www.falcodevelopers.in Falco Developers Thane : Site Supervisor

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Freelancer
    Join Date
    August 18th, 2010
    Location
    India
    Posts
    16,237

    www.falcodevelopers.in Falco Developers Thane : Site Supervisor

    Position: Jr.Engineer / Supervisor
    Location: Mumbai (Ambivli & Titwala)
    Qualification: B.E Civil / Diploma
    Salary: 1,50,000 – 3,50,000 per annum

    Job Description:
    To assist Site Engineer/Sr. Engineer
    Day to day construction & supervision of civil works/work allotted by the Site Engineer/Project Manager
    Awareness of computer handling and report feeding
    To confirm norms, specification, validity of drawings & priority before execution, from the seniors
    To give feedback and report to seniors about activity/activities going on, labour strength, material consumption and achievement of day to day target
    To keep all required documents and drawings neat, clean and updated
    Interacting with other site staff such as storekeeper and sales executives at the site
    Organize the workers to make certain that they are all performing well to satisfy the construction requirement
    To note the changes required by the client in the absence of his seniors
    To check line, level, plumb, right angles etc. Along with checking proportions of different mortars and concrete mix as per specifications along with minimizing the wastage of different material
    To issue materials to the contractors for day to day work and to check material consumption at the end of the day and to ensure that no material is left behind unsecured, at the end of the day
    To keep a daily record of materials and labourers, activity wise in the following format

    Desired Candidate Profile:
    B.E Civil / Diploma with 2-7 years of experience with a reputed real estate company.
    Computer proficiency is must, should be able to study Auto CAD drawings & related softwares.

    Appky Now : careers@falcodevelopers.in
    http://www.falcodevelopers.in/careers.html

    Contact Us :
    Falco Developers
    110, First Floor, Orion Business Park,
    Next to Cine Wonder Mall, Kapurbawdi,
    Ghodbunder Road, Thane (W) - 400 607

    About us :
    The word “Falco” is derived from the word Falcon, a migratory bird known for its exceptionally powerful vision and flight and keen intellect symbolizing superiority, spirit, light, freedom and aspiration. It is a solar emblem for success, victory & rising above a situation. The Falcon is also symbolic of the rising sun in Egypt. It is also the king of all birds where many gods were shown with the head or body of the Falcon.
    Last edited by Guest-IJT; August 22nd, 2011 at 04:07 PM.

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : Mithlesh Paswan
    Email : mithlesh1977 AT rediffmail.com
    Designation / Skillset : piping engineer
    Piping/ Mechanical Engineer

    Resume :

    Education BIHAR SCHOOL EXAMNATION BOARD
    MATRICULATION (1991)
    68% MARKES SCORED
    Summary of Qualifications INDIAN MANAGEMENT AND POLY TECHNIC COLLEGE,
    LUCKNOW (UP)
    DIPLOMA IN MECHANICAL ENGINEERING (1994)
    72% MARKES SCORED.
    Languages ENGLISH, HINDI
    Objective
    Professional
    Experience PIPING SUPERVISOR/ENGINEER
    Proven general construction expertise with aligned planning & meeting the targets of the project within contractual milestones by coordinating with Engineering, Procurement , Mechanical Completion & Pre-Commissioning, and interface commissioning team.
    From Feb 2011 to Till date
    M/s Samsung Engineering Co. Ltd.
    Position Held : Piping Engineer
    Project : ONGC Petro Addition Ltd.(OPAL)
    Dual Feed Cracker Unit
    Client : ONGC, SEZ, Dahej, Gujarat, India
    - To work out the scope and work involved.
    - To co-ordinate with the contractor team to carry out the job as per schedule.
    - To prepare the monthly work plan subjected to available front of material.
    - Co-ordination with project and planning team to achieve the job targets.
    - Follow up the sub contractor to achieve the production targets.
    - Co-ordination with HSE Team to carry out the job with the high standard of safety.
    - Co-ordination with QC, Planning and Engineering team to prepare the test packages.
    - Preparation of work method statement for piping fabrication and erection activities.

