-
October 14th, 2010, 09:03 PM
Post Count Number #1
Valve Engineer Pune : www.kbl.co.in Kirloskar Brothers Ltd
Position Title /Designation Manager
Position Title Code/ Function/Department/Business
Unit CRED, Cast Steel GGC cell
Location Kondhapuri
Education required for the job : B. Tech / B.E. /M. Tech
Experience required for the job : 10 Years (relevant experience in CS GGC)
PURPOSE OF THE ROLE
The purpose of this role is to:-.
- Be responsible for Design and Development of Cast steel Gate, Globe and Check Valves.
- Be responsible for benchmarking of existing design w.r.t. global competitive market
- Acquiring, upgrading and imbibing the technology.
- Be responsible for internal / external customer interaction for any new developments.
Responsibilities
Initiate and oversee with internal & external customers for getting appropriate inputs/product specifications for valves developments.
- Ensure Timely completion of project and verifying effectiveness of each step during design and development.
- Interface with manufacturing plant for product development.
- Ensure appropriate output of product development as per the customer requirement.
- Product qualifications, Approvals, Certifications as per customer specific / special standard requirements. E.g. seismic, shock, IBR, API Monogram etc.
- Responsible for new product design and optimization. To prepare & finalize design of the product & coordination to establish the desired product performance. To ensure that the internal customers (sectors) are given necessary technical assistance/ training.
- Support to sectors in terms of site visits, to understand/resolve the issue.
- Actively contribute in image building of company through presentations at conferences & to customers for different activities carried out.
- To handle special tenders and enquiries for sectors.
- To prepare marketing leaflets, catalogues, literatures.
- Preparation of monthly reports, AOP, budgets etc as per departmental needs.
- Contribute to product cost estimation.
- Need based support to other valve products.
Company Profile
Kirloskar Brothers Limited (KBL), incorporated in 1920 is the acknowledged leader in fluid handling and largest manufacturer and exporter of pumps in -India and having many prestigious Industrial and infrastructure projects to its credit. KBL is progressing fast to meet the global standards of business. Business areas: Turnkey Fluid-Handling Projects in Irrigation, Power,Process, Water Supply & Sewerage, Turnkey Small Hydel Projects, Protective Surface Coatings
Contact Us:
Kirloskar Brothers Ltd.
Udyog Bhavan,
Tilak Road,
Pune 411 002 ( India)
Tel: +91 20 24440770
E-mail:headoffice@kbl.co.in
http://web.kbl.co.in/
-
August 30th, 2011, 06:35 PM
Post Count Number #2
Prafulla V Dhandare (B.E Mechanical)
Email : prafulladhande6 AT gmail.com
Prafulladhande15 AT yahoo.com
Summary :
- 1.8 years of experience in Design & Development Department in Special Purpose Machine Tools manufacturing firm.
- 4 months of experience in Production planning & Quality Control Department of Steering Gear & Rack-Pinion manufacturing firm.
- Solid experience in Part Modeling, Detailing & Managing Assemblies & Aggregates.
- Working knowledge in GD&T.
- Basic knowledge of Sheet Metal Design.
- Basic knowledge of working on SAP.
Tool Skill Set :
- CAD Software’s : Pro/Engineer Wildfire (5.0, 4.0)
AutoCAD2010,09.
Catia V5 R17
- Operating System : WINDOWS 98/2000/XP/VISTA.
- Others : MS OFFICE
Experience :
Work experience in the Industry domains of Special Purpose Machines, m/c Tools & General Engineering.
Educational Qualification :
B.E in Mechanical Engineering from S.G.D.C.O.E, Jalgaon.
Representative Projects :
1. Solid Modeling & Detailing of Vertical Honing Machine Components
Title : Component design of honing machine.
Software Used : Pro/Engineer wildfire 5.0
Role : Design Engineer
Company : Srujan Automation
Honing is a final finishing operation conducted on a surface, typically of an inside cylinder or injection nozzles, such as of an automotive engine block. Abrasive stones are used to remove minute amounts of material in order to tighten the tolerance on cylindricity. Honing is a surface finish operation, not a gross geometry-modifying operation. Hones can be of the multiple pedal types or the brush type. Either type applies a slight, uniform pressure to a light abrasive that wipes over the entire surface.
