Land Surveyor : Resume CV

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    On probation
    Join Date
    September 30th, 2010
    Location
    jammu
    Posts
    1

    Land Surveyor : Resume CV

    RISHI RAJ
    rishirajsingh7 AT yahoo.co.in
    rishirajsingh7 AT gmail.com

    OBJECTIVE : -
    To work in an environment this leads to mental satisfaction & where perseverance should be the key of success.

    EDUCATIONAL QUALIFICATION : -
    1- B.S.C (Hons.)

    TECHNICAL QUALIFICATION :
    Diploma in Surveying Granted by D.G.M.S.
    Govt. of India (ministry of labor) Dhanbad.

    Computer Proficiency : Dos, Window & MS office Excel &Auto cad 2008,
    Employment Record :
    1) Period : 1.04.2010 to Till date.
    Position Held : Surveyor
    Employer : AFCONS Infrastructure Ltd.
    Project : Jammu to Udhampur Road Project (NH-1A)
    Client : NHAI
    Description of Work : Revised DPR, GPS Traversing, TBM Flying and Center line
    Marking, Marking of Major & Minor bridge, Viaduct,
    Box & Pipe Culvert using with TOTAL STATION.

    2- Period : 11.09.2007 to 31.03.2010
    Position Held : Surveyor
    Employer : AFCONS Infrastructure Ltd.
    Project : East-West Gas pipe Line Project
    Client : Reliance
    Description of Work : Center line marking of building Pile caps, Columns, Pedestals, Mini FLYOVER Pile caps, Piers, Slabs , RC wall, RE wall,MDR Roads &Pant internal Road, RCC Drains, Helipad, Fishing Jetty, Pond, Buried Pipe line Pile caps & Tie beam, Pipe rack 14&15 Pile caps & Pedestals, T.B.M. Fly & Submission of all as built drawings to Client.

    3- Period : 08.05.2007 to 07.11.2007
    Position Held : Surveyor
    Employer : M/S. Doon Survey Company
    Project : DMRC
    Description of Works : Area Traversing & Topography, TBM Fly

    4- Period : 03.11.2006 to 02.05.2007
    Position Held : Training Surveyor
    Employer : M/S. Central Coal field Ltd. Kargali (O.C.P), Jharkhand
    Project : Kargali open cast mines.
    Description of Works : Traversing of mines, Correlation Survey, tachometry Survey, Manual working Measurement, Quantity Measurement & O.B. Measurement etc.

    5- Period : 20.04.2006 to 19.10.2006
    Position Held : Training Surveyor
    Employer : M/S. Central Coal field Ltd. Kargali O.C.P, (Jharkhand)
    Project : Kargali open cast mines.
    Description of Works : Traversing of mines, Correlation Survey, tachometry survey, Manual working Measurement, Quantity Measurement & O.B. Measurement etc.

    6- Period : 20.10.2005 to 19.04.2006
    Position Held : Training Surveyor
    Employer : M/S. Central Coal field Ltd. Bermo (Jharkhand)
    Project : Bermo seam incline
    Description of Works : Traversing of mines, Center line marking for the face Correlation Survey, tachometry survey, Manual working Measurement, Quantity Measurement & O.B. Measurement etc.

    7- Period : 15.04.2005to 14.10.2005
    Position Held : Training Surveyor
    Employer : M/S. Central Coal field Ltd. Khas Mahal (Jharkhand)
    Project : Khas mahal open cast mines
    Description of Works Traversing of mines, Center line marking for the face Correlation Survey, tachometry survey, Manual working Measurement, Quantity Measurement & O.B. Measurement etc.

    8- Period : 14.10.2003 to 13.10.2004
    Position Held : Training Surveyor
    Employer : M/S.Saninderpur Iron&M.N.Mines (Orissa)
    Project : M.N&Iron& Bauxite Mines
    Description of Works : Traversing of mines, Center line marking for the face
    Correlation Survey, tachometry survey, Manual working Measurement, Quantity Measurement & O.B. Measurement etc.
    8-m/s s.m.jha&cop.

