Welding SPM M/C.
    - Maintenance of SPM Welding Robot.
    - Maintenance of conveyor system.
    - Maintenance of cooling tower, chillers system.
    ACHIVEMENTS
    - Active team member in Installation of 2800T Injection Moulding machine.
    - Active team member in Installation of 1800T Injection Moulding machine.
    - Active team member in Installation of Xylo Dash board assembly line.
    - Installed Dash board welding machines.
    - Active team member in Installation of Volkswagen dash board assembly line.
    - Active team member in Installation of Mahindra door trim (W408)
    - Active team member for Plant Expansion activities
    ACADEMIA
    YEAR EDUCATION INSTITUTION PRECENTILE & GRADES
    2005 DIPLOMA IN MECHANICAL ENGINEERING MANALI RAMAKRISHNA POLITECHNIC. 79 % (First class with honours)
    2003 SCHOOL SECONDARY LEAVING CERTIFICATE ST ALOYSIUS HIGHER SECONDARY SCHOOL 71,.8 %
    2001 HIGHER SECONDARY SCHOOL ST ALOYSIUS HIGHER SECONDARY SCHOOL 60.16%

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Application for the post of mechanical maintenance engineer

    India

    Dear Sir/Ma'am ,

    This letter is to express my interest in the position for mechanical maintenance engineer listed on your web. Based on my skills in mechanical and marine field, I am confident that I would be a great addition to your team.

    My resume that highlights my ability/knowledge/expertise in engineering&maintenance of machineries in marine field is enclosed. During my time at Fleet management Limited, I was able to succeed/save money/save time/work safely in ships.

    I am excited about the position and the ability to help your company succeed. Thank you in advance for your time. Please do not hesitate to contact me if you have any questions. I would appreciate the opportunity to review my qualifications in more detail when ever required.

    Sincerely,

    Prashaanth

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    RESUME

    RESUME
    S.GURUMOORTHY
    EMAIL : guru.sethuram18 AT gmail.com
    Objective
    To work in competitive and challenging environment, so as to contribute the best of my ability towards the growth of the organization.
    Academic Qualification
    Course Institution Year Completed
    1. S.S.L.C (64.6%) G.R.V Hr.School Mayiladumparai 2005-2006
    2. D.M.E (Diploma in Mechanical Engineering)(69.3%)
    GMS.MAVMM Polytechnic College, Madurai.
    2006-2009
    Work Experience
    JOB PROFILE ; MECHANICAL MAINTENANCE
    COMPANY ; AQUASUB ENGINEERING UNIT-IV
    COIMBATORE.
    DESIGNATION : TRAINEE
    DURATION ; JUN ‘2009 to JULY ‘2011 ( 2 YEARS)
    SALARY : 8000/- PM

    Skill set - Technical
    - Performed facilites maintenance & major / minor repairs on hydraulic control system & pneumatic control system .
    - Maintenance & trouble shooting of vane & piston & gears pumps in hydraulic system
    - Hydraulic circulit observation
    - Maintenance & trouble shooting of rotary screw type compressor .
    - Maintenance knowledge of cnc machine ( makino , puma hawachin )& wire cut machine
    - Maintenance & trouble shooting in lathe & grinding & drilling & crane & hoist & special purpose machine .
    - Knowledge of all type of gear box – spur gear & helical & worm wheel etc…
    - Knowladge all types of bearing inspeation insatallation & remove of all type bearing
    - Fans & blowers maintenance & trouble shooting
    - User friendly with oil condamination testing , belt tensioning meter , split level , pressure gauge compression testing , load cell tester , viscosity
    - Lubrication of machineries & equipements selection & method of lubrication frequncey , quality , quantity of lubricate to be used .
    - Having experience in general workshop equipment & machinery.
    - Material handling equipments : maintenance & trouble shooting in pallet truck , Hydraulic lifter (2T) , Fork lift (DAWEOO).
    - Cooling tower maintenance
    - Knowledge in welding process
    - Attending installation of the machines & its fabrication & errection work
    - Condition monitoring of equipment & machinery by vibraction , thickness & sound level measurement
    Key area of responsibilities
    - Planning & implementing effective preventive & corrective maintenance schedule.
    - Maintain check list , equipment history cards & preventive maintenance check list & break down analysis.
    - Iso related documentation.
    - Cooradinating with all departments for day to day problem & job planning accordingly.
    - Inventory control of maintenance spares .
    - To be market drain & customer focused.
    - Responsible to safety of people & equipment.
    - Spare sparts management :-
    Through experience of specification , preparation ,procurement & maintaining mechanical spare parts of the section
    . Trained in application of effective communication supervisory development .
    Relating to Skills Improvements :
    - Tpm activity
    - 5s activity
    - Analyzing break down time hours & there corrective action planning
    - why - why analysis
    - kaizen & jeshu hozen progremme
    Other Skills
    - AutoCAD
    - Microsoft Office (Word, Excel, PowerPoint, Access)