Instrument Engineer : Resume CV

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Instrument Engineer : Resume CV

    RESUME :
    NAME : Mukundan Narayanan (Mukund)
    DESIGNATION : Lead Instrument and Telecom Engineer
    EXPERIENCE : More than 21 years in Instrument, Control and Telecom
    DATE OF BIRTH : 27 December 1967
    NATIONALITY : Indian
    MARITAL STATUS : Married
    LANGUAGES : English, French, Dutch, Tamil, Hindi

    QUALIFICATION : Bachelor of Engineering - Bharathiar University- India
    MBA - University of Hartford- USA

    PROFESSIONAL : Chartered Engineer with the Indian Institution of Engineers and
    ASSOCIATION Professional Engineer with the Malaysian Institution of Engineers.

    COMPUTER SKILLS : MS-DOS, MS Word, MS Excel, MS Access, Lotus Word, Lotus 123, Lotus Approach. Familiar with sizing programs for Control valves, Pressure relief valves, Flow meters and Restriction Orifice Plates like Instrucalc, Serval and Vendor sizing programs like Fishervue, Masterflo, etc.. Familiar with PLC programming and INTOOLS (SPI).

    SUMMARY OF EXPERIENCE :
    Companies Served :
    - Ranhill Worley Parsons Sdn. Bhd. (Malaysia) – Lead Instrument & Telecom Engineer, Since November 2007
    - MMC Oil and Gas Engineering (Malaysia) – Lead Instrument Engineer / Senior Instrument Engineer, May 2005 to October 2007
    - Best Wide Matrix Sdn. Bhd.(Malaysia) - Senior Instrument Engineer, 2000 to Feb 2005
    - Dorr-Oliver (India) – Senior Instrument Engineer, 1997 - 1999
    - Dorr-Oliver (Netherlands) - Instrument Engineer, 1994-1996
    - Dorr-Oliver (France) - Assistant Engineer, 1990-1993
    General
    - Experienced in Conceptual Design, FEED Design and Detailed Design for new and retrofit projects.
    - Experienced in Greenfield projects, Brownfield projects and EPCC projects.
    - Engineering capabilities include Design basis, specifications, datasheets, Schedules, Technical requisitions, Technical bid evaluation, Vendor data review, Vendor data incorporation, System block diagrams, Logic diagrams, Cause and Effect matrices, Alarm & Trip settings list, Fire and Gas layouts, Telecom layouts, Sizing calculations and Technical Reports.
    - Abilities include Project management, discipline and Inter-discipline documents and drawings review.
    - Conceptual study experience includes Instrument Design Philosophy, Telecom Design Philosophy, Metering Philosophy, Well testing Philosophy, System Philosophy, Field Instrument study, WHCP study and Power consumption, Air/Hydraulic consumption and Heat consumption reports.
    - Specifications experience includes DCS, SDS, FGS, HIPPS, PLC, WHCP, SCADA, RTU, Custody Transfer Metering systems, Instrument Installation and Testing, Instrumentation for Package equipment, Telecom specification with PAGA / PABX / LAN / Radio / VSAT / Troposcatter / CCTV / Entertainment system / Hotline / WMS / IP Telephony and input to mechanical packages i.e. Turbine Compressor, Turbine Generator, etc,.
    - Experienced in projects and client standards of Shell, ConocoPhillips, Petronas, QP, Newfield, ADMA and ExxonMobil.
    - Familiar with International Codes and Standards (ISA, API, NFPA, ASME, NEC, IEC, etc.) and Hazardous area instrumentation (Explosion proof and intrinsically safe). Familiar with Foundation Fieldbus and Profibus.
    - Experienced in Control valve sizing, Relief valve sizing, Flowmeter sizing, Level sketches and Thermowell vibration calculations.
    - Ability to handle, testing and commissioning with FAT and SAT.
    - Participation in HAZOP and SIL reviews.