    SPECIALIZATION IN WORK IN WITH FOLLOWING INSTRUMENTS :
    GPS & DGPS : Ecpoch-10,25,35

    TOTAL STATION : Liccka-1100,
    Sokkia, Nikon DTM 552,652, Pentex & Trimble

    LEVEL INSTRUMENTS : Auto Level
    Dumpy Level
    Tilting Level
    THEODOLITE : Microptic 20” (sec) list count.
    SKILL & ATTITUDE : Calculation of various quantities involved in surveying,

    PERSONAL DETAIL :-
    Name : RISHIRAJ
    Father’s Name : Shri Vishwa Raj Singh
    Date of Birth : 10,Dec.1982,
    Gender : Male
    Nationality : Indian
    Religion : Hindu
    Marital Status : Married

    Dear Sir,Maidam;
    With reliable sources I came to know that, there is a necessity of
    surveyor in your organization.
    Here with I am enclosing my resume for your perusal

    Regards,
    Rishiraj

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Tunnel And Land Survey

    CH.ZUBAIR AHMED
    E-mail Address :- Zubair_hdr AT yahoo.com
    Zubair.eng1 AT gmail.com

    Objective :
    - To get a challenging and responsible position in an organization.
    - Achievement of difficult tasks given by the senior management.
    - Always hard working for the benefit of the organization.
    Working Experience :
    More than 10th years experience in Survey Field (Having good knowledge about survey equipments and soft wears) on different highways building Tunnels in National and multinational companies detail as below.
    Employer : GEO CONSULT-TYPSA JV.
    Project Lowari Rail Tunnel Chitral.
    Contractor SAMBU J/V International (South Korean Company)
    Designation Sr.Survey specialist
    Period July 2007 to date
    History of Project :
    LOWARI RAIL TUNNEL PROJECT
    National High Way Authority (Ministry of Communication Government of Pakistan). Project of 8.5 km Rail Tunnel and 1.8 km of Road Tunnel with 65 km of Access Road (designed as latest international method) In order to create in all season link road from the southern territories to the winter time Isolated Chitral District in the North West Frontier Province, Pakistan. Lowari Rail Tunnel Project has been established. The Lowari Rail Tunnel (8.5 km), will leads vehicles as well as passengers on train through the tunnel. Platform will be established in front of each portal. This project has being supervised by Geo Consult and Typsa JV (Austrian and Spanish) with the Association of EMS AND ECIL (local Consultant Representative’s). SAMBU JV is performing the construction work as a Contractor of the project.
    Description of work :
    Measurement of Tunnel Excavation, Quantity of Shotcrete, Measurement of x section inside tunnel. Measurement of x section outside tunnel. Settlement test on the Platform. Setting out of structures ( walls, piers etc.), excavation and filling slopes, roads etc for design purposes.Travers measurements South Portal to North Portal Road tunnel and inside Rail tunnel. Checking of Tunnel Alignment
    Measurement of overburden on the Tunnel. Measurement of Road alignment and Topography of original and design surfaces. Control measurement of contractors work and check of quantities and cross sections. Layout of Buildings with coordinates , landscaping, Horizontal setting out, Horizontal Curves, Vertical Curves, Super Elevations, Cross Slope, Drain, Layout. Draw the Sketch for different type of structural work by using Auto Cad 2006 software. To provide the co-ordinates for execution of work and draw the X-Sections of road by using Auto Cad and Eagle Point software.

    Employer : Habib Rafique (Pvt.) Ltd,
    Project Behria Town Phase VIII & DHAI Phase,I Islamabad.
    Consultant Meinhard.
    Designation Sr.Surveyor
    Period January 2005 to Jun 2007
    History of Project :
    State of the art Urban Planning and Engineering Design on 38900.25 Kanal.
    16000 main Boulevard designed on the pattern of champs elyees with High Rise Mixed Use Commercial Building. Fully carpeted 160’ -120’-80’-60’-50’ wide roads work with foot path. Under Ground Electrification system with Grid Station. Sewerage system with sewerage Treatment plant, Garden, Green area, play area in each Blocks. Beautiful lacks for rowing and water sports. Mosque, Police Station, Post Office, Fire Station, Bus Terminal, Primary and Secondary School, College and University, Sports Complex, Club Houses, Hospitals and Mini Gulf Course.
    Description of work :
    Responsible of topography, landscaping, Horizontal setting out, Leveling, design of L Profile, Round about, T & Y junctions, Horizontal Curves, Vertical Curves, Super Elevations, Cross Slope, Drain, Layout and construction of telephone towers, X Section, Calculate the volume and quantity of X section (Earthwork and payment) Setting out of main Infrastructure such as a multi story and High-rise Buildings, Sewerage, Electrical & Road Work.To execute the site according to drawings and technical specifications.
    Employer : Khalid Rauf & Co. (PVT) LTD
    Project Overhead Bridge & approaches Batti Chowk Lahore.
    Consultant NESPAK.
    Designation Surveyor
    Period July 2003 to December 2004.
    Description of work :
    Designing and Layout of drain, Bus Base, Bus turns out. Residential colony, Approach Roads,TJunction,Y Junction, & Drains.Traversing and setting out of Horizontal alignment with co-ordinates, fixing of Pls with off set, taking X-section and L-section (Plotting), fixing of slops stakes as per X-Section, Design of L-Profile, lay out of structure works, Calculations and computations of slope stacks, horizontal and vertical curves and areas of cross sections.
    Employer : National Engineering Services of Pakistan (NESPAK).
    Project RARP Phase-II in NWFP.
    Designation Surveyor
    Period October 2000 to June 2003.
    Description of work :
    Checking of control points, layouts of roads, culverts, embankment, sub base, base course, TST Checking of centre line, cross-section & slope stakes as per X-section.
    Employer : Al-Rehman Associates (PVT) LTD,
    Project Kohe Noor Housing Society Multan Road Jhang.
    Designation Assistant Surveyor
    Period July 1999 to September 2000

