    RESUME:
    Name : M.L.N.REDDY
    E-mail: reddymlninfotec AT gmail.com

    Summery:
    I have extended my experience in conversion of Electrical, Civil and Mechanical facilities. I have also associated with preparation of job specifications to achieve high productivity, which provides value for money to the customers. I have acquired many tools and procedure as a Team member to meet first time acceptance by client and meet the Delivery schedules as mutually agreed with the client.

    Education
    :
    Diploma in Mechanical Engineering from State Board of Technical Education and Training, HYDERABAD

    Experience
    :
    Having 11 years experience in CAD/GIS field in various packages like smallworld,microstation,Autocad . I have been working with INFOTECH ENTERPRISES Ltd., HYDERABAD as in the CAD/GIS division

    Software Skills
    :
    Operating Systems : MS-DOS 6.2, Windows 98, and Windows NT 4.0
    Cad Packages : Auto Cad 2000, Micro Station 95, Micro Station v8,SE & Gnome 2.1.0.
    GIS Packages : Smallworld 3.2, Smallworld 4.0, Arc FM UT
    Programming languages : C
    Office packages : MS OFFICE 2000

    Job Duties
    :
    I am responsible for :
    Data cleanup and capture as per the project specs and checklist
    Verification of the output vis-ŕ-vis the checklists provided
    Adopting new process strategies to the regular data conversion
    Responsible for quality and productivity of my team.

    COUNTRIES VISITED :
    NEWZEALAND, FOR 6 MONTHS ON TELSTRACLEAR, TELECOM PROJECT.
    AT INFOTECH ENTERPRISES LTD., Hyderabad.

    CURRENT PROJECT
    :
    Projects Details :
    British Telecom, UK : British Telecom, UK is one of the leading providers of telecom services in Europe. BT had a network access strategy to deliver an integrated intelligent physical inventory system. The goal was to achieve a full ‘end-to-end’ model of network asset connectivity by using an automated planning system. As part of this strategy, the PIPeR (Physical Inventory Planning eRecords) program was initiated to achieve the most cost-effective solution for end-to-end network connectivity. The software used was MicroStation SE.
    my responsibility is to get data conversion of the telecom features as per the project specs and validation of the output as per the checklists.

    Project # 1 : Swisscom, Switzerland
    Software : MicroStation V8 and GE Smallworld PNI
    Role : Team lead
    Duration : 30 Months
    Team Size : 150
    Project Description :
    With revenue of 10 billion Swiss Francs in 2004 and a workforce of 15,000 (approximately), the Swisscom Group is the leading telecom company in Switzerland. As part of continuous endeavors to maintain a high level of quality and customer satisfaction, Swisscom wanted to go in for a new PTA (Project Planning tool for Access Network) system. This system called for data conversion, cleanup, migration, and integration of the existing data to the target system viz. GE Smallworld.

    Project #2 : TELSTRA CLEAR NEWZEALAND (ON-SITE)
    Software : SMALL WORLD 4.0
    Nature : Telecom Network
    Client : TELSTRACLEAR NEWZEALAND
    Duration : 6 Months
    Team Size : 5
    Project Description :
    TELSTRA project dealing with conversion Telecommunication network
    Conversion includes the features like central office or exchange or main distributing frame, primary connection point, secondary connection point, distributing point, network enhancement, cable, duct, joint box, man hole, joint post, pole, joint, change of state. After conversion. A logical connectivity requires to connect splice and to complete circuits

    Project #3 : RWE GAS
    Software : Small world 3.1
    Nature : Gas Network
    Client : WGI. Germany
    Duration : 2 1/2 months
    Team Size : 60
    Project Description :
    RWE Gas is an AM/FM Gas project, which includes the migration of High-pressure lines and Cables with reference to the client provided sources and land base. Queries will be run on the converted data before sending it to the client.
    Role : Team lead

    Project #4 : SWM GAS
    Software : Small world 3.1
    Nature : AM/FM (Gas Network)
    Client : Mettenmeier, Germany
    Duration : 24 months
    Team Size : 5
    Project Description :
    SWM Gas is an AM/FM Gas project which includes the migration of Mains and services according to dimensions with reference to the client provided sources and Landbase.
    Role : Team leader

    Project #5 : FUGRO
    Software : Small world 3.1
    Nature : Electrical & Gas distribution
    Client : Fugro Netherlands.
    Duration : 10 Months
    Team Size : 120
    Project Description :
    FUGRO Gas and Electrical is an AM/FM Gas project which includes the migration of Mains and services according to dimensions with reference to the client provided sources and Land base.
    Role : Worked as Technical analyst in executing the project, like updating of the specifications, simplifying the process queries by interacting to the client and communicating to the entire team the same.
    Role : Team leader

    Project #6 : Key Span Energy
    Software : Exact supported with Microstation 95
    Nature : AM/FM (Electrical Network)
    Client : ASI Inc., USA
    Duration : 12 Months
    Team Size : 60
    Project Description :
    Key Span Energy is an AM/FM project dealing with conversion of primary data and secondary data to the land base received from ASI. The area is subdivided in to shipments. Conversion includes the features like Poles, Fuses, Switches, Transformers, Capacitors, Reclosures, Customer Service Points and Streetlights, moving them to the correct location and capturing primary and secondary /streetlight conductors, service lines and missing devices easements and minor land updations from paper source and Orthos. After conversion the processing need to be done using SQL Database Programs and the data is to be loaded in to the ARCFM. Corresponding DGN, MDB, ExACT reports and Arc reports need to be sent to the client along with Delivery.
    Role : QA & PACKING

