QA/QC Welding / Piping Inspector : Resume CV
ZAHEER ABBAS
EMAIL ID : zzaheer_abbas AT rediffmail.com
OBJECTIVE :
A CHALLENGING CAREER AS A QUALITY CONTROL & EXPEDITING PERSON IN THE FILED OF MECHANICAL CONSTRUCTION.
PERSONAL STRENGTH :
To peruse a challenging opportunity and a position in dynamic and well reputed organization that offers good opportunities and challenging work environment in return would help me in building my knowledge, experience and academic capabilities. My experience proves to be my strength, confidence, ability to work hard, learn more strive for achievement and my never sat die attitude with positive outlooks.
SYNOPSIS :
Over 9 years of experience in inspection, testing and QA/QC activities in the oil & gas field familiar with international standards like ASME Section II, V, VIII, IX, B31.3, B31 . Knowledge in welding of various materials like Carbon Steel, Alloy Steel & Stainless Steel. Pressure vessels and exchanger
TECHNICAL QUALIFICATION :
3 years Diploma in Mechanical Engineering from Govt. Polytechnic Bijapur. (Recd. By Government of Karnataka)
NON- DESTRUCTIVE TESTING QUALIFICATION :
Certified as ASNT Level II –in
Ultrasonic Testing Method(UT)
Magnetic Particle Testing Method (MPI)
Penetrate Testing Method ( PI )
Radiography Testing Method ( RT )
Last experience (2 years):
With CCIC (CONSOLIDATED CONTRACTORS COMPANY)
Client : CHIYODA TECHNIP JOINT VENTURE COMPANY( CTJV)
RAS LAFFAN, QATAR.
Project QCS LNG ONSHORE FACILITIES PROJECT ( OATAR GAS)
AREA OF EXPOSURE :
Review of plot, key plan, route, P&ID & isometric drawing
Weld visual inspection.
Review the pre heating, post heating , PWHT procedure
Preparation of WPS.
Witness of Hydro and Pneumatic test.
Witness of PWHT.
Prepare daily fit up and welding inspection report.
Fit up inspection & visual inspection for high pressure piping & critical piping.
Material receiving inspection as per drawing & specification.
Verification & review & approval of quality assurance plans & inspection test plan.
Witness of NDT.
Witness of positive material identification & hardness testing.
Material identification with respect to test certificates & fill up inspection as per given design, drawing & joint design.
Qualifying welders as per ASME section IX.
Familiar about different welding methods (SMAW, GTAW, FCAW, SAW).
Familiar about heating schedule of low hydrogen electrodes.
Familiar about S.S, Alloy steel C.S, LTCS& M.S based material & electrodes.
Prepare & review of test pack & inspection of the piping loops as per Isometrics, check list & issuing punch list.
Monitoring the job according to quality work procedure quality system procedure, quality control procedure & applied international standards & codes.
Running PQR & controlling of PWHT work.
Implementation of QA/QC procedure as per ISO norms & standards
Working Experience : 9 years
1. Organization : M/S B. S. Patil.
Designation : Q C engineer.
Duration : oct 2009 to till date
2. Organization : Consolidated Contracting International Company
QCS LNG Onshore Facilities Project Qatar
Designation : QC-Inspector ( Welding & Piping )
Duration : 15 AUG 2007 to 28 AUG 2009
3. Organization : Forum consulting engineers.
Project : Jamnagar Export Refinery Project
Designation : QA/QC inspector(welding/piping).
Duration : 15.Jan 2005 to July 2007
4. Organization : Ross thermal systems pvt. Ltd.
Designation : Jr.QA/QC engineer.
Duration : Jan 2003 to Dec 2004.
5. Organization : M/S B. S. Patil.
Designation : Site engineer.
Duration : Jan 2000 to Dec 2002.
PERSONNEL INFORMATION :
Date of Birth : 1 June 1978
Nationality : Indian
Marital Status : Married.
