Desai construction Pvt ltd VALSAD : Stores Officer

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Recruit
    Join Date
    October 11th, 2010
    Location
    Tuticorin
    Posts
    38

    Desai construction Pvt ltd VALSAD : Stores Officer

    Designation : Assistant / Officer Stores

    Job Description :
    Inventory management & controlling the stock. Daily report of opening balance & closing balance of material. Stock maintenance & making ledger posting. Billing of the material. Reconciliation of the materials. Stores Management, Inventory Management & looking after the various site stores. Scrutinizing the indents from project sites & providing them the same through inter-sites transfer or through purchase department. Regular check on the site stores for idle materials, quantities & quality of materials. Maintaining of records for the use of Head-office & providing MIS on monthly basis for all the sites.

    Desired Profile :

    • Willing to update site store process
    • Candidate must have at least 5 - 10 years of experience in managing store as a Store Incharge in a construction firm.
    • Full Knowledge of construction material and store Keeping / records.
    • Fluency in Computer Tally 9, MS-Office & Internet

    Experience :5 - 10 Years

    Education : UG - Any Graduate - Any Specialization
    PG - Any PG Course - Any Specialization

    About us :
    Desai Construction Pvt. Ltd. was formed over three decades ago, with a vision to achieve leadership in the field of civil construction, providing our best services to the satisfaction of all our clients. It was also the tenacity of a group of individuals fired by imagination and professionalism that sought for this envious position.

    Contact us:
    Email : info@desaiconstruction.com
    Desai construction Pvt ltd
    CONSTRUCTION HOUSE
    N.H.No.8,Opposite New GIDC,
    Gundlav,
    VALSAD - India
    phone: +91-2632-304000
    http://desaiconstruction.com/
    Last edited by radhaj; October 14th, 2010 at 01:05 PM.

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Sajeevan.KP
    sajeevantecton AT yahoo.com
    Stores officer/Manager

    RESUME
    SAJEEVAN.KP sajeevantecton AT yahoo.com

    Objectives :
    To place myself in a position in an organization where in my skills in the field of management and experience can be utilized to the maximum for the benefit of the organization while providing a base for personal and professional growth.
    Professional Experience :
    July 2006 till date.
    Store Officer in Tecton Engineering & Construction L.L.C, Ajman UAE (An ISO 19001 :2000, 14001:2004 &OHSAS: 18001:1999) associated company of GALFAR Engineering & Contracting W.L.L, Muscat
    April 2002 to June 2006
    Store officer In MFAR Constructions PVT Ltd (OHSAS 18001 :1999/ISO 14001:2004/ISO9001:2000 Company) Bangalore, an associated company of GALFAR Engineering & Contracting, Muscat
    Project Worked
    MFAR CONSTRUCTION PVT LTD (Multi storied Building)
    1. Embassy Meadows Project, Bangalore
    2. Jamia Abad Mosque Project ,Bhatkal,Mangalore
    3. Anjuman Boys Hostel Project ,Bhatkal
    4. SDM medical College ,Dharwad
    5. Purava Park ridge ,Bangalore
    6. Mfar Silver Line Tedch Park,Bangalore
    7. Ittina Abby Project ,Bangalore
    8. IBC Knowledge Park,Bangalore Phase 1 &2
    TECTON ENGINEERING & CONSTRUCTION L.L.C (Pipe line, sewerage, EPC & Desalination)
    Water system jazirat Al Hamara Rasalkhaima N-4028 Project (1-Billion Projects)
    1. Client : Abudhabi Water And Dispatching Company (ADWEA) TRANSCO
    2. Consultants : TEBODDIN Middle East
    3. Scope of Work : Pipe Line CS ,TYCO,DI and GRP Pipes 125 KM,Instrumentation Work,RCC Water tank,MS Water Tank, Chlorination Building and Control Building
    4. Material Handling : Tyco Pipes,GRP Pipes,CS Pipes and DI Pipes, Butterfly Valves, Dismantling Joints, Chlorination Building ,Flow meters, Chamber Accessories and Electrical materials
    Water Pipeline System Mirfa to Madinat Zayed (2-Billion Projects)
    1. Client : Abudhabi Water And Dispatching Company (ADWEA) TRANSCO
    2. Tyco Pipe Line 160 KM Mirfa to madinat zayed
    3. Pumping Station 3 No’s
    4. Handling Pumping station materials &,SIMENS Instrumentation Materials
    5. Surge vessel, Dismantling Joints and Butterfly Valves
    SEWARAGE LINE & PUMBING STATION
    1. Sewerage Pipe line at Mafreq 80 KM
    2. Sewerage pumping station and Chambers
    3. Handling HDPE Pipes
    4. Client : ADSSC
    N-7430 Construction of Twin DN1600 C.S Pipeline FROM To 12 AARC
    (3 Billion Project)
    1. 1600 Dia Cs pipe
    2. Client :Abudhabi Water And Dispatching Company (ADWEA) TRANSCO
    3. Consultants : ILF Consulting Engineer
    4. Complete Welding Line
    5. Handling Pipe line Machineries ( Pneumatic clamp,Pipelayer,Side Boomer)
    6. Pipe Line Lab Equipments
    7. Coating Materials (CANUSA Material)
    8. Handling sand Blasting Material (Copper slag/Compressor)
    Duties and responsibilities
    1. Preparing Purchase request/Material indent wrt. Construction program, master budjet,by considering lead time
    2. Follow up for the purchase order for the material from purchase dept wrt.. Lead time
    3. Checking of the received material for quality,quantity,specification jointly with QC/Planning dept
    4. Goods receipt cum inspection report is made with proper authorization and take the material in to the stock
    5. Issue of the material are strictly on issue slip raised by the Project Engineer/Authorized person controlling the issue/consumption along with Qs dept.
    6. Periodical check of perishable items at site with monitoring chart.
    7. Maintaining minimum/Maximum reorder level
    8. Periodical check of Asset and scaffolding at site and maintaining record of the same.
    9. Maintaining complete store record
    10. Material sentry in ERP system and checking Stock Movement
    11. Preparation manual Stock statement every month after physical verification of materials.
    12. Internal and External Audit Preparation
    13. Maintaining Loan/Returnable register
    14. Handling Site Imp rest Cash(AED 20,000)/Transportation/Logistics
    15. Handling site administration
    16. Handling Different Types of scaffolding
    17. Handling Spare Parts Material (P&M)
    Achievements
    1. Cost controlling by minimizing the wastage of materials at site (S)
    2. Efficient handling of stores keeping track of slow & non-moving items.
    3. Proper follow-Up with the vendors/suppliers
    4. Maintenance of fixed asset register.
    5. Regular follow-up for non stoppage of Work
    6. Handling Thousands of Consumable Material
    7. Work completion and satisfaction of customer
    Educational Profile
    Bachelor of Arts –Kannur University
    Computer Skills
    PGDCA - IHRD Kerala, MS Excel, Ms Office, MS Word, JAVA Operating System
    Store software
    Experience in ERP Store System
    Languages Known
    English, Hindi, Malayalam, Kannada, Telugu and Tamil
    Declaration :
    I hereby declare that the above information is true to the best of my knowledge and belief.
    Date : SAJEEVAN. K.P
    Plate :
    -------------------------------------------------------
    More Information about this submission and submitter :-
    ___________________________________________________
    Submission ID : 4089796
    Date & Time : 5th May 2011 12:52 PM (UTC)
    IP Address : 195.229.235.38
    Browser Info : Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1; InfoPath.2; .NET CLR 2.0.50727)
    Predicted Country : United Arab Emirates