As a Design Engineer, was responsible for
- Studying the standards followed by the client.
- Converting the 2d inputs to 3D models in Pro/E.
- Checking the interferences between various assemblies.
- Checking the drawings as per G.D. & T.
- Release the design for manufacturing.
- Providing design support for modifications suggested by the client or assembler.
- Design Procurement.
- Design the Hydraulics & pneumatic Circuit as per machine requirements.
- Interacting with suppliers for queries on job.
- Final inspection & testing of machines.
- Assembly support.
- To verify the parts are assembled as per the design and also to make R&D if the machine has any problem and solve it.
- Project Documentation.
2. Solid Modeling & Detailing of Glass Grinding Machine Components
Title : Component design of Glass Grinding Machine
Software Used : Pro/Engineer wildfire 5.0
Role : Design Engineer
Company : Srujan Automation
Glass grinding is a process of removing the sharp edges & giving the desired profile with the help of diamond grinding wheel. The glass is hold on the table which can be rotated with the help of rotary indexing table mounted on the slides, with the help of suction cups.
As a Design Engineer, was responsible for
- Studying the standards followed by the client.
- Converting the 2d inputs to 3D models in Pro/E.
- Checking the interferences between various assemblies.
- Checking the drawings as per G.D. & T.
- Release the design for manufacturing.
- Providing design support for modifications suggested by the client or assembler.
- Interacting with suppliers for queries on job.
- Final inspection & testing of machines.
- Assembly support.
- To verify the parts are assembled as per the design and also to make R&D if the machine has any problem and solve it.
- Project Documentation.
3. Solid Modeling & Detailing of Mangling Machine Components
Title : Component design of Mangling Machine
Software Used : Pro/Engineer wildfire 5.0
Role : Design Engineer
Company : Srujan Automation
Generally used to press or flatten sheets, tablecloths, kitchen towels, or clothing with the help of two rollers mounted on sturdy frame & rotated with electric motor coupled with the gearbox.
As a Design Engineer, responsible for
- Studying the standards followed by the client.
- Converting the 2d inputs to 3D models in Pro/E.
- Checking the interferences between various assemblies.
- Checking the drawings as per G.D. & T.
- Release the design for manufacturing.
- Providing design support for modifications suggested by the client or assembler.
- Interacting with suppliers for queries on job.
- Final inspection & testing of machines.
- Assembly support.
- To verify the parts are assembled as per the design and also to make R&D if the machine has any problem and solve it.
- Project Documentation.
4. Sheet metal Modeling & Detailing of CNC-WEDM Work-tank
Title : Component design for CNC-WEDM Work-tank
Software Used : Pro/Engineer wildfire 4.0
Role : Project Support Engineer
Company : Srujan Automation , pune.
CNC-WEDM Work-tank design with zero fill time. The tank size was 800 x 550 x 350 mm, with a maximum fluid capacity of 500 L & maximum fluid height of 300 mm.It was modeled on sheet metal module with providing proper reliefs & bends. Flat pattern is generated for calculating development length. As a Project Support Engineer, was responsible for
- Studying the standards followed by the client.
- Converting the 2d inputs to 3D models & production drawings in Pro/E.
- Providing design support for modifications required.
- Interacting with client for queries on job.
- Performing Quality checks & Project Documentation.
5. Process Development & Quality Assurance of Rocker Arm Screw
Title : Process Development of Rocker Arm Screw
Software Used : AutoCAD
Role : Engineer
Company : Auto turn Industries.
Rocker Arm Screws are the components of valve train use in conjunction with the Rocker Arm to adjust the engine valve setting. The different types are Ball head screws, Square end screws & Radius head screws.
As an Engineer, was responsible for
- Studying & detailing of customer design.
- Preparing Final Product Quality Plan.
- Preparing Process Flow Diagram & Process Flow Drawings.
- In-process Inspection & Pre-Dispatch Inspection using Advanced tools like CONTRACER (CV-2000) with FORMPAK as Metrology Software, SURFTESTER (SJ-400), PROFILE PROJECTOR (PJ-A3000).
