October 17th, 2010, 04:50 PM
Post Count Number #1
IJT addict
HVAC Service Engineer : Resume CV
Balathandayuthapani
E-mail : dbalapani AT yahoo.com
QUALIFICATION :
- Diploma in Mechanical Engineering (Air-conditioning) 3 Years with First Class (81%) from Tamil Nadu Board of Technical Education, India.
- S.S.L.C Passed from the Board of Tamil Nadu, India.
Experience :
HVAC Engineer (June 2009 - Present) – East End Barracks Project in Iraq. Prime Projects International LLC, Dubai.
- Reporting to General Manager.
- Detailed Study of Specification, Drawings, Scope of Work & Applicable standards.
- Preparation of Construction Drawings (Shop Drawings) & Submittals..
- Preparation of work Schedule & Mobilization of technicians team at site.
- Estimation of Tools, Hardware and Items to install as per approved Drawings & submittals.
- Sending site materials request to purchase department for Purchase.
- Checking of builders work drawing for the openings.
- Installation of HVAC Equipments, CHW Pipes, Air Ducts and Controls.
- Carry out inspections of equipments and material with consultants..
- Checking the quality of workmanship in installation of equipments, piping and ducting in various stages to ensure that the work is completed with close co-ordination of other services and with given standards.
- Co-ordination with third party Testing & Commissioning contractor to complete the air & water balancing of all HVAC systems in entire project up to the level of consultant approval.
- Floating Inspection Request to client & Consultant.
- Coordination with other MEP Services & Civil construction at site..
- Involved in Preparation of handling over documents with Testing & Commissioning documents, as built drawings and Operation & Maintenance manuals.
- Carry out the Liability Maintenance of all HVAC equipments for the completed projects.
Carry out Testing & Commissioning of all HVAC System:
- Familiar with engineering calculations and processes related to HVAC.
- Formulate method statements, test forms, pre/functional checklist and testing.
- Analyze problems occurring during equipment performance testing.
- Participate in team meeting; Carry out periodic reviews of construction activity; report to Project Manager any variance between the work constructed & the design intent, Present alternative solution if problem arises.
- Preparing handing over documents with Testing & Commissioning documents as built drawing and Operation & Maintenance manuals.
- Carry out the maintenance of all HVAC equipment for the above projects.
HVAC Engineer: (3 years) Jun 2006 - April 2009
Bilt Middle East LLC, Dubai.
- Carrying out design check for ducting and piping shop drawing suit to site condition.
- Preparing of Submittals for Material Approval & Drawing Approval Submittals, Submission and updating it time to time according to the requirement of the client with consultant approval.
- Estimate the qty requirement of Equipment, Accessories & material required for Execute the site.
- Preparation of material requisition with respect to project requirement and follow up with respective suppliers to get the material on time.
- Planning and allotment of manpower for the job in discussion with the project engineer.
- Attend weekly meeting with client and consultants.
- Site progress monitoring and providing reports and allotting manpower as per the site conditions.
- Controlling of material movement.
- Checking the quality of workmanship in installation of equipments, piping and ducting in various stages to ensure that the work is completed with close co ordination of other services and given standards.
- Checking quality of work frequently done by subcontractor.
- Conducting regular meeting with sub contractors maintain the quality of work and checking schedule dates.
- Co ordination with the sub contractors and bill processing cost Evaluation.
- Checking of builders work drawing for the openings.
- Able to carry out installation of split and package units, FCUs/AHUs as per drawing and with the given standards.
Carry out Pre-Commissioning & pre checks of all HVAC System:
- Co Ordination with third party testing & Commissioning contractor to complete the Air & Water balancing of all HVAC systems in entire project Up to the level of consultant approval.
- Co-ordination with the team of building management systems to complete him project.
- Carryout inspections of equipments and material with consultants.
- Preparing handing over documents with Testing & Commissioning documents as built drawing and Operation & Maintenance manuals.
- Carry out the maintenance of all HVAC equipment for the above projects.
HVAC Engineer :(3 years) Jun 2003- May 2006
Nikhil Comforts, Mumbai.
- Site Survey
- Preparation of ducting Estimation, Piping and other HVAC Accessories.
- Material and Manpower Planning.