    POSITION HELD :
    Since November 2007
    RANHILL WORLEY PARSONS SDN. BHD.
    Lead Instrument & Telecom Engineer :
    - Assigned for FEED on EMEPMI Tapis Field Project consisting of a new CPP and conversion of 5 platforms to minimum facility (as satellites).
    - Assigned for EPCM umbrella contract for EMEPMI on Lawit Compressor Restage Project and Jerneh Helifuel Supply Project. Issued datasheets, specifications, Requisitions and Completed TBEs and Vendor data Incorporation.
    - Assigned for FEED verification of ADMA Water Injection Platform. Verified Instrument Air Consumption, Power consumption, Control Room sizes, System specifications, Instrument and Valve specification and Datasheets and Instrument Sizing Calculations.
    - Assigned for INTOOLS management, Actuator study report, Process and F&G matrix of 2 wellhead platforms and one LQ platform for ConocoPhillips Jasmine Project.
    - Assigned for basic engineering on Foroozan project consisting of 3 bridge linked platforms and two production platforms. Covered WHCP specification, mechanical package specification inputs, F&G layouts, F&G CEMs, F&G detectors specification and review of datasheets.
    - Assigned for basic engineering on GU-A Flare boom replacement project consisting of Rupture Pin Relief Valve, Rupture disc, RO’s and Pressure vacuum relief valve. Covered ITB datasheets and drawings.
    - Assigned for pre-FEED design on ZADCO project consisting of additional capacity on 5 WHPs, one PMP and Zirku onshore facility. Covered Level Instrument Selection Report for Three phase Separator, adequacy checks for Flare Ignition Panel, Existing in-line instruments, Control Room and Reports for instrument air consumption, power consumption and motive power calculations.
    - Assigned as Lead Engineer for detailed design on Interfield Pigging and Pipeline Debottlenecking project for Oxy in Qatar. Covered System modification specification, Instrument Specifications, datasheets, Workpacks, Material Requisitions, TBEs, Vendor data review, Vendor data incorporation, CEMs, ESD Relay Box modification, F&G Detector datasheets, IO list, Instrument schedule, Layouts, Wiring drawings and hook up drawings. Instruments included hydraulically operated riser valves, partial stroke testing, remote operated choke valves and other instruments for the pigging and riser facility.
    - Assigned on Pneumatic to Electronic changeover project for Oxy in Qatar. Covered
    Instrument selection philosophy, Changeover methodology and detailed design for the project.
    - Assigned as Lead Engineer on Fire & Gas Integrity restoration project for Sarawak Shell Berhad’s F23 platform. Covers DBM’s and FEED engineering with FGS specification, System block diagrams, Power consumption adequacy check, F&G detector datasheets, FGS IO schedule and drawings.
    - Assigned on South Furious LLP Compressor Project and reviewed Scope of work, datasheets and drawings for new Turbine Compressor interface and additional process equipment.