- Monitoring over the processes like Thread Rolling, Induction Hardening, CNC forming, Grinding in the shop floor.
6. Production planning & Quality Control of Power Steering Gear.
Title : Production planning & quality Control of power steering.
Role : PPC Engineer
Company : ZF Steering Gear INDIA Ltd.
ZF INDIA is Pioneer in Manufacturing and Supply of Integral Hydraulic Power Steering & Mechanical Steering System in India. Present installed capacity is 1,40,000 units of Mechanical Steering Gears and 2,20,000 units of Power Steering Gears and 50,000 units of Hydraulic Rack & Pinion Steering Gears per annum.
As an Engineer, was responsible for
- Studying & detailing of customer design.
- Preparing Final Product Quality Plan.
- Preparing Process Flow Diagram & Process Flow Drawings.
- In-process Inspection & Pre-Dispatch Inspection using Advanced tools like CONTRACER (CV-2000) with FORMPAK as Metrology Software, SURFTESTER (SJ-400), PROFILE PROJECTOR (PJ-A3000).
- Monitoring over the processes like Thread Rolling, Induction Hardening, CNC forming, Grinding in the shop floor.
-
September 21st, 2011, 01:28 PM
Post Count Number #3
Resume (DEE+2.5yr.exp.)
RESUME
Name : Thaker Chirag Bhupendrabhai.
Hobbies : Watching News & Play Chess.
Academic Qualification :
Certification Board/Uni. Grade / % Year Of Passing
S.S.C. G.S.E.B. Distinction / 76 April-01.
H.S.C. G.H.S.E.B. First Class / 61 March-03.
T.Y.B.Commerce Guj.Uni. Second Class / 52 March-06.
Diploma Electrical Eng. T.E.B.
Gandhinagar. Second Class / 58 Nav-08.
Other Qualification :
- MS Office (Guj.Council Of Vacational Training )
- F.A.S ( G.C.V.T.)
- Call Centre Assistant (G.C.V.T.)
- Knowledge Of Internet.
Career Path
I have experience in MPHASIS BPO Company Pvt.Ltd. as a Customer Support Officer for 3 months.
At present I am working in “TRAFO FILTER SERVICES” Pune based company as a site supervisor since 1st May 2009, In the contract of Torrent Power Ltd. For Online filtration and maintenance of distribution transformers. I have also knowledge of different type of tests which are necessary in transformers like BDV, ACIDITY etc. I have also knowledge of OLTC and switchgears breakers .
-
September 24th, 2011, 05:47 PM
Post Count Number #4
jobs
Dear Sir/Mam
I want to work with this organisation. I am civil engineer from BENGAL ENGINEERING AND SC. UNIVERSITY, SHIBPUR
-
February 17th, 2012, 02:53 PM
Post Count Number #5
Resume : Kapil Saraswat B.E. Automobile with two patents and 5 months experience
COVER LETTER
TO WHOMSOEVER IT MAY CONCERN
Subject : Suitable position in your esteemed organization.
Respected Sir
With regard, I undersigned that I have done Automobile Engg. from University of Mumbai. I have two patents (U.S) on Advanced Future Car & Spark Ignition Diesel Engine. I did my training in Hans Hyundai and Deep Hyundai, Delhi for 4 months as a Trainee Engineer and worked as a Trainee Engineer in Skoda ind.ltd Aurangabad. I am interested to join your esteemed organization.
I have attached my resume along with this letter for your kind perusal. I request you to consider my application favorably for appropriate position and give me opportunity.
Thanking you
Yours sincerely
(Kapil Kumar Saraswat)
RESUME
KAPIL KUMAR SARASWAT
(B. E. Automobile Engineer) Email :-kapilsarswat AT gmail.com
Career Objective :
Seeking an opportunity to utilize my skills and knowledge that offers me a professional growth while being resourceful, flexible and innovative in an automobile industry.
Work Experience :-
1) Company Name : Brakewel Automotive Components, Noida.
Position Title : Quality/Safety Officer.
Job Location : Noida
Date Joined : 03 Sept 2011 – Till Date
Responsibilities :
- Maintaining Quality of the product.
- Daily quality report.
- Quality Inspection
- Production method inspection.
- Implementing new safety measures.
