-
September 25th, 2010, 02:46 AM
Post Count Number #1
QA / QC inspector, Planning Manager : Saudi Arabia
An International Construction Company is looking for candidates for its operations in KSA for the following positions:
• Procurement Managers
• Construction Managers
• Technical Managers
• Planning Managers
• Cost Control Managers
• Chief Estimators (Building & Civil)
• Senor Engineers (All Discipline)
• Senior Quantity Surveyors
• QA / QC inspectors
Only qualified candidates with GCC experience may send their CVs to: syed@impregilo.com.sa
-
September 30th, 2010, 02:11 AM
Post Count Number #2
Re: QA / QC inspectors, Planning Managers : Saudi Arabia
-
October 6th, 2010, 11:27 PM
Post Count Number #3
Re: QA / QC inspectors, Planning Managers : Saudi Arabia
need further details of this post
-
May 14th, 2011, 09:59 PM
Post Count Number #4
E-mail : irfan_jounty AT yahoo.com
Muhammad Irfan (INSPECTOR QA/QC)
CAREER OBJECT
As a QA/QC INSPECTOR, Position in an organization that will benefit from my vast and versatile experience, capabilities, & contribution. I am especially interested in a position with the potential for advancement and increased decision-making responsibilities.
.
SAFETY ATTITUDE
Think safety, work safely
- Look & identify the hazards.
- Decide whom might be hard under what circumstances-
- Evaluate the risk involve in the work.
- Try to minimize the hazards.
- Always expect the unexpected
ACADEMIC CREDENTIALS
DIPLOMA OF ASSOCIATE ENGINEER (MECHANICAL POWER)
(PUNJAB BOARD OF TECHNICAL EDUCATION LAHORE)
Matriculation : Education Board of LAHORE.
CSWIP 3.1 : (ATTENDANCE)
LEVEL II (FROM AMERICAN SOCIETY OF NON DESTRUCTIVE TESTING)
DYE PENETRANT TESTING
MEGNETIC PARTICLE TESTING
RADIOGRAPHIC TESTING
ULTRASONIC TESTING
COMPUTER SKILL
- MS POWER POINT
- MS EXCEL
- MS WORD
- BASIC INTERNET
- IN PAGE
GRAPHIC AND DESIGN
1. COREL DRAW
2. ADOBE PHOTO SHOP
3. MICROSOFT POWER POINT
4. MACHROMEDIA FLASH
AREA OF EXPERTISE
Fabrications & Erection (Piping/Structure)
- Material inspection as per project specification and material test certificates.
- Inspection of pipe spool marking, pipe cutting, and joint fit-up as per approved construction drawings, WPS joint details and ASME B31.1/B31.3.
- Dimensional Inspection of pipe spools prior to welding and after welding.
- NDT control as per specification requirements.
- PWHT control for Low Alloy Steel Materials.
- Control of blasting and painting activities.
- Review of test packages.
- Line check prior to hydro testing and preparation of punch listing for piping test package and verification as well.
- Witnessing piping hydro testing, flushing as per procedure.
- Inspection of steel structural marking, cutting and fabrication per approved construction drawing.
Welding
- Inspection of welding consumable as per approved WPS.
- To verify the required equipment for welding, like welding machine, baking equipment, welding torch or holder, clamping, etc.
- To inspect backing of low hydrogen electrodes and handling of consumables.
- Witness of joint preheating, post heating and purging as required.
- Witness the welding activities.
- Visual inspection of completed weld joints.
- Issuance of inspection reports and arranging client inspection and NDT as required.
Mechanical
- Preparation & Review of method statements for equipment installations & erection.
- Visual inspection of foundation level, anchors, as per approved construction drawings.
- Visual inspection of equipments and verification alignments.
- Ensuring implementation of quality inspection plan (QIP).
- Blasting and coating inspection according to standard and client specifications.
- Review of test packages and witness the pneumatic testing, hydro testing / flushing & air blowing the pipe spools.
Non-Destructive Testing
- Performance and witnessing the Radiographic Testing, Penetrant Testing, Magnetic Particle Testing and Leak Testing as per ASME SEC V and project specifications.
- Taking Ultrasonic Testing thickness reading by using DM2 & DML.
- Witness the hydro testing for piping, tanks and exchangers.
