www.anewa.in Engineering Pvt Ltd Hyderabad : Piping Stress Engineer / Piping Support engineer

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    www.anewa.in Engineering Pvt Ltd Hyderabad : Piping Stress Engineer / Piping Support engineer

    Position - 1
    Process design engineers

    Graduates in Chemical engineering with around 5/6 years experience in Oil& Gas related engineering company.

    Position - 2
    Rotating equipment design engineers

    Mechanical engineers with around 5 years experience in engineering of machinery design in Oil & Gas industry.

    Position - 3
    Piping Stress/ support engineers

    Graduates in Mechanical engineering with experience around 6 years, in stress and support design.

    Position - 4
    Piping designers

    Diploma in Mechanical/ ITI with not less than 10 years experience. Should have conceptual skill in piping layouts

    Position - 5
    Electrical design engineers

    Degree in Electrical engineering with 6 to 10 years experience.

    Position - 6
    Civil/structural design engineers

    Degree in Civil engineering with around 10 years experience.

    Position - 7
    Project Managers/ Project Engineers

    Degree in mechanical engineering with 6 to 10 years experience in project management.

    Position - 8
    Planning engineers

    Degree in Mechanical engineering with 5-6 years experience as planning engineer. Hands on experience in Primavera is must.

    About us :
    Anewa Engineering Pvt. Ltd. is an Engineering Design & Consultancy Company servicing the Oil & Gas, Petrochemicals, Refinery, Chemicals, Power Plant and Air separation industries. Anewa specializes in providing Multi-Disciplinary Engineering Design & Detailing Services that include Process, Mechanical, Piping, Civil and Structural, Electrical & Instrumentation, Project & Construction Management services.

    Contact us :
    Anewa Engineering Pvt. Ltd.
    13/1, Techno Enclave, Sector-1
    Hi-Tech City, Madhapur
    Hyderabad-500 081. A.P,INDIA.
    Email : careers@anewa.in
    Website : www.anewa.in

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CURRICULAM VITAE
    P.SUDALAI RAJAN
    Mail : sudalai1979 AT gmail.com

    OBJECTIVES :-
    Having more than 10years of experience in construction & projects execution in the field of Refinery, Chemical plant, Petrochemical and Oil & Gas Projects like as with exposure to piping fabrication and erection, fabrication and installation of structures, supports etc,.

    General Responsibilities :
    Planning and manpower controlling material handling, Co- ordination with client, Co-ordination with inspection. Technical support to team worker and following the protection rules and Regulation

    Professional Background :-
    - DME (Diploma in mechanical Engineering ).
    - Attended in several training related piping
    - H2S PDO Training
    - HSE PDO Training
    - PTW applicant(Permit to work)
    - HSE Tools &Skills
    - Safety leadership skills(SLS)

    Computer Knowledge :-
    - Auto cad R-14
    - MS Office

    Educational Qualification :-
    - Diploma mechanical engineering from MSP velayuthanadar polytechnic Tirunelveli in April 1999 with 76.4%
    - Passed 10th in MN Abdur rahmanHigher Secondary School-Tirunelveli with 82%

    Work Experience :
    Present Employment :
    At present I am working in Arabian industries L.L.C (Oman)
    Organization : Arabian industries L.L.C
    Muscat (Oman)
    Project : Amal off plot steam project
    Petroleum development OMAN (PDO)
    Designation : Field engineer piping
    Duration : 03/07/2010– Present
    Key Responsibilities.
    Nature of work :
    - Daily and Monthly Work Planning
    - Equipment planning like Crower /tire mounted
    - Mobilization of Material and Man Power to Site.
    - Work Schedule Preparation and briefing the work for Forman, supervisors
    - Daily Progress preparation and Monitoring.
    - Scope of work Amal east 41 kilometer off plot piping .
    - BOQ and Billing Study of Isometrics and P&ID drawings.
    - Hook up activities in well pad area.
    - Prefabrication of spools in well pad area
    - Erection of beam pump and selection manifold as per GA
    - Erection of oil production flow line , steam lines, service water lines ,and air lines as per drawings.
    - Involving all type of piping works by covering CS, LTCS, Alloy Steel, Stainless Steel Pipes and supports.
    - Supporting and alignment checking of pipe lines and equipments.
    - Applying work permits as per PDO standards
    - Monitoring Health and Safety Environment of the working area.

    past employment :
    I was working in Satnam global Infraprojects ltd. India
    Designation : piping engineer
    Duration : 25/02/2010-24/06/2010
    Project : Numaligarh Refinery ltd (NRL) ASSAM
    NATURE OF WORK : SHUTDOWN
    - S.s, cs pipe line fabrication, dismantling of fire water sprinklers system existing pipeline erection & pressure test for all pipe.