- Online product testing
Training Experience :-
1) Company Name : Deep Hyundai, Delhi.
Position Title : Technician.
Job Location : Delhi
Date Joined : 25 May 2008 – 25 JUNE 2008
Responsibilities :
- Maintaining Job record.
- Vehicle Servicing.
- Checking quality of work.
- Servicing the vehicle.
2) Company Name : Skoda Auto India Ltd, Aurangabad.
Position Title : Trainee Engineer.
Job Location : Aurangabad.
Date Joined : Jan 2010 – Feb 2010
Department : Manufacturing
Responsibilities :
- Assembly Line Work.
- Body welding / mounting.
- Quality control.
- Maintaining the consistency in work.
- Maintaining day by day production report.
3) Company Name : Hans Hyundai, Delhi.
Position Title : Trainee Engineer.
Job Location : Delhi
Date Joined : July 2010 – 15 Sept 2010
Responsibilities:
- Service Advising.
- Maintaining job record.
- Vehicle inspection.
- Costumer care.
Educational Qualification :
- B.E in Automobile Engg. with Distinction with 75.76 %, From Rajendra Mane College of Engg. & Tech, University of Mumbai.
- Appeared in GATE 2011 and scored 17.33 marks.
- Certified course on Rapid Prototyping.
Batch Year Course Specialization Board/University College/School Percentage Secured
2007-11 Bachelor of Engg. Automobile Engg. Mumbai University Rajendra Mane College of Engg. & Tech.,Ambav 63.27%
2005-06 Senior Secondary Non-Medical C.B.S.E. Vanasthali Public School,Delhi 60.2%
2003-04 Secondary General C.B.S.E Vanasthali Public School,Delhi 66.6%
Project summary :
- Design & Fabrication of All Terrain Vehicle.
- Advanced Future Car (U. S Patented).
- Spark Ignition Diesel Engine (U.S Patented).
- Exhaust Pipe Modification.
- Exhaust Braking.
- Air Powered Car.
Extra Curricular Activities :
- Participated in national level BAJA SAE Competition of design and fabrication of All Terrain Vehicle 2011.
- Presented Projects in International Project Exhibition held in Chennai.
- Won 2nd prize in national level Robotics Competition.
- Participated in National Level workshops and Paper Presentation.
- Ongoing one year Project under Skoda, Aurangabad.
- Got distinction in last year of Engg. With 75.76%.
- Done workshops on Robotics, Computer Hardware and assembly.
Technical Skills:
- Auto cad, Pro- E, Catia, Microsoft Office, Basic Programming, Machining (Lathe, Shaper, Milling, Basic hand tools, sheet metal fabrication, grinder, welding processes (gas, Spot).
-
September 16th, 2012, 05:43 PM
Post Count Number #6
prost of production Engg ot mng.
… RESUME
MURLIDHAR RAMKISHAN SURWASE
E-mail : murli_rs AT rediffmail.com
Total Experience : 5.4 Years.
Current company : VIRGO VALVE & CONTROLS LTD HIJEWADI MIDC PUNE
Privies Company : SCHRADER DUNCAN LTD RANJANGAO MIDC PUNE
Designation : RODUCTION & ASSEMBLY SUPERVISOR
Carrear objective :
To be a part of leading corporate and willing to work as a key player in challenging & creative environment.
Job Objective :-
To serve the company the best of my knowledge and ability to work in industry.
Work Experience :
1) ORGANIZATION : VIRGO VALVE & CONTROLS LTD HIJEWADI MIDC PUNE.
Duration : 6th June2011 to till date
Designation : RODUCTION & ASSEMBLY SUPERVISOR
V.V.C.L is ISO 9001 Certified Company which is leading Manufacturing of ball valve which meets to the oil & gas sector pipeline for flow control or divert.& the major customers are RELIANCEPETROLIUM,L&T.MODAC,B.C.P.L,IBR,SIME DURBY,MCDORMATT .etc.
The Role :
- TO handle manpower in STMBV product Line effectively & efficiently.
- To achieve Daily, Weekly & monthly plan target as per production plan.
- To give good product to customer in terms of quality, product performance & to make sure that customer complaints are reduced by 30% in whole year.