- Preparation and review of NDT reports.
PROSESSIONAL EXPERIENCE
HARIS & COMPANY (PVT LTD)
Oil and gas project (Sep2010- to still)
POSTION; AS A QA/QC INSPECTOR.
Responsibilities :
- Inspection of Piping Spool Fabrication (Fit Up of joints &Orientation
- Preparation of QIP and Method Statements for above ground piping.
- Preparation of WPS from previously approved PQR’s
- Planning of Fabrication Shop Inspection and NDT activities.Preparation of Welder cards as per ASME Section IX.
- Preparation of WPQR as per ASME Section IX.
- Monitoring Fabrication and Welding activities as per ASME B31.3.
- Maintaining Record of Repairs and welder wise Penalty Shoots.
- Monitoring Spool releasing activities.
- Welding &Fit Up Inspection of steel structure all Fillet &Grove Welds.
- Maintaining Welding Inspection Summary as per received welding and
fabrication progress from Fabrication Shop.
DESCON ENGINEERING LIMITED.
Currently I am working with one of the largest and most reputed construction and Maintenance Company
DESCON Engineering LTD.Operating in Pakistan and Middle East with the leading Clients.
I have a working Experience of almost 4 years in the field of QUALITY CONTROLE.
DESCON ENGINEERING (PVT) LTD.
225MW COMBINED CYCLE POWER PLANT BHIKKI (JAN 2010 TO AUGEST 2010)
PROJECT NO. 1130
POSITION : AS A QA/QC INSPECTOR.
Responsibilities :
- Inspection of Piping Spool Fabrication (Fit Up of joints &Orientation
- Preparation of QIP and Method Statements for above ground piping.
- Preparation of WPS from previously approved PQR’s
- Planning of Fabrication Shop Inspection and NDT activities.Preparation of Welder cards as per ASME Section IX.
- Preparation of WPQR as per ASME Section IX.
- Monitoring Fabrication and Welding activities as per ASME B31.3.
- Maintaining Record of Repairs and welder wise Penalty Shoots.
- Monitoring Spool releasing activities.
- Welding &Fit Up Inspection of steel structure all Fillet &Grove Welds.
- Maintaining Welding Inspection Summary as per received welding and
fabrication progress from Fabrication Shop.
HARIS & COMPANY (PVT LTD) (Aug2008- to Dec2009)
POSTION; AS A QA/QC INSPECTOR.
Worked at workshop raiwind sundar road burhanpura Lahore Pakistan.
- . DESCON OXYCHEM LTD. Fabrication and Erection of H2O2 Plant ( APRIL 2008 to AUGEST 2008)
- Inspection of Piping Spool Fabrication (Fit Up of joints &Orientation
- Preparation of QIP and Method Statements for above ground piping.
- Preparation of WPS from previously approved PQR’s
- Planning of Fabrication Shop Inspection and NDT activities.
- Preparation of Welder cards as per ASME Section IX.
- Preparation of WPQR as per ASME Section IX.
- Monitoring Fabrication and Welding activities as per ASME B31.1. and ASMI B31.3
- Maintaining Record of Repairs and welder wise Penalty Shoots.
- Monitoring Spool releasing activities.
- Welding &Fit up Inspection of steel structure all Fillet &Grove Welds.
- Visual Inspection of Valves (Mechanical valves, Relief valves, control valves)
- Inspection and witness of Hydro Test of Valves, Vessel, Boiler, Exchanger, Economizer, Preheated.
SKILL
- I have developed great team building capabilities and can perform and show my best
Abilities in the most critical Situations and has ability to adjust in any kind of environment
- Know the psychology of the staff and can effectively control and utilize the manpower to
the best possible manner.
Posses’ good communication skills down the level and the level above.
- Well focused and fully aware of the scope of work given
EXTRA & COCURRICULAR ACTIVITIES
- Special interest of mechanical works
- Newspaper
- All rounder in Cricket.
INTEREST
- Efficient Communication between customers.
- Gaining knowledge of Latest Techniques.
NATURAL ABILITY
I can play cricket both hands ( left an d right hand). I have played at district and province level from school and college. Now a days I am playing from shaheen cricket club. I am also a good wicket keeper.