    May 2005 to October 2007 :
    MMC OIL & GAS ENGINEERING SDN. BHD.
    Lead Instrument Engineer / Senior Instrument Engineer :
    - Assigned as Lead Engineer for Jabung Gas Booster Station Project in Indonesia. Work included specifications, datasheets, drawings, calculations, material requisitions, technical bid evaluation and vendor data review. Engineering completed for Process Control System, Shutdown System, Fire & Gas System, Addressable F&G System, Compressor Performance Monitoring System, Field Instrumentation, Package Instrumentation, Security Management System (CCTV, Fibre optic fence detection, Vehicle and Personnel Entry System), LAN, Weather Monitoring System, PAGA System, PABX System and Mobile Radio System. Participated in Hazop study and SIL study. Responsibility included handling of Solar Turbine Compressor’s Package, Anti-Surge System and Interface. Completed Technical Bid Evaluation for Integrated Control and Safety System and Custody Transfer Metering. Responsible for reviewing discipline and inter-discipline documents, coordination, manhours control, quality monitoring, progress control and reporting. Participated in Hazop, SIL review and SIL study.
    - Completed FEED design for East Belumut-A platform consisting of Gas and Oil Production Wellheads, LP separator, Test separator, Fuel gas treatment, Reciprocating compressors, Gas Metering, Produced water treatment, Fire Water Pump, Diesel Engine Generator, Instrument Air Compressor and Water treatment. Prepared instrument datasheets for packages and non-packages consisting of Displacer level transmitter, Displacer Level switches, Level gauges, Turbine meter, Vortex meter, Flow element, Restriction Orifice Plates and Level sketches. Completed Technical Bid Evaluation for East Belumut-A platform detailed design for Control System, Shutdown System and Wellhead Control Panel. Assisted in TBE for mechanical packages e.g. Instrument Air Compressor & Dryer package, Emergency Diesel Generator package, Fuel gas treatment package, Hypochlorite Generation package, Produced Water System, Test and LP separator package.
    - Assigned as Lead Engineer for conceptual design of Kumang Cluster Field Development consisting of F9KG-A Compression Platform, F9JT-A Wellhead Platform, KAJT-A Wellhead Platform and KUJT-A Wellhead Platform. Issued Design basis memorandum, reports on Field Instrument Selection Study, PMCS/SIS/FGS Study, Instrument gas / Air Study, HIPPS Study, Liquid and Gas Condensate Metering Study, SIL 2 Transmitter Study, Well testing Study, Hydrogen Sulphide Study, Control and Shutdown philosophy and assisted in Turbine Compressor Study and Specifications. Responsible for reviewing discipline and inter-discipline documents, coordination, manhours control, quality monitoring, progress control and reporting.
    - Completed FEED design for Carigali-Triton Bumi, Bulan and Surya Wellhead Platforms in Cakerawala gas field. Prepared specification for Wellhead Control Panel, Sand Monitoring System, Wet Gas Venturi System, Design Basis and General specifications. Involved in Air consumption report, Power consumption report, Fire and Gas Layout and Cause & Effect Matrices. Issued FEED documents for Riser platform Compression Module 3. Prepared Cause & Effect Matrices, Fire & Gas Layouts, Design Basis and System interface block diagrams.
    - Completed Detailed design for Carigali-Triton brownfield modification in Riser platform consisting of Metering skid, Pipeline, Launcher and Receiver instrumentation and DCS/SDS/FGS modifications. Prepared instrument datasheets, Scope of work, Sizing calculations, Cause & Effect Matrices, Fire & Gas Layouts, Site visit report and Hook-up study report.
    - Completed Detailed design for Carigali-Triton brownfield modification in Production platform consisting of CO2 removal system, WHP tie-ins, Fuel gas treatment and Gas treatment facilities. Prepared instrument datasheets, Instrument adequacy checks, Scope of work, Sizing calculations, Cause & Effect Matrices, Fire & Gas Layouts, DCS/SDS/FGS modification write-up, Site visit report and Technical Bid Evaluation.