- To make sure that we are having good system health in terms of MRN, SRN & WIP, with the help of BAN –LN system.
- To co-ordinate with vendor, m/c shop, store depart. For successful completion of production plan.
- To monitor the QOS & VSM activity of all product lines.
- To work under pressure conditions but at the same time should be able to take the correct decisions & to never compromise with quality at any stage.
- To reduce NON-CONFORMANCE during performance TPI & to make best efforts that no NC to be given by TPI person.
- Working in atmosphere of manpower planning & implementation of Lean Manufacturing system of 5S, KANBAN (pull system), KAIZEN, CONTINUOUS FLOW, TPM &VSM.
- Reading a Mechanical Drawing & GD&T.
- Improve the operator’s malti skill matrix.
- To give training to new join people about our product, safety & Lean Manufacturing.
- To achieve zero accident.
- Handling 55-60 manpower resources for the process.
- Solve costumer problems.
- Knowledge of BAN-LN system.
2) ORGANIZATION : SCHRADER DUNCAN LTD RANJANGAO MIDC PUNE
Duration : 12th April 2010 to 4th June 2011
Designation : PRODUCTION & ASSEMBLY SUPERVISOR
Schrader Duncan Limited is IS09001, TS16949 Certified company a leading manufacturer of tube valves and accessories which meet the needs of tube manufactures and tyre care, repair and servicing units.& also Manufacturing & Assembly of pneumatic Cylinder
The Role :
- Looking the production to achieve the given target
- Looking after shift administration and production supervision, quality & quantity.
- Reading a mechanical drawing & GD&T.
- Recording and analyzing daily production as per target plans.
- Providing Support on shop floor activities.
- Handling 45-50 manpower resources for the process.
- Working in atmosphere of manpower planning & implementation of LEAN Manufacturing SYSTEM OF 5S,KANBAN(pull system),KAIZEN,CONTINUOUS FLOW, TPM &VSM
- Working in atmosphere & Implementation of ,APQP , SPC & MSA
- Manage all relevant documentations such as control instructions, SPC, variable control chart, Production chart, Control plan, PFD etc.
- Checking safety precautions before starting production activities.
- Analysis & monitoring of OEE of machine.
- Improve the operators malt skill matrix.
- Modification of existing drawing using AUTO-CAD.
- Knowledge of Computer.
- 3) PRGANIZATION : VICKERS-EATON INTERNATIONAL SYSTEMS LTD PIMPRI MIDC PUNE
Duration : From 07th June 2007 to 8 April 2010
Designation : PRODUCTION & ASSEMBLY SUPERVISOR (trainee)
About company : - Working with Vickers-Eaton systems Ltd (IS09001, TS16949 & ISO14001 ) as a production engineer at Pune works. My work area is production (Machine shop). We manufacture in our shop parts required for Gear Pump. I am responsible for key part of gear pump called Pressure Bush, handling vertical machining center (Mazak CNC). Also responsible for production from BFW controlled machine, handling 15-20 peoples and see over the supply of finished parts to Assembly. Our company is a largest gear pump, valves, housing & cylinder manufacturing in India & a love joy is our famous brand in India we are also export our product to U.S, SINGAPORE
Job Profile : -
Key Skill
- Accountable production planning (sequencing of operation)
- Taking Corrective action against quality problems increasing productivity.
- Maintaining continues flow of finished goods required for gear pump assembly.
- Repairing fixtures required for job machining, which are operating hydraulically.
- Manage the SPC record
- Reading mechanical drawing & GD&T
- Knowledge of machining process
- Working in atmosphere & Implementation of 5’S’, KAIZEN, kanban.
- Manage all relevant documentations such as control instructions, SPC, MSA, Variable control chart, and production chart.
- Look over tooling and setting of fixtures.
- Analysis of required gear pump.
EATON LEAN MANUFACTURING (TOOLS) SYSTEM & IMPLIMENTATION PROGRAM ON SHOP FLOWER (TRAININGS ATTENDED)EATON LEAN MANUFACTURING SYSTEM (ELS)
1. VSM
2. 5s
3. Standardized work
4. TPM
5. Error proofing
6. Setup reduction
7. Continuous flow
8. kanban (pull system)
9 Also training on Eaton business system (EBS)
TRAININGS ATTENDED
o Training & Implementation on ISO14001.( Envirmental mgt system)
o Training on First aid required in an emergency.