-
June 4th, 2011, 10:06 AM
Post Count Number #5
QA/QC INSPECTOR(WELDING)
VAIRAMUTHU.V
Professional Qualification : Diploma in Mechanical Engineering
Year of Passing : 2004
Technical Qualification : CSWIP 3.1 WELDING INSPECTOR
(Expiry 18 june-2015Certificate no :48019)
: ASNT LEVEL II in PT
ASNT LEVEL II in MT
ASNT LEVEL II in UT
ASNT LEVEL II in RT
COMPUTER KNOWLEDGES : MS Office, E-Mail & Internet System
OBJECTIVES :
To Work with dynamic and creative organization where I could share my skills and capabilities in challenging position of responsibility that would stimulate and give me an opportunity to work in your esteemed organization.
WORK EXPERIENCE : 7 Years
DETAILS OF WORK EXPERIENCE :
A) worked as a QA/QC inspector(welding) with M/s EPC-L.L.C – UAE since march- 2009 to 2011.
Projects : 1. Pipe Spools Fabrication for Lower Fars Pilot Project (Siwa Petroleum UAE)
2. Pipe Spools Fabrication and Erection for Deep Producer ,Fso Africa,Fso Asia,It is
conversion Ship project (Dubai Dry-docks World)
3.pipe spools Fabrication and Erection for polarcus ship,it is New Building
project(Dubai Dry Docks World
4 . Structural Fabrication for Kauther Gas Project
5. Pipe-rack structures for FPSO Vitoria.
6. Fabrication of rig Panel
7. Fabrication of cement plant Items (Pre-heater, Raw mill, Cyclone, Ducts.
& dampers .etc...)
Clients : 1. Galfar (Oman) / Petrofac / PDO
2. Saipem /DNV/GL/ Dubai Dry Docks
3. QGM Group / ABS
4. Gulf Cement Company Ras-al-Khaimah UAE
Responsibilities :
a. Qualification of welders as per AWS D1.1 & ASME SEC IX
b. WPS and PQR establishment as per ASME SEC IX.AWSD1.1.
c. Witnessing mechanical testing of test coupons.
d. Review material Test Certificates and welding consumable Batch Certificates.
e. Perform stage inspection per approved Inspection & Test Plans.
f. Monitor welding parameters per approved WPS.
g. Monitor welders’ performance.
h. Review of radiographs.
i. Maintain the documents as per ISO 9001-2000
j. Coordinate with Document Controller to prepare Final Dossier.
k. Piping fabrication and assembly as per Asme B31.3
l. Study of drawings, material inspection, electrodes storage monitoring.
m. Dimensions inspection after prefabrication (plate squaring, beveling, rolling)
n. Visual Inspection and Reporting of Piping Weld
o. Inspection of Installation Equipment as per P&ID
p. Monitoring of Material Traceability
q. Mechanical and NDT clearance prior to hydro testing
r. Review and Witness of Hydro Testing for the Pipe Spool,Re –instatement carried out for the test packs as per client requirements.
s. Coordination of site quality inspection with client.
t. Knowledge of executing all NDT activities(RT/UT/PT/MPI)
u. Follow up with third party inspection agency for all the NDT activities.
B) Worked as a Inspection Inpector M/s Airfoil Technologies International Singapore private Ltd – singapore from jan-2008 to dec-2008
Project :Airfoil blade repair.
Client : GE,Singapore air lines,indian air lines,jet air ways.
Duration : jan-2008 to dec - 2008
Responsibilities :
a. Study of drawings, material inspection
b. Final Welding Inspection of impeller blade.
c. Knowledge of Executing all NDT avtivities(RT/PT).
C) Worked as Inspection Inspector With M/s. Nest ndt services private Ltd- Chennai
– India from April-2006 to jan -2008.
Project : Napattinam to Narimannam pipeline project ...
Client :Indian oil corporation Ltd
Duration : April-2006 to Jan- 2008
Responsibilities :
a. Study of drawings, material inspection and monitoring.
b. Dimensions inspection after prefabrication (plate squaring, beveling, rolling).
c. Fit up inspection as per drawing.
d. Monitoring welders and welding parameters before, during and after welding.
e. Alignment inspection after welding.
v. Maintenance of records for all stage inspection.
w. Review and Witness of Hydro Testing for the Pipe Spool,Re –instatement carried out for the test packs as per client requirements.