    Project #7 : TECHNICAL PUBLICATIONS-2
    Software : AutoCAD 2000
    Nature : AM/FM (Aeronautical)
    Client : Pratt & Whitney, USA
    Duration : 6 Months
    Team size : 75 Members
    Project Description :
    In this Project we should draw mechanical parts (Aeronautical Parts) using AutoCAD 2000 which are given by the client in A4 size sheets and finally we will convert these dwg files into ‘.dg format’ files using Auto-Troll package. We need to digitize main object & different parts of the main object in trimetric view. Client uses these files for desktop publishing on web site.
    Role : Team Leader

    Project #8
    : CENTRAL POWER AND LIGHT
    Software : Exact supported with Microstation 95
    Nature : AM/FM (Electrical)
    Client : Analytical Surveys Inc., USA
    Duration : 8 months
    Team size : 100 Members
    Project Description : This is an AM/FM project which we convert Electrical facilities for USA. In this project we captured OH & UG distribution lines by utilizing client provided sources. We processed all electrical features like Poles, Transformers, Conductors, Fuses, Switches, Bulbs, Pedestals, Open points, Sectionlizers, Capacitors, Reclosers, and Regulators etc.
    Role : Team member

    Project #9
    : PARCEL MAPPING
    Software : AUTO CAD
    Nature : AM/FM
    Duration : 3 months
    Team size : 10 Members
    Project Description : This is an AM/FM project which we convert Paper land base sources to digital source allotting address to parcels.
    Role : Team member

    Project #10 : ENBW
    Software : ARC FM UT & AUTOCAD
    Client : ENBW (GERMANY)
    Duration : 6 months
    Team size : 100 Members
    Project Description : This is an Electrical project which we convert Electrical facilities for ENBW (Germany). In this project we captured OH & UG distribution lines by utilizing client provided sources. We processed all electrical features like Poles, Transformers, Conductors, Fuses, Switches, Pedestals, Open points, Sectionlizers, Capacitors, Reclosers, and Regulators etc.
    Role : QA

    Project #11 : Yorkshire electricity
    Software : Exact supported with Microstation 95
    Nature : AM/FM (Electrical Network)
    Client : INTELIGROUPS;USA
    Duration : 8 Months
    Team Size : 60
    Project Description :
    YORKSHIRE is an AM/FM project dealing with conversion of electrical facilities Conversion includes the features like Poles, Fuses, Switches, Transformers, and Capacitors.
    Role : QA & PACKING

    Project #12 : FLORIDA POWER CORPORATION
    Software : Exact supported with Microstation 95
    Nature : AM/FM (Electrical Network)
    Client : ASI; USA
    Duration : 6 Months
    Team Size : 60
    Project Description :
    FPC is an AM/FM project dealing with conversion of electrical facilities Conversion includes the features like Poles, Fuses, Switches, Transformers, Capacitors, Primary substations, connection points etc.
    Role : Team member

    Project #13 : SASK
    Software : GNome
    Nature : AM/FM (Electrical Network)
    Client : ASI; USA
    Duration : 6 Months
    Team Size : 60
    Project Description :
    Saskatchewan is an AM/FM project dealing with conversion of electrical facilities
    Conversion includes the features like Poles, Fuses, Switches, Transformers, and Capacitors. Primary substations, connection points etc. using customer supported soft ware gnome.
    Role : Team member

    PERSONAL DETAILS :
    Date of Birth : 28-02-1977

    Date : 15 July 08
    Place : Hyderabad (M.L.N.REDDY)

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Resume

    CURRICULUM VITAE:
    P.SARAVANAN

    OBJECTIVE :
    To contribute my technical skills for an organization with good ethical values and Vision.

    EDUCATIONAL QUALIFICATION
    :
    S.S.L.C. Passed in March 1999 with 81% of marks.
    Higher Secondary passed in March 2001 with 63% of marks.
    Diploma in Electronics and Communication Engineering (with 81%) at Meenakshi krishnan polytechnic, pammal, Chennai(2001-2003)
    B.B.A Passed in May 2008 with 52% of marks (Alagappa University)

    SUMMARY OF EXPERIENCE
    : 6 Years 3 months
    Worked as a Cad Draughtsman at Talking Technology, Kilpauk, Chennai – 10 for and behalf of WTI Advanced Technology Ltd (2003-2006)
    Taken directly by WTI Advanced Technology Ltd and Worked for TCS, Chennai as a Assistant Draughtsman (2006-2008)
    Apex knowledge Technology worked as junior Engineer (2008-2008)
    HTC Global Services for 6months as Data Conversion Specialists
    Mahindra satyam Worked as Associate For 21-Jan-2011 to 22-Mar-2011
    Tech Mahindra Worked as Associate For 23-Mar-2011 to 17-May-2011
    (Till Now working)
    Willing to do any hard work for the growth and progress of the company with cordial relationship with all members of the organisation.