Training Awareness
* TPM
* SAFTY AWARNESS
* PERSONALITY DEVELOPMENT
* SUPERVISORY MANAGEMENT
Diploma Project :
Organization : - Government Polytechnic, Latur (MSBTE MUMBAI)
Title : Two wheeler loading unloading mechanism.
Mechanism used in project : A signal start power screw used in our project
A power screw is a screw & nut system used to change angular [rotary] motion
In to linear motion with the by muscular force applied to the pedal or motor
The power screw will rotate by mounting of over. Than the platform will move
Up word direction while pedal is applauding reverse direction & than the power will rotate reverse direction & platform will move down word direction
Educational Details:
1) Diploma in Mach Engg from Gvt. Polytechnic Latur with 58% (MSBTE MUMBAI)
2) MACHINIST From Government Industrial training Institute Latur With 68% (MSBTE MUMBAI)
3) S.S.C. from D. High School from Latur Board with 79%
Personal Profile:
Father’s Name: Mr. RAMKISHAN GUNDERAO SURWASE
Languages Known: English, Marathi, and Hindi.
Current Address: Dattwadi akurdi-35 pune.
Permanent Address: A/p Hangaraga, Tal- Nilanga, Dist Latur
Current salary: 3.6 Lac
Accepted salary: 4.6 Lac +
Notice period: 3 Month
Place: Pune
Date
Murlidhar.R. Surwase
… RESUME
MURLIDHAR RAMKISHAN SURWASE
Total Experience : 5.4 Years.
Current company : VIRGO VALVE & CONTROLS LTD HIJEWADI MIDC PUNE
Privies Company : SCHRADER DUNCAN LTD RANJANGAO MIDC PUNE
Designation : RODUCTION & ASSEMBLY SUPERVISOR
Contact no. : 9923553088
E-mail : murli_rs AT rediffmail.com
Carrear objective:
To be a part of leading corporate and willing to work as a key player in challenging & creative environment.
Job Objective:-
To serve the company the best of my knowledge and ability to work in industry.
Work Experience:
1) ORGANIZATION: VIRGO VALVE & CONTROLS LTD HIJEWADI MIDC PUNE.
Duration : 6th June2011 to till date
Designation : RODUCTION & ASSEMBLY SUPERVISOR
V.V.C.L is ISO 9001 Certified Company which is leading Manufacturing of ball valve which meets to the oil & gas sector pipeline for flow control or divert.& the major customers are RELIANCEPETROLIUM,L&T.MODAC,B.C.P.L,IBR,SIME DURBY,MCDORMATT .etc.
The Role:
- TO handle manpower in STMBV product Line effectively & efficiently.
- To achieve Daily, Weekly & monthly plan target as per production plan.
- To give good product to customer in terms of quality, product performance & to make sure that customer complaints are reduced by 30% in whole year.
- To make sure that we are having good system health in terms of MRN, SRN & WIP, with the help of BAN –LN system.
- To co-ordinate with vendor, m/c shop, store depart. For successful completion of production plan.
- To monitor the QOS & VSM activity of all product lines.
- To work under pressure conditions but at the same time should be able to take the correct decisions & to never compromise with quality at any stage.
- To reduce NON-CONFORMANCE during performance TPI & to make best efforts that no NC to be given by TPI person.
- Working in atmosphere of manpower planning & implementation of Lean Manufacturing system of 5S, KANBAN (pull system), KAIZEN, CONTINUOUS FLOW, TPM &VSM.
- Reading a Mechanical Drawing & GD&T.
- Improve the operator’s malti skill matrix.
- To give training to new join people about our product, safety & Lean Manufacturing.
- To achieve zero accident.
- Handling 55-60 manpower resources for the process.
- Solve costumer problems.
- Knowledge of BAN-LN system.