    August 2000 to Feb 2005 :
    BEST WIDE MATRIX SDN. BHD.
    Senior Instrument Engineer :
    - Assigned as Senior Instrument Engineer on an umbrella contract for Exxon Mobil Exploration and Production Malaysia Incorporated.
    1. Completed Conceptual design for TCOT liquid handling upgrade project involving addition of new condensate pump and modifications for DCS, FGS and SDS. Prepared Design basis memorandum, Block diagrams, System modification requirements, Cost estimates and Cost Time Resource Analysis. Completed detailed design verification of the Condensate Metering upgrade with new meter run and prover for TCOT liquid handling upgrade.
    2. Involved in Conceptual design for Tapis F Host tie-ins at Tapis A & B project involving Pipeline, launcher and receiver instrumentation. Assisted in Design basis memorandum, Block diagrams, Specification for System modification requirements and Microwave Communication modifications, Cost estimates and Cost Time Resource Analysis. Involved in review of specifications for DCS, SDS and FGS modifications & Gas Lift Monitoring during detailed design. Assigned for Technical Bid Evaluation of various field instruments.
    3. Executed Palas A to Guntong D FWS Pipeline Host tie-ins / IBB Host tie-ins at IBA / Angsi Host tie-ins at Tapis Pump / Larut Host tie-ins at Guntong D / Bintang Host tie-ins at Lawit A / Angsi Host tie-ins at Seligi A projects. Involved in detailed design review of specifications for DCS, SDS and FGS modifications, HIPPS system and Metering system. Assigned for Technical Bid Evaluation of System modifications, Slug control valves, Pressure relief valves, Control valves, Choke valves, Water in Oil Monitor, IR Single point gas detectors, other field instruments and Package engineering and Vendor data review of Gas Custody Transfer Metering and GTCP/GTG’s.
    4. Executed IBA Expansion project involving addition of Turbo Compressor, Turbo Generator, Glycol regeneration, Chemical injection system, Fuel gas skid, Seal gas skid, DCS, SDS & FGS. Involved in Vendor data incorporation of TC/TG. Assigned as Package engineer for Fuel gas skid, Seal gas skid and Actuated Ball Valves.
    - Provided bidding assistance for PMCS/ESD/FGS for Thar Jaht Central Processing Facility and Sumandak drilling platform.
    - Provided technical assistance to HL Engineering on Baram South Topsides. Involved in Drawing review, Datasheet review, TBE review and MTO review.
    - Completed the Truck loading system for Petronas Mogas facilities at Pasir Gudang c/w 15 metering lines, turbine meters, PD meters, Digital control valve, Earthing and Overfill protection system, Additive injection system and Master control station c/w Ticket Printing. Loading controlled by Accuload system communicating to master station through RS485.
    - Completed work on Waste Oil to Diesel Conversion Plant with complete Process instrumentation, Control and Detail Engineering. Involved in P&ID review, Hazop study, Instrument Datasheets and specifications. Includes Tank farms, Truck loading and Unloading, Blending, Distillation columns, Coolers, Heaters and Utility systems like Boilers, Fire water, Instrument air and Water treatment.
    - Completed conceptual design for Turbine generator and Turbine compressor Fire suppression system for twelve Exxon Mobil platforms consisting of 64 machines (Solar, Ruston, Kongsberg & Cooper Rolls). Work includes Conceptual design report c/w block diagrams, cost estimates, offshore visits and site survey.
    - Completed skid package for Shell Sarawak’s E11 Instrument air system c/w AB PLC and Chemical Injection system.
    - Completed skid package for Petronas Carigali’s West Natuna Fuel gas system and Instrument air system c/w AB PLC.
    - Upgraded DCS system for the Kapar power plant the biggest in Malaysia consisting of 5000 I/O points, 50 panels complete with database preparation for installation, testing and commissioning of ABB control system.
    - Completed Fuel gas and Seal gas skid for Talisman BR-D project with Allen Bradley SLC500 PLC controls, Heaters, Control valves, Pressure relief valves and CO2 Analyser. Completed Detailed design for PLC including logics, Cause & Effect Matrix, Sizing Calculations and Instrument Datasheets. Participated in hook-up, testing and commissioning.
    - Completed PCSB’s Erb West project Seal gas heater skid with project handling and handling of all instrumentation and electrical work. Completed FAT and SAT.
    - Completed Fuel gas and Seal gas skid packages for Exxon Mobil’s IBA Project. Prepared datasheets for Control valves, Relief valves, Heaters, Transmitters and completed hook-up, testing and commissioning.
    - Involved in detailed design of Diesel supply skid for Shell. Provided datasheet and specification for instruments, PLC and Technical Bid evaluation.
    - Completed Detailed design for Ammonia Piping for Kertih Centralised Tankage Facility (KCTF) Phase 2 project. Provided datasheet for instruments.
    - Completed execution of Project Far East Phase2 for Esterol Sdn. Bhd. involving new Soaping, Blending and Evaporation facility. Prepared instrument datasheets, specification for DCS system, drawings, inspection and site management. Responsibilities included package engineering for Yokogawa CS1000 DCS and Yokogawa PLC systems.

    January 1997 to July 2000
    Dorr-Oliver : (India)
    Senior Instrument Engineer :
    - Carried out Jindal Vijayanagar Steel Plant Expansion Project. Completed Basic Engineering and Detailed Engineering. Issued instrument datasheets and PLC specifications for Chemical and Water treatment facilities.
    - Completed Madras Refineries Limited DHDS Project including Basic and Detailed Engineering involving Panel modifications, Liquid sulphur analysers and other field instruments.
    - Executed Hindustan Petrochemicals Limited Revamping and Expansion project and carried out Basic and Detailed Engineering including Siemens PLC system and field instruments.
    - Completed Indian Petrochemicals Limited Gandhar Project with Basic and Detailed Engineering including DCS systems and Dosing systems.

