-
October 24th, 2010, 08:02 PM
Post Count Number #1
Shift Incharge Mumbai : Vinati Organics Ltd
Position Shift In charge
Qualification Degree / Diploma in Chemical Engineering
Experience 7-12 years in Fine Chemicals / Petro Chemical / Bulk
Drug / Pharmaceutical Industry
Additional Knowledge Working knowledge of computer.
Candidates having exposure of “DCS System” will be preferred.
Age Limit 30-40 years
Location Mumbai
About Us
Vinati Organics Ltd. (VOL) is a specialty chemical company producing organic intermediates, monomers and polymers. It is listed on the Bombay Stock Exchange and has over 300 employees. VOL is the world’s largest manufacturer of Isobutylbenzene (IBB), the basic raw material in manufacture of Ibuprofen, with a capacity of 14,000 TPA. It is also the world’s second largest manufacturer of 2-Acrylamido-2-Methyl Propane Sulfonic Acid (ATBS), with a capacity of 12,000 TPA. M/s. Vinati Organics Ltd. (VOL) is a public limited company, listed with Bombay Stock Exchange. VOL started commercial production at its second unit installed in Lote Parshuram and became the third company in the world to manufacture specialty monomers, 2-Acrylamido 2-methylpropanesulfonic Acid. ATBS is a co-monomer having applications is acrylic fiber, water treatment, emulsions, paints and oil field drilling industries.
VOL's substantial growth is mainly attributed to its efficient manufacturing and sales practices.
Contact us
Vinati Organics Limited
Shiv Ashish Complex, 2nd Floor, Andheri Kurla Road , Saki Naka Mumbai - 400 072, Maharashtra,India
Phone: +(91)-(22)-4201 4444
Fax: +(91)-(22)-28510729 / 42014438
Email: resume@vinatiorganics.com
Website : www.vinatiorganics.com
Last edited by muthukalee; October 25th, 2011 at 12:14 PM.
-
March 13th, 2011, 10:27 PM
Post Count Number #2
Re: Shift Incharge Jobs Mumbai : Vinati Organics
I , m Mr. BALU SUNDER PATIL now working in IOL Chemicals and pharmaceuticals ltd ( IOLCP, Trident)manfacturing Isobutyl Benzene (IBB) from Toluene and Propylene in presence of sodium metal catalyst, (PETROCHEMICAL PLANT)
Qualification: B. Sc.(chemistry)
Total Experience = 18 Years.
I,m sending my resume for PRODUCTION DEPT( OPRATION DEPT). or any suitable post, waiting for your valueble reply.
DCS PLANT.
Thanking You
B. S. PATIL.
-
May 4th, 2011, 03:20 PM
Post Count Number #3
IJT addict
DEBABRATA MONDAL Email ID : dmandal221265@gmail.com and deb2bhalo@yahoo.co.in
Career Highlights
‐ Joined ‘Damodar Valley Corporation’ (DVC) in 01/11/1988 as GET(E) after passing out from BIT, Mesra on BE(Electrical & Electronics).
‐ Served in DVC till 31/07/2010 as Assistant Engineer/ Executive Engineer/Sr. Divisional Engineer/ Superintending Engineer in 3X210 MW Thermal Power Plant in Erection, Commissioning and O&M and in Transmission Line & Substation upto 4ookv level as EPC project.
‐ Joined ‘Kalpataru Power Transmission Ltd.’ as Deputy General Manager – International Project in August 2010 after taking VR from DVC.
‐ Presently posted at Nairobi, Kenya for 400kv TL work after serving two months in Ethiopia.
The Growth Path
Previous Employer: Damodar Valley Corporation from 01-11-1988 to 31-07-2010.
Graduate Engineer Trainee(E) 1988 – 1989 At Chandrapura Thermal Power Plant under Power Engineers Training Society, Durgapur.
Assistant Engineer (E) 1989 – 1995 At Bokaro “B” Thermal Power Plant (3X210MW T.P.S).
i) Erection & Commissioning of 210MW T.P.S unit auxiliaries and 220/132 sw/yd.
ii) O&M of 220/132kv sw-yd and OPH equipments.
Executive Engineer (E) 1995 – 2004 O&M of 3X210MW T.P.S & Transmission System Construction Project work.
Senior Divisional Engineer (E) 2004 – 2006 Project Division: Transmission System Construction of 220/132/33 KV Transmission Lines and substations - complete execution of EPC contracts as Territory In charge.
Divisional In Charge of TSC-II 2006 – 2009 Overall Divisional In-Charge for Construction of 400/220/132/33 KV Transmission Lines & substations and Nodal Officer for 400KV Transmission lines.
Superintending Engineer (E) -2009 As SE(E) & Technical expert for renovation & modification of 132/33kv switch yard.
Present Status: Dy. General Manager – International Projects, Kalpataru Power Transmission Ltd. , Nairobi, Kenya as In-Charge of Erection & Commissioning of 400kv Mombasa –Nairobi Tr. Lines Lot-2. Client: M/s Kenya Electricity Transmission Company (Ketraco), Govt. of Kenya and client’s consultant - M/s Parsons Brinckerhoff. Cost of project: 55million USD approx.
-
July 1st, 2011, 10:38 AM
Post Count Number #4
application for the post of shift incharge
i m anil m mahadik
i hv 13 years experience in chemical industry
i hv sent u resume for the post any suitable
regds
anil mahadik