    Past Employment :
    I was working in Galfar engineering & contracting L.L.C (Oman)
    Organization : Galfar engineering contracting co SAOG with loss Muscat.
    Project : Harweel Cluster phase II upstream facilities.
    Petroleum development OMAN (PDO)
    Designation : piping engineer
    Duration : 18/9/2009– 21/12/2009
    Key Responsibilities :
    NATURE OF WORK : SHUTDOWN
    Pmc work and modification of HP and LP flare system.
    - Daily and Monthly Work Planning
    - Equipment planning like Crower /tire mounted
    - Mobilization of Material and Man Power to Site.
    - Work Schedule Preparation for forman,supervisors
    - Daily Progress preparation and Monitoring
    - MTO Query and Billing Study of Isometrics and P&I drawings
    - Erection of carbon steel, Ltcs, alloy steel, stainless steel, CRA pipes and supports in crude separation units.
    - Checkup fit up , dimensions ,orientations as per Iso.
    - Erection of service pipe, racks pipe, supports of pipe lines.
    - Pmc of Valves and loops as per test pack.
    - Reinstatement (Box up) of loops and valves.
    - Monitoring of Health and Safety Environment of the working area.
    - Supporting and alignment checking of pipe lines and instruments.

    Past Employment :
    I have worked in REAL Jamnagar An ISO 9001 : 2000 firm with a group of Reliance Industries Ltd.
    Organization : Reliance Engineering Associates Pvt. Ltd
    Reliance Industries Ltd., Jamnagar,
    Gujarat, INDIA.
    Project : JERP (Jamnagar Export Refinery Project)
    Designation : Construction Engineer (piping)
    Unit : Crude cracking unit 4 (CDU/VDU)
    Duration : 27/7/2007 – 31/7/2009
    Key Responsibilities :
    - Construction Engineer (Piping) for cross root refinery at Reliance Down Stream Refinery.
    - Involved in all type of piping (Unit, Rack, Track & U/G) works by covering all type (CS, LTCS, SS&AS).
    - Involved in Fabrication, Erection and Testing of various above ground process piping systems for CDU (crude cracking unit) in ISBL area. The total work volume of piping 100000 Inch-Meters.
    - Involved in underground piping execution for Fire water and oily water system in OSBL,ISPL area. The work volume was 12000 Inch-Meters
    - Involved in Site planning of Man Power, Equipment, and mobilization according to the priority.
    - Involved in preparation of site piping routing plan and updating the interface changes.
    - Involved in fabrication activities like Spool marking, fit-up & dimension alignment.
    - Preparing Spool erection sequence, Support erection sequence as per Project schedule.
    - Co-ordination with Quality team, sub contractors to keep project Progress as per schedule.
    - Preparing hydrotest plan and Pre Mechanical clearance and Box up (Reinstatement) as per test pack.
    - Preparing daily reports of various activities carried out at site and reporting Project control team.
    - Conducting Tool Box meeting every day and monitoring health, safety & environment in working place.

    Previous Employment :
    Concern : M/S PANDEY ERECTOR
    Project : JERP (Jamnagar Export Refinery Project)
    Designation : Mechanical engineer (piping)
    Working period : 06/04/2005-21/05/2007
    Key Responsibilities :
    - Material Control, Handling, Planning & Splitting of Activity and allotment to Contractor.
    - Fabrication and Erection of Carbon Steel, Alloy Steel, Pipe as per Approved Plan & Drawings.
    - Check the Fit up, Dimension & Orientation as per Engg , Standard.
    - Making structural support as per piping layout
    - Erection of Various Type of valves, Line checking, Pneumatic, Hydro Testing and Installation, PreCommissioning.
    - Execute the Shop Fabrication and Erection Activities to achieve the Target in the time.
    - Co-ordinate with QA/QC Engineers.
    - Preparing the Actual materials requirement as per Drawing & Design.
    - Check the Fit up, Dimension & Orientation as per Engg, Standard.
    - Coordinate with supervisors and Project Superidentent.
    - To provide effective supervision and quality of work as per specification.
    - Report periodically on the progress of work.
    - To provide effective supervision and quality of work as per specification.
    - Team Spirit, Regular Safety Meeting and Punctualities.