- Preparation of HVAC Drawing like Duct, chilled water Piping layout grille & diffuser Layout.
- Preparation of As Built Drawings as per actual Site Measurements.
- Approved Getting from Clients
- Preparation of bill of quantity as per site for cost evaluation.
PERSONAL PROFILE :
Date of Birth : 19th February 1982
Sex : Male
Marital Status : Single
Languages Known : English, Hindi, Tamil & Malayalam.
Nationality : Indian
DECLARATION :
I hereby declare that above given information are truths from my best of knowledge.
DATE :
(BALATHANDAYUTHAPANI)
Last edited by Guest-IJT; October 23rd, 2010 at 05:34 PM.
December 9th, 2011, 01:41 PM
Post Count Number #2
Hvac
Farook Shahul Hameed
E-Mail : bfarook95 AT yahoo.com farook0215 AT gmail.com
PROFESSIONAL SUMMARY :
A professional with 9 years experience in HVAC Field
Extensive experience and specialized in :
- Testing & Commissioning of YORK Chillers ( Recip, Screw and Centrif)
- Field Re-assembling of York Chillers ( Recip, Screw and Centrif)
- Overhauling of recip, Compressor
- Training of Subordinates to maintain awareness of new technologies and products.
CAREER HIGHLIGHTS :
October 2009 to Present
Organization : Johnson Controls, Kuwait
Designation : Technician
KEY-RESPONSIBILITIES :
- To conduct Preventive Maintenance in accordance with the YORK Planned Maintenance Program.
- To conduct Testing & Commissioning all type of YORK Chillers
- To Overhaul the Centrifugal Compressors With Under Supervision
- To Troubleshoot and Leading the team.
- To ensure project / maintenance teams are effectively complying with Quality Management Systems and Health, Safety and Environment Systems and encourage them to provide ideas for Quality Management Systems and Health, Saf ety and Environment Systems improvements and liaise QA/QC and HSE Departments.
- To supervises final inspections, testing and commissioning and prepares, issues respective records and reports.
- To develop a professional and open relationship with clients whilst ensuring the interests of the Company are protected and to actively pursue the broadening of client base.
- To maintain awareness of new technologies and products that will increase the efficiency of the department and continuously devise and improve methods to stay ahead of the competition.
April 2002 to May 2006
Organization : Apollo Hospital India Chennai
Designation : Technician
KEY-RESPONSIBILITIES :
- To conduct Preventive Maintenance
- To do all repair & operation of all HVAC works related to different buildings, such as air handling units, fan coil units, chilled water pumps and motor control
- To operate & control all HVAC systems thorough the BMS
- TO Monitor work activity to ensure that correct service staff are correctly assigned and performing their duties
- To Comply with all safety requirements
June 2006 to March 2008
Organization : The World bank, Taramani, Chennai India &
Reliance communications. Chennai India
Designation : Technician
KEY-RESPONSIBILITIES :
- To do all repair & operation of all HVAC works related to different buildings, such as air handling units, fan coil units, chilled water pumps and motor control
- To operate & control all HVAC systems thorough the BMS
- TO Monitor work activity to ensure that correct service staff are correctly assigned and performing their duties
- To Comply with all safety requirements
SKILLS :
- Confident, Innovative, Proactive ,Enthusiastic, Can-do Attitude; Committed, Loyal, Honest & Results Orientated
- Strategic thinker with vision to set direction for new markets
- Highly persuasive, with excellent interpersonal and presentational skills.
- Capable to learn new technology & Implement in a short span of time.
- Careful organizer and planner able to manage and exploit available resources
- Able to work independently, but promote effective team working
- Able to present complex technical information and concepts in business terms
- Hands-on approach, where appropriate, to ensure project delivery
COMPUTER PROFICIENCY :
- OFFICE : MS Word, MS Excel, Visio & Power Point.
- Others : Lotus Notes
ACADEMIC RECORD :
10th AJS High secondary school Chennai
ITI in Air Conditioning & Refrigeration
CRPI Institute Chennai
DISTINCTION & TRAININGS :
- Air Conditioning & Refrigeration Training at YORK Institute.
- EHS Training
EXTRA CURRICULAR ACTIVITIES :
Cricket, Net surfing, Traveling & Reading newspaper.