D) Worked as a Inspection Engineer M/s nest ndt services private Ltd – India from may2004 to April-2006
Project : Cross country pipeline project (Chennai to Madurai)
Client :Indian oil corporation Ltd
Duration : May-2004to march- 2006
Responsibilities :
a. WPS and PQR establishment as per ASME SEC IX.
b. Welder performance qualification as per ASME SEC IX.
c. Study of drawings, material inspection, electrodes storage monitoring. .
d. Dimensions inspection after prefabrication (plate squaring, beveling, rolling).
e. Fit up inspection as per drawing.
f. Monitoring welders and welding parameters before, during and after welding.
g. Alignment inspection after welding.
h. Visual inspection, LPT inspection and radiographic films interpretation.
i. Mechanical and NDT clearance prior to hydro testing.
j. Maintenance of Records for all stage inspection
-
June 5th, 2011, 08:49 PM
Post Count Number #6
qc welding inspector
KUMAR PALANIAPPAN
thambi1978 AT rediffmail.com
Qc.1362 AT gmail.com
RESUME
Objective
A dedicated Qc Welding – Piping / Pipeline Inspector with successful track of 10 years experience in the field of Welding Inspection of Piping & Pipeline related facilities in Oil & Gas field, NDT and Documentation.
Educational Qualification : Diploma in Mechanical Engineering (First Class)
Professional Qualification
CSWIP 3.1
ASNT Certified accordance with SNT-TC-1A Level – II
Radiographic Testing
Ultrasonic Testing
Magnetic Particle Inspection
Penetrant Testing
Computer Awareness
Familiar with MS Word & MS Excel
Summary of Experience
As a QA/QC Welding Inspector, Experience in Fabrication, Maintenance, Shutdown, and Construction in Piping, Pipeline in Oil & Gas projects.
Review of ITP, WPS/PQR for Piping, Pipeline and Structural fabrication works.
Qualification of welders as per ASME Sec. IX, API 1104.
Interpretation of Radiographs as per ASME Sec. VIII, ANSI B31.3, API 1104 and AWS D1.1 and review of reports.
Witnessing of Destructive Testing and NDT of MPI, PT, UT and review of reports.
Inspection of materials and reviewing documents.
Preparation of Daily Welding reports, Weld Traceability Record, NDT co-ordination .
Witness hydro-test / pneumatic , PWHT.
Preparation of QA/QC documents, Test packs and final submission to customer for approval.
Preparation of As-Built drawing & Project dossiers
.
Preparation of punch list and follow up for close out
Raw Material Inspection, fit-up, dimensional check, weld visual, NDT, Hydro-test inspection for vessels, tanks and piping as per ASME, API, ANSI, BSI, AWS, etc.
Blasting, surface preparation and painting inspection as per the project spec and applicable code.
Employment History
Company : DUTCO Mc CONNELL DOWELL (ME) LLC, UAE
QA/QC ENGG – Since May 2004
Hands on Experience in Projects :
Diesel Fuel Oil Pipeline Phase-I & II
Client : Toshiba, DEWA
(Construction of 24” & 30” pipelines and associated facilities station piping)
‘L’ Station pipeline
Client : Toshiba, DEWA
(Construction of 26” pipelines and associated facilities station piping
Potline-7 & Cast House-3, DUBAL
Client : Dubai Aluminium Company
(Construction of Potline-7 & Cast House-3)
Hamriya port to sajaa Gas pipeline
Client : Crescent Petroleum LTD
(Construction of 30” Gas pipeline and associated facilities Station piping )
Laying Cross Country Jet Fuel Pipeline
Client : Emdad
(Construction of 12” pipeline, station piping, and equipment installation works)
Diversion of 10’’ fuel pipeline that include Hot tapping
Client : EPPCO
Margham Gas Plant Shutdown Works
Client : Margham Dubai Establishment
RAK Gas HDD Cross Country Pipeline works
Client : RAK Gas
Snake pipeline system upgrade that include Hot tapping
Client : ADNOC
Construction of 48” Gas Pipeline (Sajaa Gas Plant to Hamriyah Free Zone)
Client : UGTCL / EMRATH (Construction of 48” Pipeline and Station Piping
works)
Constructions of Ring Main1 Modification Project
Client : Dusup
Relocation of Emarat 14”Gas Pipe Line Include Hot tapping
Client :IPIC
Hamriyah Steel 10” Gas Pipe Line Include Hot tapping
Client :Hamriyah Steel,Emarat
Construction of 48” Gas PipeLine From GCS to DEWA Power Plant In Jebelali
Client : Dusup
BP/JV Tie-in –BP sajaa to 48” Emarat station
Client :UGTC
Job Description
Liaise with for day-to-day quality related activities of the contract.