    Computer Skills :
    MS-Office XP, 2007 Packages (Word, Excel, Power Point, Access and MS Project)
    Internet Surfing
    - 12 D Release Version (lite 7.0c1)
    Auto Cad (2D, 3D)
    Having Experience of 3d Mix
    Prolink, a soft were of sokkia for downloading and uploading
    Ultra Edit
    - Eagle Point (Road Cal., Contouring).

    Equipments :

    Can use hand set GPS. All the Total Station of Sokkia and latest Total Station of TOPCON and LICYA. Thedolite Manual & electronics & all types of level equipment.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Surveyor post Resume

    CURRICULUM VITAE
    Post Applied for : - Surveyor
    Pushp raj Meena
    Dist. - Bhilwara
    State - Rajasthan
    Pin. - 311201
    Email - pushpraj_meena AT ymail.com, smeena.pushp AT rediffmail.com

    Personal Details :
    Name : Pushpraj meena
    Father’s Name : Shri Soraj singh
    Mother’s Name : Smt. Manbhar Devi
    Date of Birth : 01/01/1987
    Marital Status : Married
    Sex : Male
    Nationality : Indian
    Language : Hindi, English

    Educational Qualification :
    Exam Passed Year Board/ University Percentage
    High School 2003 Rajasthan Board Ajmer 43.62 %
    Intermediate 2004 Rajasthan Board Ajmer 57.85 %

    Professional Qualification :
    Course Institute Year Percentage
    Diploma in Survey Construction Industry Development council Jaipur 2007-2008 60.00%
    Summary of Project : N.H.-06 (Nagpur to Durg)
    a) Client : Ashoka Buildcon Ltd.
    b) Period : 5-12-2006 to 10-2-2007
    c) Position : Surveyor
    d) Employer : Ciscom Engineer & Constructions

    Summary of Project : P.M.G.S.Y. (Panna PIU)
    a) Period : 20-2-2007 to 25-1-2008
    b) Position : Surveyor
    c) Employer : Ciscom Engineer & Constructions

    Summary of Project : Construction of refinery project
    a) Client : B.P.C.L.
    b) Period : 30-1-2008 to 15-9-2009
    c) Position : Surveyor
    d) Employer : Ciscom Engineer & Constructions

    Summary of Project : Gogra medium tank project &Canal Network
    a) Period : 20-9-2008 to 15-3-2009
    b) Position : Surveyor
    c) Employer : Ciscom Engineer & Constructions

    Summary of Project : Yamuna Expressway Project Six Line Package – A-11, Project Length 165 Km.
    a) Consultant : Scott Wilson India Pvt. Ltd.
    b) Client : Jai Prakash Associaes Ltd.
    c) Period : 20-3-2009 to 10-5-2010
    d) Position : Surveyor
    e) Employer : Shri Balaji Constructions

    Key skills - : Total Station - (Leica, Sokkia, Horizon)
    Auto Level Operating, All Paper work and
    Basic Knowledge Of System
    Employment Profile : 18 May 2010 to till Time
    Employer : Patel Infrastructure Pvt. Ltd.
    Name of Project : N.H.-12Package – 3 (Four Lane)
    Consultant : Stup Tonk Consultant Pvt. Ltd.
    Client : IRB Jaipur Deoli Toll WayPvt. Ltd.
    Project Length : 165Km.
    Project Cost : 1200 to 1300 Corer
    Designation : Surveyor
    Salary : 20500

    WORK RESPONSIBILITY - :
    1. Making and fixing of Control Pillar, T.B.M. Pillar & reference pillar.
    2. Center Line Marking by Total Station.
    3. Monthly T.B.M. Verification between T.B.M. (R.L.).
    4. R.L. Transfer to T.B.M. Pillars.
    5. Lay out of Bridges & Culverts by Total Station.
    6. O.G.L. recording before & after Clearing & Grubbing (every 10 M.).
    7. Preparation of Daily, Weekly & Monthly Survey Activity.
    8. X Y Z Recording of Existing Road.
    Certify that the above given information is correct in my knowledge

    Date : 16/01/2013 Name of
    Place : Deoli (Pushp raj Meena)