Production Planning Control Engineer PPC : Resume CV

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    On probation
    Join Date
    September 20th, 2010
    Location
    bhilai, chattisgarh
    Posts
    1

    Production Planning Control Engineer PPC : Resume CV

    CURRICULUM-VITAE :

    PROFILE :
    Sr. Manager with over 14 years of experience including projects in the power industry. Expert at problem-resolution, planning and managing projects from inception through completion. Experienced in supervising all levels of technicians, engineers, and craft and in building relationships with international teams of managers and staff. Excellent oral and written communication skills.

    Areas of expertise comprise the following :
    Project and Site Management Rotating Equipment
    Supervision Installation and Commissioning
    Planning and Development Repair and Maintenance
    Construction Projects

    PROFESSIONAL EXPERIENCE :
    Company A :Beekay Engineering Corporation (Head Office, Bhilai) Duration:November 2006 - Present
    Brought in as a Deputy Manager for Production Planning and control specialist in planning to provide project management and engineering support. Responsible for project development, equipment selection, contractor evaluations, and supervision. Provided technical assistance, quality control, and direction to craft in relation to the systems, Coke Oven, Kiln & Cooler, Desulphurisation & Quenching Car from installation through commissioning and release to the client. Coordinated craft needs for both construction and commissioning to keep mechanical projects on schedule and within budget. Advised executives and the Corps of Engineers on staffing and equipment requirements.

    Activities :
    . Planning of Raw material, Special Purchase with ERP (IFS-Advanced planning software)
    - Providing Shop order, Purchase Requisition, Routing, & Scheduling etc.
    - Maintain total transparency & very high moral image of self & company.
    . Segregation of drawings for manufacturing of parts in-house or offloading.
    . Approval of QAP.
    . Correspondence with client.

    Projects :
    Quenching Car for Rourkela Steel Plant
    SAIL Manager :(January 2008)
    Oversaw construction of car from fabrication to client acceptance. Installed car at site. Project was completed on time and within budget.
    Desulphurisation Assembly Unit
    Deputy Manage (September 2007 – November 2007)
    Oversaw construction of Desulphurisation from fabrication to dispatch.
    Kiln & Cooler of 350 TPD & 500 TPD Sponge Iron Plant
    Deputy Manager (February 2006 – August 2006)
    Oversaw construction of Kiln & Cooler from planning to fabrication.
    Coke Oven, Bhilai Steel Plant
    Deputy Manager (February 2006 – August 2006)
    Oversaw construction of Quenching System, Vapour Spray Pump House, Condensate Pump House, Mechanical Decanter from planning to fabrication. Dispatched at site.

    Company B:Ispat Industries Limited, Mittal Group, Dolvi, Mumbai
    Duration :January 2004 – October 2006
    Contract Engineer, Sinter Plant,(Esp and Rotating Equipment)
    Planned the new construction & erection of 5 nos. Electrostatic Precipitator, 5 nos. ID fan, & duct. Provided technical support, quality control, and direction to staff in relation to ESP and rotating equipment for installation through commissioning. Planned, prioritized, and staffed projects at the site level. Responsible for project development, contractor evaluations, and supervision. Also performed equipment costing and labor estimation for fiscal budget. Oversaw work of approximately 50 rigger, 10 fabricators, 40 welders, and up to 5 engineer of CFMCC, MECC (China). Managed and directed mechanical subcontract work including equipment and contract evaluation. Assumed responsibility for increased scope of project to include completion of duct and structure. Completed all work within scope on schedule and within budget. Complete project budget totaled approximately 400 crore.

    Company C: Thermax , Pune (Head Office) January 2002 – December 2003
    Project Engineer, (Coal Injection System, Bag filter, Esp, & WHRB)
    Supervised the new construction & erection of Waste Heat Recovery Boiler, Electrostatic Precipitator, Pulse Jet Bag Filter, & Coal Injection System (ID fan & Exhaust fan etc). Oversaw work of Vendors. Managed and directed mechanical subcontract work. Completed all work within scope on schedule and within budget. Completed all projects.

    Projects :
    WHRB & ESP, BHUSHAN Steel, Jharsguda
    Supervised the new construction & erection of Waste Heat Recovery Boiler of 200 MW, Electrostatic Precipitator Managed and directed mechanical subcontract work. Oversaw work of Vendors. Managed and directed mechanical subcontract work. Not completed the project.
    ESP, SMC Sponge Iron Plant, Jharsguda
    Supervised the new construction & erection till commissioning of 2 nos. Electrostatic Precipitator.
    Coal Injection Plant, & Bag filter, TISCO, Tata, Jamshedpur
    Oversaw fabrication work of Inlet, Outlet Nozzle, & Hoppers etc of Bag filter for Lime Calcining Plant from fabrication to client acceptance. Installed ESP at site. Project was completed on time and within budget. Also Oversaw Installation of Mill MPS 140 in G- blast furnace. Handled 2 Millwright fitter, 2 fabricators, 4 fitter, & 10 welders at site

    Company D : Rollmac Engg Corporation, Bhilai (Head Office) March 1999 – December 2001
    As the dedicated Steamplant Engineer, engineered and coordinated capital projects and maintenance upgrades. Responsible for project development, equipment selection, contractor evaluations, and supervision. Also performed equipment costing and labor estimation for fiscal budget. High profile projects included the WHRB 200 MW and the refit of the ABB ABL Boilers. Coordinated craft needs for both construction and testing to keep mechanical projects on schedule and within budget. Advised technician and the staffs for equipment requirements.