    January 1994 to December 1996
    Dorr-Oliver :(Netherlands)
    Instrument Engineer :
    - Assigned as design consultants for Blankaart water treatment project in Belgium for Pumping station and Treatment plant involving PLC system and analysers. Issued instrument datasheets, and DCS system specifications.
    - Completed Waprog Fluid Bed denitrification project handling engineering activities involving DCS system, Fluid bed Level measurement and Gas chromatography.
    - Executed FEED project for Zhou-kou starch plant project in China and Julu starch plant project in Phillippines. Issued instrument list, specifications, block diagrams and drawings.
    - Completed Jungbunzlauer starch project in France with Evaporators, driers, Steam reducing station, Solids handling and transportation, Silo measurements, Vibration monitoring and Rosemount RS3 DCS systems. Assigned on engineering activities and commissioning. Issued instrument datasheets and PLC control system specification.
    - Completed EPC activities for Agrana starch project in Austria involving supply of PLC system, control valves, flow, level, temperature and humidity measurements. Issued instrument datasheets and PLC control system specification.
    - Completed Simao project in China with PLC sequence control for Rotary Drum Filters. Issued all instrument datasheets and PLC control system specification.

    January 1990 to December 1993
    Dorr-Oliver : (France)
    Assistant Engineer :
    - Completed Cellulose des Ardennes project engineering and commissioning for Recausticizing plant with PLC sequences and Pressure filter operation.
    - Assigned on engineering and commissioning of Fluid bed calcination plant involving Rosemount RS3 DCS system.
    - Assisted in various techno-commercial activities for marketing and preparation of proposals.

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    MITTAL M. AGRAVAT
    Email : mittal.agravat AT yahoo.co.in

    PROFILE :
    - Bachelor of Instrumentation & Control Engineering from DharmSinh Desai University. , Nadiad in 2007 with Second class.
    - 3 Years and 9 month of Experience in the field of Instrumentation and automation.

    CAREER OBJECTIVE :
    I am looking forward to furnish my carrier in the field of Instrumentation and automation project.

    EDUCATION & QUALIFICATIONS :
    2007 Dharmsinh Desai University BE - Instrumentation & Control with Second class
    2003 Gujarat Higher Secondary Education Board H.S.C with Second Class
    2001 Gujarat Secondary Education Board S.S.C with Distinction

    WORK EXPERIENCE :
    1) Avind Limited (Shirting Division,Santej)
    March 2011 to till date. Engineering Manager
    - Automation and control systems design and development from concept to commissioning including PLC and I/O, Control Panel.
    - Erection, Commissioning, Integration, Programming, Troubleshooting of Various PLCs, Drives. Control Panels used.
    - Doing regular maintenance & Repairing of the various types Plant Instrument in the used.
    - Carrying out modification depending on the analysis of the system with the use of control logic diagram to resolve equipment problems.
    2) M/S Nandan Exim Limited (Chiripal Group of Industries)
    July-2008 to February-2011 Asst Engineer
    3) Inductotherm India Pvt. Ltd.
    July-2007 to July-2008 Graduate Apprentice Engineer

    Company Profile :
    - Engineering Company Engaged with manufacturing of induction furnaces.
    Job Profile :
    - Erection & Commissioning of Induction Furnaces.
    - Installation and Programming of Allen Bradley PLC for controlling of induction furnaces.
    - All fields instrument Erection & Commissioning.

    TRAINNING AND PROJECTS :
    - Torrent Power Plant, Ahmedabad in Instrumentation Department (Duration – 4 Week)
    - Semitronic Pvt Ltd, Gandhinagar in R and D department for Project – “Temperature Controller using fuzzy Logic” (Duration 6 Months).

    PROFESSIONAL INDUSTRIAL AUTOMATION TRAINING :
    Professional Industrial Automation Training at “Nisus Microtech” Containing knowledge of :
    - PLCs
    - Allen Bradley, Delta
    - SCADA
    - Intouch (Invensys) version 9.1,
    Drives
    - AC Drive, DC Drive, Servo Drive
    - Process Instruments for temperature - RTDs, thermocouples, thermistors, flow, level, pressure, PH, Humidity etc. with P&I diagram

    COMPUTER PROFICIENCY :
    o Operating System : Windows 98/XP/2000
    o Office Package : SAP, MS Office 97/2000