February 25th, 2012, 10:15 PM
Post Count Number #2
qc inspector mechanical
RASHEED.B.M
Email : bmrasheedckdy AT gmail.com
OBJECTIVE :
8+ years experience in mechanical construction field as a QA/QC Inspector in Refineries, Gas Plant & Thermal power plants in various projects with various consultants like Eastern Bechtel Co. Ltd. (EBCL), Tecnimont S.p.A, RELIENCE, CHEMTROLS etc in UAE & India.
TECHNICAL QUALIFICATION :
Educational qualification Year of study Name of the institution :
Diploma in Mechanical Engineering 1999- 2002 Govt. Polytechnic Thrissur, Kerala, India
ADDITIONAL TECHNICAL QUALIFICATION :
Certified ASNT Level-II in Non-Destructive Testing as per standard SNT-TC-1A
- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Liquid Penetrant Testing
COMPUTER KNOWLEDGE :
- Operating system : Windows
- Application : MS Word, MS Excel
PROFESSIONAL EXPERIENCE :
1.Organization : KharafiNational, Abudhabi, UAE
An ISO 9001 Company undertaking Electro-mechanical projects in UAE, Egypt,Kuwait etc.
Project : IGD-5 HABSHAN GAS DEVELOPMENT PROJECT HABSHAN ,ABUDHABI
Owner : Abudhabi Gas Industries(GASCO)
Client : Tecnimont S.p.A, Italy
Designation : QC Inspector
Period : 14 August 2010 to onwards
2.Organization : Lahoud Engineering, Dubai, UAE An ISO 9001 Company undertaking Electro-mechanical projects in UAE, Qatar, Oman, Bahrain, Lebanon etc.
Project : BOROUGE 2 Project, Polyolefins units –Ruwais,
Abudhabi
Owner : BOROUGE (Abu Dhabi Polymers Co. Ltd.)
Client : Tecnimout S.p.A ,Italy
Designation : QC Inspector
Period : Dec 2009 to June 2010
Project : OGD III, Habshan, Abu Dhabi.
Owner : Abu Dhabi Gas Industries (GASCO).
Client : Eastern Bechtel Co. Ltd
Designation : QC Inspector
Period : July 2008 to Dec 2009
Job Description :
- Confirmation of incoming material against material certificate and client specification
- Qualification of welding procedures according to different client specification/welding codes (AWS D1.1, ASME IX, API 1104) for different material using different welding processes.
- Inspection of edge preparation & fit up inspection activities against fabrication drawings.
- Familiar with Standards and codes like ASME 31.3,API 1104 ,Section II
- Ensuring the use of proper WPS and Qualified welders for assigned job.
- Day to day welders audit to control heat input, travel speed and proper use welding consumables.
- Visual inspection of completed joints. Dimensional inspection, release for NDT, PWHT.
- Execution of Hardness test after PWHT
- Interpretation of Radiography films as per client specs/codes and review of NDT and PWHT reports.
- Co-ordination with production department for any repair.
- Prepare weld and material traceability
- Review of test packs and clear all the outstanding items prior to hydrotest
- Preparation of punch list and assign the categories for the outstanding items as per the client specification.
- Release the completed spools for hydrotest and co-ordinate with client and witness the hydrotest.
- Attending System Walkdown with client for punchlist clearing using P&ID for mechanical clearance.
- Preparation and maintaining inspection records as per ISO and client specification requirements. .
- Preparation of re-instatement report and ensure all the punch listed items are closed out.
- Preparation of the final documentation dossier as per client requirements.
EXPERIENCE IN INDIA :
1. Organization : CPP JERP RELIANCE, Jamnagar, Gujarat
Designation : QA/QC Engineer
Period : June 2006 to June 2008
2. Organization : MP ENGINEERING CONST., Mumbai, India
Designation : QA/QC Engineer
Period : August 2004 to May 2006
DECLARATION :
I hereby declare that the above mentioned statements are true to best of my knowledge.
RASHEED