    Projects :
    WHRB 100 MW, Monnet Ispat, Raipur-Consultant Thermax, Pune
    Supervised the new construction & erection of waste heat recovery boiler till radiography & pressure testing. New construction includes erection & welding of Preheater tubes, Economiser and Heavy duty pipes. Handled 15 Pipe fitter, 10 IBR welder, 15 welders, 10 Rigger, & 20 Helper at site
    WHRB 200 MW, Chachai Thermal Power Station, Chachai, Amarkantak- Consultant ABB ABL Kolkata
    Refurbishment of Pipes & Valves. Refurbishment includes dismantling, erection, radiography, & Pressure testing of pipes from Pent house. Dismantled valves and erected new valves. Oversaw total erection work of pipes & valves at site. Complete project involved boiler, tube repair, overhaul of soot blowers & fly ash system. Project was completed on time and within budget. Handled 10 Pipe fitter, 5 IBR welder, 5 welders, 8 Rigger, & 15 Helper at site
    Previous Professional Experience July 1997 – February1999
    - Experienced in fabrication works of structures. Also experience in planning for Raw material required at site.

    EDUCATION/CERTIFICATIONS :
    * PG Dip in Production Management Delhi/MSPI (Correspondence)
    * Diploma in Mech Engg from MP Board of Tech Education Khurai, Sagar
    * Senior secondary examination (XIIth) M. P. Board
    * Secondary school examination (Xth) C.B.S.E Board

    COMPUTER SKILLS :
    AutoCAD 12, Diploma in Computer Application (IICE) -Microsoft Office (Word and Excel), MS-Project, and IFS –ERP Planning software.

    PERSONAL PROFILE :
    DATE OF BIRTH : 17 JULY 1974
    LANGUAGE KNOWN : ENGLISH, HINDI, BENGALI

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    resume modal

    Jimmy Freeney
    Email : freeney.jimmy AT yahoo.com

    Career Profile
    :
    To take up the responsibilities of a Mechanical Engineer where I can make effective use of my mechanical knowledge in a highly and efficient manner

    Professional strengths
    :
    Extensive knowledge of designing, using, repairing and maintaining machines and tools
    Possess excellent decision -making and time management skills
    Ability to solve complex problems by using scientific rules and methods
    Extensive knowledge of designing techniques, tools, and principles involved in production technical plans, blueprints, drawings, and models
    Possess comprehensive knowledge of circuit boards, chips, and electronic equipment
    Excellent knowledge of mathematical concepts with good command over verbal and written communications
    Familiar with quality control, production processes, costs, and techniques for increasing effective manufacture and distribution of goods
    Ability to work under pressure and handle multiple tasks

    Technical Skills
    :
    Expertise in Windows, PowerPoint, WordPerfect, Word, Westlaw, Lexis-Nexis, Lotus Notes and Excel
    Highly skilled in Auto Card

    Educational Summary
    :
    Master's degree in Mechanical Engineering from University of New York in the year 19XX
    Bachelor's degree in Mechanical Engineering from College of Engineering, New York in the year 19XX

    Career History
    :
    ABL Mechanical Co Inc, NY 19XX to 20XX
    Mechanical Engineer :
    Assigned the tasks of reading and interpreting blueprints, computer generated reports, technical drawings and schematics
    Responsible for implementing operating procedures, resolving system malfunctions, and providing technical information
    Handled the tasks of diagnosing faulty operation, and make necessary recommendations to the maintenance crew
    Provided feedback to design engineers on customer problems and requirements
    Performed the tasks of installing, operating ,maintaining , and repairing to ensure smooth functioning of machines and equipment
    Conducted research to tests and analyze the feasibility, operation, design, and performance of equipment, components and systems

    Greaves Tech, NY 19XX to 20XX
    Mechanical Engineer :
    Handled the tasks of planning and designing machines, tools, engines and other mechanical equipment
    Responsible for supervising operation, maintenance, installation, and repair of the equipment
    Conducted research as well as developed and designed test mechanical devices like tools, engines and machines
    Assigned the tasks of testing the equipment ensure that the product meets the standards of performance, cost, quality and cost
    Estimated costs and submitted bids for construction, engineering, and prepared contract documents
    Designed test control apparatus and equipment as well as developed procedures for testing products

    Declaration
    :
    The information provided above is true to the best of my knowledge