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    BIO – DATA
    1 ) Name : Bhaskar Sil.
    2) Father Name : Hrishikesh Sil.
    3) Date of Birth : 27.04.1963 (Twenty seventh April Nineteen Sixty Three)
    4) Qualification : a) Madhyamik Examination Pass on – 1979.
    b) Higher Secondary Examination Pass on – 1981.
    c) Appear final Examination of B-Com – in 1983.

    5) Working Experience :
    Sl no Project Name Type of Project Client Name Working Period Type of Work Total Project Cost
    1 Parli Thermal Power Station Water Treatment Plant , Cooling Tower, Chimney CHP, Superstructure Maharastra State Electricity Board. 1984 to 1989 Store Clark Rs. 22,80,00,000=00 corer
    2 Chandrapur Thermal Power Station Water Treatment Plant . Maharastra State Electricity Board 1989 to 1992 Store In Charge Rs.
    14,50,00,000=00
    corer
    3 Penner Aluminum Ltd Foul Plant Penner Aluminum Ltd 1992 to 1994 Store In Charge Rs.
    06,50,00,000=00 corer.
    Sl no Project Name Type of Project Client Name Working Period Type of Work Total Project Cost
    4 Welspun (I) Ltd Trowel and Yarn Project Welspun Group 1994 to 1999 Store In Charge Rs.
    19,50,00,000=00 corer.
    5 Maharastra Jeevan Pradhikaran 210 KM long D.I, C.I & PVC, RRW Pipe line project.Over Heah Tank & Intake well. Maharastra Jeevan Pradhikaran 1999 to 2004 Store In Charge Rs.
    18,50,00,000=00 corer.
    6 Vedanta Alumina Ltd 70 KM Cross Country M.S. Spiral welded Pipe line Project ( 700 mm dia), Intake well. Vedanta Alumina Ltd 2004 to 2006 Store In Charge Rs.
    80,20,00,000=00 corer.
    7 Vedanta Alumina Ltd 86 Km Cross Country M.S. Spiral welded Pipe line Project ( 1066 mm dia) Intake well. Vedanta Alumina Ltd 2006 to 21.04.2008 Store In Charge Rs.
    165,00,00,000=00 corer
    8 M/S AHLUWALIA CONTRACTS (I) Ltd Central store execution/Modernization. All type of material (Shuttering, Machinery) handling,Maintanance and repairing . 14.04.2008 to 30.09.2008 Asst. Manager (Store) Total Area of store 120.00M x 70.00M
    9 M/S AHLUWALIA CONTRACTS (I) Ltd South City Project.5 no Unit South City Project. 01.10.08 to 31.01.2009 Asst. Manager (Store) Rs.
    8,50,00,000=00 corer
    10 M/S AHLUWALIA CONTRACTS (I) Ltd B.M.Air port Project.Ranchi.( Turminal Building,Power Plant, & Taxi Stand. Air Port Authority of India 01.02.2009 26.10.12 Manager (Store) Rs.
    11,8,50,00,000=00 corer
    Sl no Project Name Type of Project Client Name Working Period Type of Work Total Project Cost
    11 M/S AHLUWALIA CONTRACTS (I) Ltd Sasan Ultra Megha Power Project (660x6) sasan Reliance Infrastructure Ltd 27.10.12 to till date Manager (Store) Rs.
    950000000=00 corer
    With the above thiexperiences, I am filling that my candidature may fulfill your requirement for a Store In
    charge (Civil Construction, industrial infrastructure development and Cross Country Pipeline and store execution job.)
    06. Total Experience : 27 Years.
    07. E-mail ID : bhaskar.sil1963 AT yahoo.co.in
    08. Present draw salary cash in hand : Rs.33391=00 + park.
    09. Expected salary cash in hand : 38000=00 + park