    From July 2010 to January 2011
    M/s Reliance Engineers Assts. (P) Ltd.
    Position Held : Piping Engineer
    Project : FCC Unit, PRU, & Deleyed Coker Unit (Shut Down)
    Client : Reliance Petroleum Ltd., Jamnagar, Gujarat , India.
    - Analyzed the available work scope as per original PCO & DCN.
    - Planning, estimation, Billed, surveyed Quantity and responsible for mobilization of Site.
    - Monitored of Daily/weekly/monthly progress and plan work schedule and held the Work permit during the Execution of Work.
    - Preparations of spool drawing for field weld & shop welding from piping isometrics.
    - Preparation and certification of various reports such as fit up, weld inspection report.
    - Making all documents related to mechanical clearance & NDT.
    - Incoming material inspect at site.
    - Pre & post fit up checking with the Quality control.
    - Pre & post welding inspection with the Quality control.
    - Flushing hydro testing and commissioning of the piping systems.
    - Ensuring that the quality of material used in the construction & all equipment.
    - Assisting in pre-commissioning and commissioning activities.
    From May 2009 to April 2010
    M/s ERSAI Caspian contractor LLC. ( SAIPEM), Kazakhstan
    Position Held : Piping Supervisor
    Project : Caspian D Island Hook-UP Project
    Client : Agip Eni group, Exxon Mobil ,and Aker Solution
    - Pre-Fabrication of Flare Tower and Jacket For off- Shore .
    - Pre-fabrication of RIG projects with Exxon Mobil .piping Installation including pipe supports.
    - Man Power Mobilization
    - Consult Engineering problem with Engineers
    - Check and Monitor Tools, Equipment, and Welding Consumables
    - Check work Front and Co-ordinate with other disciplines
    - Request Scaffolding Installation
    - Work permit.
    From Nov 2007 to Feb 2009
    M/s Mohammad Al-Mojil Group (MMG)
    Position Held : Piping Superintendent
    Project : Sharq 3rd Expansion U&O Project , Al-Jubail (KSA)
    Client : Foster Wheeler.
    OVER ALL SUPERVISION OF INCLUDING SUCH AS.
    - Piping prefabrication including pipe support.
    - Piping installation including pipe support.
    - Check and monitor, tools , equipment, and welding consumables.
    SCHEDULE MONITERING FOR
    - Man power mobilization.
    - Construction equipment.
    - Welding Dia- inch , No. of spool, and pipe support.
    - Pipe internal inspection witness for large bore piping.
    - Check if the latest construction drawings are used.
    - Consult engineering problem with engineers.
    - Check and consult spool delivery at site.
    - Check work front and Co-ordinate with other discipline.
    - Prepare daily and weekly report.
    - Perform piping line check.
    - Perform piping reinstatement.
    From Oct 2005 to July 2007
    M/s Dodsal Engineering & Construction Pte. Ltd.
    Position Held : Piping Engineer
    Project : Dolphin Onshore Facilities Project, Raslaffan , Qatar.
    Client : JGC Middle east FZE.
    - Monitored of Daily/weekly/monthly progress and plan work schedule and held the Work permit during the Execution of Work.
    - Erection of piping spool and all type of support for equipment (DEME Thaniser, Cold box, Amine absorber, Mercury Guard Reactor, HC sump Drum ) and pipe rack in stream 1 & 2.
    - Study of method statement for spool installation and welding.
    - Adherence with the safety requirement at site laid by client.
    - Discussion with client and superior for technical problem.
    From March 2004 to March 2005
    M/s Bahwan Engineering Co. LLC.
    Position Held : Piping Supervisor
    Project : Qalhat LNG Project(Train 3)
    Client : M/s Chiyoda Foster Wheeler. Sur
    The Sultanate of Oman.
    - Fabrication and erection of piping spool and all type of support.
    - Spool and support (standard &special) erection for Main Cryogenic Heat exchanger.
    - Study of method statement for spool installation and welding.

    SIGNATURE
    - Adherence with the safety requirement at site laid by client.
    - Knowledge of material Specification Plant material and welding consumable.
    - Undergone training in flange Tightening , Temporary supporting method.
    - Discussion with client and superior for technical problem.
    From May 2003 to Jan 2004
    M/s Reliance Engineers Assts. (P) Ltd.
    Position Held : Piping Engineer
    Project : Vacuum Gas Oil, Unit-361 (Pre Shut Down)
    Client : Reliance Petroleum Ltd., Jamnagar, Gujarat , India.
    - Pre shut down and Maintenance works in refinery project.
    - All type of spool fabrication and erection with support.
    - Study of method statement for spool installation and welding.
    - Having experience for working in the highly potential hazard unit..
    - Hydro & Pneumatic , service test and box-up for piping system loop.
    - Discussion with client engineer and superior.
    From June 1999 to April 2003
    M/s PRV Engineering Co.
    Position Held : Piping Supervisor
    Project : RTF-MTF Pipe-way and Storage Tank Piping.
    Client : Reliance Petroleum Ltd., Jamnagar, Gujarat , India.
    - Fabrication and erection of piping spool and all type of supports..
    - Preparation of measurement sheet for sub contractor billing.
    - Progress and manpower report submission.
    - Study of all type of drawings including P&ID, Isometrics, GAD.
    From June 1996 to April 1999
    M/s Chatterjee Engg. Const. (P) Ltd.
    Position Held : Piping Supervisor
    Project : Reliance Petrochemical (Partially Oriented Yarn.)
    Client : Reliance Petroleum Ltd., Hazira, Surat, Gujarat , India.
    - Prefabrication of piping spools and erection.
    - Quality inspection of spools and dimensional check before welding..
    - U/G Piping Fabrication and laying.
    - Hydro, Pneumatic, Service test and box up of all A/G & U/G piping..
    From Oct 1994 to May 1996
    M/s Singh Engineering Co.
    Position Held : Jr. Piping Supervisor
    Project : National Fertilizer Ltd. (Expansion Project)
    Client : National Fertilizer Ltd. Guna M.P. , India.
    - Heavy structure fabrication for Urea plant.
    - Fabrication and erection of piping spools in Urea and Ammonia Plant.
    - Pipe alignment, support installation, flange box-up.
    - Line check for mechanical clearance as per client requirement.
    - Man Power controlling and scheduling for work assigned.
    - Report submission for material requirement and transportation to site.

    -------------------------------------------------------
    More Information about this submission and submitter:-
    ___________________________________________________
    Submission ID : 4386936
    Date & Time : 19th Jul 2011 6:57 AM (UTC)
    IP Address : 115.248.123.5
    Browser Info : Mozilla/5.0 (Windows NT 5.1; rv:5.0) Gecko/20100101 Firefox/5.0
    Predicted Country : India