    Concern : Ganges International Pvt.Ltd, Pondicherry.
    Client : M/S DCW Limited (Dharangathara Fertilizer)
    Sahupuram, Tirunelveli dist
    Tamilnadu
    Designation : piping supervisor
    Working period : 16.09.2002 to 04.03.2005
    Key Responsibilities :
    - Proper site planning of the execution, considering the availability of work fronts.
    - Studying isometric and fabrication of Carbon steel, Alloy steel, utilities line pipes.
    - Material verification as per drawing and arrangement, after preparing the MTO.
    - Day to day spool fit up & checking alignment as per drawing.
    - Co-ordination with quality persons for NDT clearance & ready for dispatch.
    - Checking/clearing the sub-contractors bill as per drawing.
    - Educate the labours for proper house keeping & safety observance at site.
    - Knowledge about Process piping code B : 31.3 for construction of piping.
    - MOC (Material of Construction) of piping material.
    - Proper utilization and handling of P&M Machinery.
    - Involvement with Hydro test and Box up

    Concern : Auromac International Pvt Ltd, Pondicherry.
    Designation : Mechanical engineer (piping &structure)
    Working Period : 02.09.1999 to 05.08.2002
    Client : WORKED WITH NUCLEAR POWER CORPORATION
    INDIA LIMITED, as a MECHANICAL ENGINEER in
    Kudankulam, Tirunelveli (Dist), Tamilnadu.
    Key Responsibilities :
    - Production schedule preparation, Job allocation, Monthly production achievement, Quality Control and fit up checking as per iso &drawing.
    - Erection of cs and erw pipes as per iso.
    - Loop clearance as per loop file
    - Fabrication of Welded Beams, dome, Welded Boxes and Truss works.
    - Structural Fabrication & erection of Column, Welding Beams and Bracings on reactor building and auxiliary buildings.
    - Erection of civil steel structure, equipment structure.
    - Inspection Co-ordination of internal and other external Inspection Agencies.
    - Visual Inspection of the Weld orientation and Welding defects.

    Personal Profile :
    Father’s Name : P. Pandia Konar
    Date of Birth : 05-03-1979
    Gender : Male
    Marital Status : Married
    Nationality : Indian
    Religion : Hindu
    Language Known : Tamil, English & Hindi

    Declaration:
    I here by declare that the particular mentioned above are true to the best of my knowledge.
    Thanking you.
    Yours Faithfully,
    Place :
    Date: P.Sudalai Rajan

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    ARASIMMALU.J
    Email Id : narasimmalu_81 AT yahoo.com

    OBJECTIVE :
    To gain professional expertise by securing a promising position that offers both challenge and good opportunity for growth.

    ACADEMIC PROFILE :
    B.Tech Mechanical Engineering (2010) - Passed with 83% marks at S.R.M University, Chennai.
    DME (2001) – Passed with 70.5% of marks at S.R.M Polytechnic, Chennai
    HSC (1998) – Passed with 75.5% of marks at Nehru government Higher Secondary School, Chennai.

    RELATED SKILLS :
    Operating Systems
    MS DOS, Windows
    Drafting Software
    AutoCAD, Micro station, PDS
    Analyzing Software
    CAESAR II

    WORK EXPERIENCE :
    Having 10 years experience in the Engineering field.

    FINAL SEMESTER PROJECT :
    Design & Analysis of Boiler Down comer pipes
    During my project I was checked the stress, force& moment induced in boiler and also calculated using CAESAR II Build 5.10. Stress analysis was carried out in four load cases. Stressed induced on those cases were within the allowable limit. The stresses induced are satisfied with ASME B31.1

    PRESENT STATUS :
    Working as “Piping Designer” in Petrofac Engineering Services India Pvt Ltd. from Aug 2008 to till date.

    JOB PROFILE :
    - Preparation of piping layout
    - Preparation of P&ID MTO & Non P&ID MTO
    - MTO checking
    - Preparation of Civil Inputs(vessel platform, pipe rack section)