Comply and implement quality system requirement.
Monitor calibration status of inspection, measuring & testing equipment used in the contract.
Maintain quality records as required by quality system.
Review / witness / WPS, PQR, WQT , quality control of welding and piping works.
Interpretation of Radiographs and Review NDT reports.
Stage wise inspection of pipe spools fabrication as per AFC drawing, visual inspection Of joint fit-up and completed welds, preparation of Daily welding reports & Weld traceability records.
Preparation of Test packs and final dossier submission to customer for approval.
Liaison with client , raising technical queries as required by project within project specification.
Inspection during the installation of static and Rotating equipments
Inspection of coating and wrapping, holiday testing, blasting and painting.
Company : BRIDGE AND ROOF CO. (INDIA) LTD
QA/QC INSPECTOR - Nov 2000 to May 2003
Job Description
- Material Inspection against certificates and dimensional inspection.
- Interpretation of Radiographs
- Checking of consumables used in welding to ensure compliance with specification. Checking of weld joint preparation and peripheral edge of flat plate.
- Witnessing the Welder Qualification Test (Renewal & Approval)
- Routine Inspection of Welding, Painting and related activities.
- Stage wise inspection of pipe spools fabrication as per AFC drawing, visual inspection for joint fit-up and completed welds, preparation of Daily welding reports & Weld traceability records.
- Witnessing pneumatic ,hydro and vacuum test for the Tanks witnessing hydro testing of pipeline and station piping
- Liaison with client technical queries as required by project within project specification.
Company : MECHCROWN ENGINEERS, COCHIN REFINERY LTD., KERALA, INDIA.
QA/QC INSPECTOR – June 2000 to Oct 2000
Job Description
- Welding Material Inspection against certificates and dimensional inspection.
- Check joint fit-up’s before welding
- Carry out weld inspection at all stages
- Execution of NDE subcontractors
- Interpretation of Radiographs.
- Review NDT reports.
- Witnessing Hydro Test.
- Coordinating and liaison work with customer / 3rd party inspectors.
- Preparation of stage inspection reports and final inspection documents at all stages.
- Documentation & Inspection Report Packages preparation.
-
June 15th, 2011, 10:47 AM
Post Count Number #7
pwht site incharge
Rana Shahbaz Ali Khan.
Email.
pwhtwork@gmail.com
rshahbazali@yahoo.com
(ACADAMIC QUILIFICATION)
Asociate Enginer
3 year Diploma (MACHENICAL)
Matric (science)
(INTREUST)
1) Chess play
2) Books Reading
3) Busnice Minded
(HSE TRAINING)
1) SSK
2) H2s
3) Work At Hight
4) Confind Space
5) Fire Fighting
6) Whole Wacher
(RESPONSIBILITIES)
Site Supervison of PWHT teem
Supervison of Electrical teem
PWHT Work Planing
PWHT Documentetion
Hardness Testing
Hardness Reports updating
TOTAL EXPERiENCE OF PWHT
\***( 18 YEAR's )***/
1) Pakistan Experience
13 year's
2) UAE Experience
6 Month
3) QATAR Experience
4 year's 6 Month
(My Experience detail)
* Engro chamical Envin 1.3 Dharki pakistan.
(QATAR PROJECTS)
4 years 6 month
Projects.
* Shell GTL
* AKG.II
* Olifen Onshor
* Doliphin Onshor
(QATAR SHUTDOWN)
35 Days
* Qatar Gas, DBN
(UAE PROJECT)
6 month
* Gasco Rauwess
(PAKISTAN PROJECT)
13 years
* Engro Chamical Dharki
* Sawan Gas Feild
* Parco Oil Refinry Multan
* FFBL Karachi
* Hubco Power Plant
* Kot Addo Power Plant
(PAKISTAN SHUTDOWN)
* Hubco Power Plant
* ICI PTA Plant
* OGDC PROJECT
* PRL
* NRL
Good Work with Safety
Thanks for Read my CV
Best Regard,
Rana Shahbaz Ali Khan
-
August 28th, 2011, 03:13 AM
Post Count Number #8
MUNIR AHMAD SHER MOHAMMED
E-mail, munir-ahmad AT live.com
SUMMARY
I am a highly trained and experienced Instrumentation Technician and Maintenance Planner, who is seeking a suitable position with a progressive organization where my skills would add value to its productivity, and in turn would achieve job satisfaction and career growth.