2) ORGANIZATION: SCHRADER DUNCAN LTD RANJANGAO MIDC PUNE
Duration : 12th April 2010 to 4th June 2011
Designation : PRODUCTION & ASSEMBLY SUPERVISOR
Schrader Duncan Limited is IS09001, TS16949 Certified company a leading manufacturer of tube valves and accessories which meet the needs of tube manufactures and tyre care, repair and servicing units.& also Manufacturing & Assembly of pneumatic Cylinder
The Role:
- Looking the production to achieve the given target
- Looking after shift administration and production supervision, quality & quantity.
- Reading a mechanical drawing & GD&T.
- Recording and analyzing daily production as per target plans.
- Providing Support on shop floor activities.
- Handling 45-50 manpower resources for the process.
- Working in atmosphere of manpower planning & implementation of LEAN Manufacturing SYSTEM OF 5S,KANBAN(pull system),KAIZEN,CONTINUOUS FLOW, TPM &VSM
- Working in atmosphere & Implementation of ,APQP , SPC & MSA
- Manage all relevant documentations such as control instructions, SPC, variable control chart, Production chart, Control plan, PFD etc.
- Checking safety precautions before starting production activities.
- Analysis & monitoring of OEE of machine.
- Improve the operators malt skill matrix.
- Modification of existing drawing using AUTO-CAD.
- Knowledge of Computer.
- 3) PRGANIZATION: VICKERS-EATON INTERNATIONAL SYSTEMS LTD PIMPRI MIDC PUNE
Duration : From 07th June 2007 to 8 April 2010
Designation : PRODUCTION & ASSEMBLY SUPERVISOR (trainee)
About company : - Working with Vickers-Eaton systems Ltd (IS09001, TS16949 & ISO14001 ) as a production engineer at Pune works. My work area is production (Machine shop). We manufacture in our shop parts required for Gear Pump. I am responsible for key part of gear pump called Pressure Bush, handling vertical machining center (Mazak CNC). Also responsible for production from BFW controlled machine, handling 15-20 peoples and see over the supply of finished parts to Assembly. Our company is a largest gear pump, valves, housing & cylinder manufacturing in India & a love joy is our famous brand in India we are also export our product to U.S, SINGAPORE
Job Profile: -
Key Skill
- Accountable production planning (sequencing of operation)
- Taking Corrective action against quality problems increasing productivity.
- Maintaining continues flow of finished goods required for gear pump assembly.
- Repairing fixtures required for job machining, which are operating hydraulically.
- Manage the SPC record
- Reading mechanical drawing & GD&T
- Knowledge of machining process
- Working in atmosphere & Implementation of 5’S’, KAIZEN, kanban.
- Manage all relevant documentations such as control instructions, SPC, MSA, Variable control chart, and production chart.
- Look over tooling and setting of fixtures.
- Analysis of required gear pump.
EATON LEAN MANUFACTURING (TOOLS) SYSTEM & IMPLIMENTATION PROGRAM ON SHOP FLOWER (TRAININGS ATTENDED)EATON LEAN MANUFACTURING SYSTEM (ELS)
1. VSM
2. 5s
3. Standardized work
4. TPM
5. Error proofing
6. Setup reduction
7. Continuous flow
8. kanban (pull system)
9 Also training on Eaton business system (EBS)
TRAININGS ATTENDED
o Training & Implementation on ISO14001.( Envirmental mgt system)
o Training on First aid required in an emergency.
Training Awareness
* TPM
* SAFTY AWARNESS
* PERSONALITY DEVELOPMENT
* SUPERVISORY MANAGEMENT
Diploma Project:
Organization: - Government Polytechnic, Latur (MSBTE MUMBAI)
Title: Two wheeler loading unloading mechanism.
Mechanism used in project: A signal start power screw used in our project
A power screw is a screw & nut system used to change angular [rotary] motion
In to linear motion with the by muscular force applied to the pedal or motor
The power screw will rotate by mounting of over. Than the platform will move
Up word direction while pedal is applauding reverse direction & than the power will rotate reverse direction & platform will move down word direction
Educational Details:
1) Diploma in Mach Engg from Gvt. Polytechnic Latur with 58% (MSBTE MUMBAI)
2) MACHINIST From Government Industrial training Institute Latur With 68% (MSBTE MUMBAI)
3) S.S.C. from D. High School from Latur Board with 79%