www.ionnor.com Solutions Mohali : Offshore Process

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Freelancer
    Join Date
    August 18th, 2010
    Location
    India
    Posts
    16,237

    www.ionnor.com Solutions Mohali : Offshore Process

    Offshore Process & Quality Manager

    Important points :
    * Should have at-least 8-10 years of Quality implementation experience.
    * Hands-on experience with ITIL processes, focusing mainly on Incident, Problem, Event, Risk, Change management and other ITIL processes
    * Must have experience of building the quality department, calibrating the processes and quality MIS reports.
    * Position will be reporting to Chief Delivery Officer and will have an implementation team.
    * Quality Manager should have practical knowledge of process management, who has overseen these kind of activities over last 8-10 years.
    * A person who has quality in his/her attitude and who can drive the quality to a new level in the organization.
    * Be part of process audits and CMM initiatives, who will drive the complete inception, awareness, adaptation and implementation of industry standards and protocols.
    * Should have experience in security, quality, audits, certification/implementation and it’s sustenance through periodic audits(internal/external), process training, and build maturity
    * Achieving the continuity and maturity to next level through certification, example ISO 9001 :2009 then ISO 27K. This person should have done this kind of work.
    * KPI reporting, measurement, analysis and it’s reflection in overall and continued improvement across personnel and mode of delivery.
    * Self reliance and self starter. Pride and ownership in qualitative and secure mode of service delivery.
    * Achieving the continuity and maturity the next level through including the relevant local processes in IONNOR as a integrated part of the existing ISO 9001 :2008 and ISO 27000 in ErgoGroup.
    * This person should have done this kind of work or have a comprehensive understanding of the ISO ad ITIL framework

    PERSONAL :
    * Must be able to draft new &/ modify existing policies in sync with Norway center to establish a mature & qualitative service delivery model at Offshore Center, India.
    * At least degree in engineering from a premier institute viz. IIT
    * Exposure to different IT verticals is highly anticipated.
    * Multicultural – able to motivate to get the best out of people in different countries/cultures
    * Familiarity with quantitative management of the projects and processes, statistical data analysis & Trained/Exposed to CMMI, ISO 9001/TL 9000
    * Work closely with IT team to develop business processes which support new technology initiatives

    About us :
    IONNOR an Offshoring company, with its head office in Chandigarh, India specializes in delivering high quality offshore Software Solutions & IT Services from India and to the local onsite Markets. Our special focus is on the Nordic market.

    Contact us :
    E-96, Phase VIII, Industrial Area,
    S.A.S Nagar Mohali -160071,
    Punjab, India
    Contact No.
    Phone : +91-172-4306000-04
    Fax : +91-172-4306081
    careers@ionnor.com
    http://www.ionnor.com

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Dear ,

    I would like to offer myself as a candidate for the above mentioned posts in your esteemed Organization.

    Myself currently working with Aker Solutions Mumbai as a Piping Engineer with 8 years of Work Experience in the Piping Engineering .I take this opportunity to attach herewith my detailed resume for your kind pursue.

    I believe the details given therein would be sufficient to meet your requirements.

    Looking forward to hearing from you.


    Thanking you,

    Shabbir Sururi



    CURRICULUM VITAE
    shabbir.sururi@indiatimes.com


    Objective
    Shabbir Sururi has been working with Aker Solutions Pvt. Ltd. piping Engineer having total 8 years of experiences in this field. His primary role being to engineer detailed piping designs for refinery, petrochemical units, pharmaceutical unit & tank farms using 3D & 2D software .He has specialized in Piping Engineering after completing his graduation in Mechanical engineering. And is striving to expand his professional horizon.

    Name Ali Shabbir Sururi

    Educational Qualification
    Diploma in Mechanical Engineering from MSBTE.
    B.E Mechanical – Degree from University of Mumbai, India.
    Post Graduate course of piping engineering.

    Company / Organization Aker solution Pvt Ltd. (Mumbai)

    Designation Senior Engineer

    Work experience 8 years.

    Responsibility Area engineer (layout group)

    Engineering exposure :

    Layouts:
    Development of study piping (autocad/manual), equipment & piping layouts for Process areas, Tank-farm, Rack & utility areas.
    Worked on various Statutory codes Indian (OISD-118 & SMPV rules) & standards of Aker Solutions , Bechtel, Chemtex (Dupont) , EIL(Engineers India Ltd) & Iranian Petroleum standard.
    Preparation of piping studies for various equipments/facilities such Fractionating Columns, Furnace (vertical), Reciprocating Compressor, Fin fan cooler , storage tanks, gantries Reactors etc.
    Familiar with Stress analysis, Pipe Supports and Caesar-II software.

    Materials:
    Preparation of Pipe thickness calculation, Reinforcement pad & Miter bend calculation as per ASME B 31.3
    Preparation of Piping material & valve specifications.
    Familiar with international Design Codes like ASME,API & BS.

    Computer skills : Review Reality Software, Navis works, AutoCAD ,Caesar-II & MS office.
    Current CTC : INR 950000/annum
    Expected CTC : USD 4000/Month
    (Negotiable)
    Notice period : 45 days


    Professional experience:-

    Aker Solutions Pvt. Ltd. (formerly known as Aker Kvaerner)

    Working as Senior engineer-Piping From 21st July.2006- till date.