TECHNICAL CAPABILITIES & SKILLS
- Intimately familiar with various maintenance techniques, such as, CM, PM, CBM, and RCM.
- Complete knowledge of all aspects of routine and annual turn-around maintenance planning.
- Knowledge of latest Computerized Maintenance Management System (CMMS) and on-line Materials Management System.
- Extensive knowledge of Materials Specifications & related International Standards.
- Complete knowledge of Warehouse Management and materials stocking techniques.
- Hands-on experience of instrument calibration.
- Hands on maintenance experience of all major I+C field components of all major manufacturers, e.g., Alfa-Laval, Allen Bradley, Bentley Nevada, Bailey, Emerson, Foxboro, Honeywell, ITT, Kaydon, Keystone, MHI, Rosemount, Rotork, Siemens, SMART transmitters, Teledyne, Thermax, Valtek, Valden, Westinghouse, Yokogawa, to name a few.
- Excellent familiarity with all work related software such as, MS Word, MS Excel, and mainframe based system, etc. Ability to generate tables, charts, and reports.
- Ability to lead and train junior technicians. & planners.
WORK EXPERIENCE
* Ma'aden Phosphate Company, Ras Al Khair 2009 – present
* Working as a Planning Engineer in Planning Maintenance Department for Electrical & Instrumentation at Ras-Al Zawer
* Before start-up the plants I completed the following courses.
* ICT-011 Oracle Employee Self Service. Date 24 oct. 2009
* Completion of Asset Prioritization Workshop for Ammonia Plant. Date 13 January, 2010
* Completion of Asset Maintenance Task Validation Workshop. Date February 3, 2010
* Oracle Employee Self Service in Jubail Industrial City Karan Hotel. 28th of March 2010
* From 14 September Utilities, Ammonia & Power and Desalination Plants are on line. and other plants ( such as Sulphuric Acid Plant, Phosphoric Acid Plant and DAP Plant are still under commissioning.
* Now we are doing PM and CM Jobs for running plants.
Ghazlan Power Plant, Saudi Electricity Co., Dammam, Saudi Arabia 1983 - 2009
For the last 25 years I have worked at largest power plant in the Middle East, which comprises 8 steam turbine units with a total capacity of 4400 MW and 3 water desalination units with total capacity of 12,000 cubic meters per day. My work assignments were both in Maintenance and Technical Services Divisions of the Plant in the following capacities :
- Maintenance Planner / Scheduler (I+C) 1997 - 2009
As an Instrumentation & Controls Maintenance Planner, I am responsible for Corrective, Predicative and Preventive Maintenance of I+C equipment from the start of the electronic work order (in CMMS) until the completion for the work and its documentation. The job includes following activities :
Receiving the on-line work order, assessment for its correctness, and review with the concerned Operations staff and Engineering staff to categorize the maintenance.
Review of the work scope by making site visits and discussions with concerned people.
Resource allocation, including parts, materials, tools & equipment, manpower, time and work duration, special arrangements such as boundary isolations, and safety requirements, etc.
Prioritizing of the work orders based on the criticality, system redundancy, availability of resources, and safety/hazard issues.
Ordering of the required parts and materials through the company warehouse. If not available, coordination the procurement of the parts.
Follow-up of the work through its execution until completion, and closing of the work orders.
Ensuring that all data (planning, execution, man-hour & material usage, costs, etc.) are entered in the CMMS properly and on-time.
Maintaining the work backlog and issuing statistical reports to the concerned.
Issuing routine reports on work order statistics showing all Key Performance Indicators (KPI).
-
- Materials Coordinator (Instrument and Electrical) 1990 - 1997
As the Material Coordinator, I was in-charge of the in-Plant instrument and electrical storeroom, where I managed all parts and tools routine work in the Plant. My responsibilities included :
Controlling the flow of materials received from clients, company suppliers and ensuring delivery to the projects & worksites in accordance with the company policies and procedures.
To receive, inspect and store materials and deliver to the worksite according to the project schedule and in relation to the project’s safety and quality policies.
Managing the store inventory to optimum level, setting up the min/max levels, organizing the sore according to the type and usage of stocked items. Managing the electronic database of the inventory.
Communicate with outside vendors, the Company warehouse and the Plant Maintenance and Engineering Divisions on store and materials related issues.
Prepare technical specification, scope of work, and raising purchase request for new equipments. Also responsible to make technical evaluations for all offers from material suppliers.
Prepare scope of work and plan spare parts for annual turnaround maintenance.
- Sr. Instrument Technician 1983 – 1990
As a Senior Instrument Technician, I was responsible for the maintenance of major and critical plant instrumentation. My duties included :
Conducting routine PM work and planned CM work.
Troubleshooting of failed instruments and equipment – both in-situ and in the shop.
Filed repair, installation & calibration of key field instruments according to the industry standards.
Attending to instrument related Plant emergencies on short notices and staying on job until the problem is solved and emergency removed.
Training junior Saudi technicians.
ICI Polyester Plant, Sheikhupura, Pakistan 1981 - 1983
- Sr. Instrument Technician
As a Senior Instrument Technician, I was responsible for the maintenance of major and critical plant instrumentation. My duties included :
Conducting routine PM work and planned CM work.
Troubleshooting of failed instruments and equipment – both in-situ and in the shop.
Filed repair, installation & calibration of key field instruments according to the industry standards.
Attending to instrument related Plant emergencies on short notices and staying on job until the problem is solved and emergency removed.
Pak-Arab Fertilizers Limited, Multan, Pakistan 1978 - 1981
- Instrument Technician
My duties included :
Field repair\ installation of field instruments.
Respond to immediate calls for field instrument troubleshooting.
Periodic calibration of field instruments & communication boundaries.
EDUCATION
Associate Engineer in Electrical Technology
Government College of Technology, Multan, Pakistan
TRAINING & CERTIFICATES
- CMMS ( Oracle Maintenance System & Warehousing System ( Two Modules Interlinked)
- CMMS (Avantis System) Training Course
- Westinghouse Electro-Hydraulic Control System Maintenance Course
- Automatic Boiler Control with Bailey 820 System Course
- Plant Safety Course
- FOXBORO Training Course (Fundamentals of Pneumatic and Electronics Instrumentation)
- Certification of TQM Techniques (Team Leaders & Members)
- First Aid Training Certificate
-
December 8th, 2011, 12:21 PM
Post Count Number #9
CURRICULUM VITAE
ALI IMRAN KHAN
E-MAIL :erimrankhan AT yahoo.com
Post applied for ;
Career summary ; A mechanical engineer graduate with over 8 years of extensive professional experience in EPC contract with working knowledge of various codes& standards ANSI B313 B314 B318 AWS 9000 90001 14001
Involvement in permit to works system, health, safety, environmental, management risk assessment, Risk control, Hazard identification, incident/Accident analysis, safety auditing with a direct hands on approach to analytic problems solving en compassing excellent leadership & management capacities
Profile ; A hard working meticulous engineer with sound technical knowledge looking exciting opportunity in world class organization with burning desire to achieve newer human excellence with conjunctions of organizational goal where my interest & knowledge in piping/pipe line project could be best utilized and justify my potential to establish myself as a competent person. Able to use own initiative with strong communication skill
EDUCATIONAL QUALIFICATION
* BACHELOR OF ENGINEERING
(INDUSTRIAL &PRODUCTION)
First class with distinction
COMPUTER LITERACY * MS Office ( MS Word, MS Excell )
EXPERIENCE IN GULF.
DOHA : FROM APRIL 2006 TO MARCH 2010
DESIGNATION : PIPING SUPERVISOR
COMPANY : CONSOLIDATED CONTRACTORS INTERNATIONALCO
MAIN CONTRACTOR : CHIYODA – TECHNIP JOINT VENTURE
CLIENT : QATAR GAS LTD.