    Project work on

    Turkmengas South Yoloten Gas Field Development Project

    Responsibility: - Area Engineer for Acid Gas Recovery Unit.
    Duration: - From June .10 – Till date
    Unit include: - Fractionating Column, Plate Heat Exchanger, Fin fan cooler & reboiler
    Total no. of Equipments: - 25
    Total no. of Lines: - 350.
    Project executed in PDS.

    Esfahan Refinery Gasoline Production Plant, NHT/CCR/ISOM unit. (IRAN)

    Responsibility: - Area Engineer for Naptha HydroTreater unit.
    Duration: - From Jan. 08 – May 10.
    Capacity: - 60069 BPSD
    Unit include: - Fractionating Columns, Furnace (vertical), Reciprocating Compressor, Fin fan cooler & Reactors etc.
    Total no. of Equipments: - 45
    Total no. of Lines: - 1500.
    Project executed in PDMS.

    DTA-RTF & RRTF tank farm & Gantry (JERP) reliance industries limited.

    Responsibility: - Area Engineer for RTF unit .
    Duration: - from Oct ‘06 to Dec 07.
    Unit include: - Floating and Fixed Roof storage tanks & pumps. (Max dia. 57m) & 12 bay Fuel Oil Gantry.
    Total no. of Equipments: - 10
    Total no. of Lines: - 250
    Total no. of Tie in’s -300.
    Project Involved Site visit’s for feasibility study, modification in existing facility & Tie in’s .
    Project executed in PDS.


    Nature of work :-

    Review Basic Engg. documents, P& IDs & Key engineering documents.
    Finalizing BEP equipment layout to Issued for Engineering/design stage equipment layout as per basic piping study , design basis & statutory/client requirements .
    Prepared interconnecting diagram for Inter/Intra unit Pipe rack/sleeper for further detail engineering for pipe rack & input for rack loading.
    Developed Tank farm layout & gantry layout as per OISD Guidelines and CCOE approval layouts as per SMPV guidelines.
    Working with piping designers during development of study piping & review the same for process, operation, safety & maintenances point of view.
    Preparation of nozzle orientations.
    Preparation of utility distribution diagram, controlling and final issue.
    Review & commenting on vendor drawings for vendor items like Reactors, Columns, Heaters, Air coolers, Compressors etc. and co-ordination with client and vendor for the same.
    Liaise with lead engineer and supervisor for activities & document planning
    Controlling & Checking of Isometric .
    Interface with other engineering group for input & output requirements & co-ordination with site for design input & Tie in points.
    Design Review with Client for operation access, maintenance & safety point of view.
    Checking of Documents before issue such Piping GAD,MTO summaries etc.
    Participate in Technical & system audits.
    Controlling & Issue of Design inputs to & from piping to other discipline/client/site


    Chemtex Global Engineers Pvt. Ltd. Piping Engineer (July 04 to July06)

    Project worked on

    Simpe SpA,Italy worked as Co-area engineer.
    ICI PAKISTAN LTD,Lahore
    Far Eastern textiles Ltd , Shanghai

    Nature of work and Responsibilities :-

    Preparation of Piping & special items specification.
    Preparation of various special item specification such as jacketed multiport valve & Fabrication specs of various jacketed items
    Vendor drawing review and commenting .
    MTO for Jacketed lines .
    Preparation of Preliminary & Final MTO along with checking of Linewise & Delta summaries for MTO checking .
    Inch Dia-Inch Bore calculation and Thickness calculation, Reinforcement pad calculations.
    Preparation of Insulation & painting MTO.

    M/s. R.J.ASSOCIATES on deputation by Sharpline Engg. (Jan-03 to June-04)

    Project worked on

    New Hexamine plant for Saudi Formaldehyde Chemical corp,Al Jabel.
    Crude Oil Storage Tankfarm Area for ONGC GGS IV at Khalej.
    1200 TPD Edible oil Plant for Param Industries (I) LTD at Kutch.

    Nature of work and Responsibilities :-

    Preparation of study Piping GA for process plant & Tankfarm area.
    Piping GA and Isometrics checking
    Finalization of Equipment layout.
    Preparation of Nozzle Orientation
    Preparation of Preliminary bulk & final MTO
    Preparing bidding MTO from Plot plan and P& ID.
    Vendor drawing review and comments*.

    I hereby assure that the information given above is correct and to the best of my knowledge.
    Respectfully submitted by
    Sururi A.S.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CURRICULUM VITAE

    Inder Preet Singh
    To secure a challenging position where I can effectively contribute and upgrade my knowledge and skills and make a difference in whatever I do.
    - Pursuing B.Tech. In Mechanical Engineering with 7.1(C.G.P.A) from Lovely Professional University.
    - Done +2 from Punjab School Education Board with aggregate of 60 %.
    - Done Matriculation from Punjab School Education Board with aggregate of 70 %.
    - Automobile
    - Production
    - Manufacturing

    - Have participated in various sports and athletic events and won prizes in school and college.
    - Have won Second prize in science exhibition in 2005.
    - 6 Weeks In-house Industrial training in Upper India steel industry.
    - 6 months Industrial Training in Mahindra & Mahindra Swaraj Division, Mohali.
    -
    - Leadership skill
    - My strong dedication towards work.
    - Strong will power.
    - Positive attitude

    - Listening songs.
    - Internet Surfing & Making friends.