PROJECT EXECUTION : QATAR GAS II DEVELOPMENT FACILITIES PROJECT
TRAIN IV, V, VI & VII
Duties and Responsibilities :
- Review of Plot Diagram, GAD, P&ID, and Isometric, Equipment, GAG and detail fabrications.
- Preparation of MTO as per required drawing.
- Site supervision and implementation of the job as per drawing and specification of the project.
- Assign the work to site supervisor in accordance with company policies and procedures and ensure organizational forecast and budget.
- Undertake Q.C relating interaction with other department of company and client to assure production schedule.
- Conduct contract review meeting, identify potential problem areas and prepare technical query report and Propose solutions/alternatives where applicable
- Assist the construction manager in preparation of sub contract agreement and to recruit people for his area of discipline.
- Overall planning of the discipline work and coordination with other discipline in the same area.
- Confirm and full implementation that work complies with quality, safety/health and environment and work with the subordinates in case of problems.
- Monitoring/coordinating test packs activities from the initial preparation stage to final certification stage.
- Coordinate and meeting with the client to resolve the problem in order to increase the production and quality of work to achieve the target and release the test pack.
- Familiar with A.S.M.E, A.P.I. A.N.S.I and Welding specification.
- Co-ordination with the Structural,Equipment and Civil Dept.to maintain the uniform work.
- Prepare weekly work schedule and look ahead. Update and report project progress on a weekly basis, review and take necessary action to keep the project on schedule.
- Weekly review of Project activities along with Client, Project management team/Construction team, Engineering, safety and QA/QC Personnel
- Coordination with the field supervisor to short out the technical query as per the code and standard and helping them to find out best possible solution without violation of code and standards.
- Coordination with warehouse to find the current status of materials.
- Attend Daily/weekly meeting with client regarding daily activities and progress.
- Daily/Weekly meeting with the site supervisors in order to resolve the problem and increase the productivity.
EXPERIENCE IN INDIA
COMPANY : M/S SUPREME HITECH ENGINEERING
CLIENT : HINDUSTAN SHIPYARD LTD
POSITION : MECHANICAL ENGINEER
DURATION : NOV 2003 TO DEC2005
PROJECT- LEG BRACING RENEWAL OF RIG SAGAR-SAMRAT OF M/S ONGC OFFSHORE.
PROJECT-CPI PLATE FOR PWC-02 NOS, SCA PLATFORM.
PROJECT-REPLACEMENT OF COOLING WATER LINE AT BHS PLATFORM.
RESPONSIBILITIES,
- Site supervision and implementation of the job as per drawing and specification of the project.
- Allocation the work to the supervisor and foreman.
- Inspection of welding electrode and welding quality.
- Coordination with the field supervisor to short out the technical query as per the code and standard and helping them to find out best possible solution without violation of code and standard.
- Preparing field material requisition.
- Coordination with ware house to find the status of material.
- Preparing Data sheet and tracking material against utilization and balance status.
- Coordination and attending meeting with client to resolve the site problem.
- Preparing daily work report and claim for extra work.
- Direct supervision of the work force to increase the productivity and control the idle time.
- Planning for shut down activities and coordination with planner to develop the best schedule.
Developing proper sequence of activities to reduce the time frame of shut down
Project Co-ordination, project planning, execution.
Preparation of QAP/PQR DOCUMENTS
COMPANY : M/S SAFFINA INDUSTRIAL PROJECT CO PVT LTD
CLIENT : THERMAX BABCOK & WILCOK LTD,PUNE
POSITION : PRODUCTION ENGINEER
DURATION : DEC 2001 TO OCT 2003.
PROJECT
FABRICATION OF WATER TUBE BOILER UNIT,PRESSURE VESSELS,COULUMNS,FURNACES,TANKS,& PIPING.
JOB’S RESPONSIBILITIES.
- Check and approved the technical specification of the material being received.
- Varify details drawing which includes piping spools and assembly.
- Fabrication and erection of Piping (C.S, A.S and S.S Piping) and Piping supports .
- Preparing and submit work completion report to the work manager.
- Preparation and submission of project record book to the client upon the completion of entire boiler
Execution of fabrication of cs ss piping spools of different boilers with GTAW,SMAW welding process
Front analysis
Co- ordination with planning& material department
Achievements : Appreciation certificate from Qatar Gas II LNG project for completion of Qatar Gas 3&4 LNG project