Electrical Manager, Uganda / Kenya : Cement Industry -
Manager - Electrical - Cement Industry - Uganda / Kenya
Should be a B.E. / Diploma - Electrical with 08 to 10 years experience in cement industries. Operational and maintenance planning of department to improve day to day activity. Manpower planning for operation and maintenance.
Analysis of break down & reduce break down time. Root cause analysis of break down. Inventory control & material planning for availability of spares in plant. New project related to plant improvement. Reduce production cost by implement of new idea.
Interested Candidates Can email their resumes for interview Purpose.
Email - primeplacement@sify.com / primeplacementahmedabad@gmail.com
Ph - 079 - 65134568 / 9898165778 / 9377765778.
Job Location is Only Uganda / Kenya.
Visit www.primeplacement.org / www.ppmsjobs.com for other Job Requirements.
Prime Placement & Manpower Services
# B - 5 JAYRAJ COMPLEX, SECOND FLOOR, SONI NI CHALI 4 RASTA, ODHAV ROAD, AHMEDABAD- 382415
PH - 079 - 65134568 , 98981 65778.
# B - 2,3 SARITA COMPLEX, B/H. JAIN TEMPLE, OFF-C.G.ROAD, NAVRANGPURA, AHMEDABAD-380009.
PH - 93777 65778.
Email- primeplacement@sify.com , primeplacementahmedabad@gmail.com , primeplacement@gmail.com
Web - www.primeplacement.org / www.ppmsjobs.com
-
June 14th, 2011, 07:22 PM
Post Count Number #2
ENG
Dear all
I had 1 year working as senior engineer in Russia by Strabag co. for Vyksa steel factory ( 400 M euro )
I had 6 months working as projects manager Alex co. as subcontractor for Khd co. in Libya Libian cement plant ( 38 M euro )
I had 3 years working as subcontractor in Greece
I had 10 years working as consultant electrical and instrumentation eng. ( Egypt – Europe – Africa – Asia ) by Asec co for cement factories
I had experience of 23 years working as electrical engineer
Arabic , English ,Greek , Russian , French and German languages
I had 1 year working as projects manager for Egyptian co. for projects and trade in Egypt in Titan benisuif cement plant , Misr benisuif cement plant and South of Valley power station by Siemens co.
Thanks for your interest
With my best regards
Eng. Fekry Saad
fks.saad@hotmail.com
FKS6666@SKYPE
-
July 14th, 2011, 02:56 PM
Post Count Number #3
Position Sought : Senior Electrical Designer / Electrical Design Engineer / Electrical
Engineer / Electrical Commissioning Engineer / Electrical Inspector
Total experience - 25 years, specially 10 years in cement industry & balance in contract division at errection & commissioning of major heavy industries from 11 KV to 110 KV substation.
Last Worked as Managerial grade Chief Planning & Maintenance Engineer (Electrical) in Ahlia Cement Company, LIBYA from 01.11.2006 to JUNE 2009.
PRESENLY WORKING WITH CEMENT PROJECT SERVICES MANAGEMENT SERVICES& CONSULTING GROUP,U.K. WORKS AT SYRIA, AL BADIA CEMENT PROJECT ( 5000 tpd)
1.6 MILLION TON WITH CAPTIVE POWER PLANT 44MW AS PROJECT ENGINEER ELECTRICAL WITH EMOLUMENTS
2500 EURO MONTHLY +FREE FOOD, FURNISHED ACCOMADATION TRANSPORTATION ETC.
Career Objective :
To pursue a career in Electrical Engineering especially in the field of designing or project management and contribute positively by using my knowledge and lessons learned/gained from years of extensive and solid experiences in electrical design and construction in the CEMENT Plants, oil and gas, petrochemical and infrastructure (high rise) sectors.
Key Competence :
- Detailed design of power distribution system, cable sizing, MV & LV switchgears, motor control center, lighting, lightning protection system, grounding system, electric heat tracing, fire alarm system, lighting illumination calculations, tray layouts, etc.
- Familiar with electrical systems case studies for Load Flow, Short Circuit/Fault
Calculations, large motor start-up using PowerStation ETAP software.
- Familiar with NEMA, ANSI, IEEE and IEC based electrical codes, standards and regulations.
- Experience in field inspection and acceptance testing of electrical equipments.
- Development of power system single-line diagrams and cable and conduit schedules.
- Preparation of cable tray fill and conduit calculations, etc
- Design physical layout of electrical equipment, raceway and grounding plans.
- Preparation of cable and raceway routing layouts.
- Project execution and supervision.
- Material quantity estimating.
- Producing of material technical specification.
- Conducted electrical inspections and tests on electro-mechanical equipment such as transformers, motor control centers, switchgears, motors, motor drives and power cables
-Designed power distribution systems involving cable ampere ratings, cable voltage drops, motor and motor drive sizing, sizing of electrical protective devices, lighting, and industrial controls
- Designed circuits to facilitate fluid-level and pressure controls for motor starter equipment via ladder logic schematics
- Analyzed and interpreted electrical controls and power schematic drawings to facilitate system installations and upgrades
- Developed electrical facility layout drawings using Autocad software
- Performed electrical power demand analyses on electrical facilities
Special Knowledge Acquired during Professional Duties
Complete Installation, Erecting, Commissioning of Any Equipments both HT / LT Complete In any type of Industry like Cement , Steel, Sponge Iron, Textiles & Wind mills etc. and 11 KV / 110 KV substation maintenance.
Testing and commissioning of relays of 11 KV,33KV and 110 KV substations.
Vast experience in Project, Complete Maintenance & Planning activities of Cement Industry both VSK & ROTARY Kiln.
Tender preparation, Computerised Planning , drawings related to any Project
including design & calculation of complete electrical system.
( Recently the renovation Project of complete cement plant Substation including new transformer 2 x 35 MVA, 31.5 KV / 6.3 KV in AHCC cement plant, Libya and 4600 TPD cement plant complete unit project at Nalout, LIBYA.
Computer knowledge : WINDOWS 2007 / VISTA PREMIEM M.S.OFFICE2007,M.S.PROJECT,VISIOPROFESSIONAL, AUTOCAD 2009 & INTERNET 8.
Up - dating of I.S.O Document as per ISO 9001 -2000.
Maintenance report & Shut down of cement plant as planning , Inspection & preparation of Reports to the higher authorities.
Additional Remarks
(List major achievements)
1. Successful Implementation of ISO Systems.
2. Successful Implementation of Process, Maintenance activities &Planning in Cement Industry.
3. Skilled in short out any type of Electrical problems & consulting knowledge.
4. Well experience in Modification of Electrical control circuits & Testing of relays.
5. Installation, Erecting & Commissioning work of Any Equipments both HT / LT Complete In any type of Industry like Cement , Steel, Sponge Iron, Textiles & Wind mills etc.
6. Specially in schematic Electrical drawings Both New & Modification of the system .
7. Successful Implementation of Energy monitoring & management Systems.
Personal Data
Name : P.SARAVANAN
Permanent Address : North street,
Punelveli,
Pottalpatti (P.O),
Rajapalayam (TK).
Tamilnadu , India.
Present Contact mobile No. +919150334910
E mail : saravanan_sri2004 AT yahoo.co.in and gvss05 AT rediffmail.com .
Height (Cms) : 159 Weight (Kgs) : 50
Nationality : INDIAN Place of Birth : Srivilliputtur Date of Birth : 25.08.1967
Marital Status : MARRIED Religion : Indian
Passport Nr F 0917043 Issued at Trichirappalli on 06.10.2004 Validity 05.10.2014
ü
Emigration Clearance Status : Required/ Not required (Tick the correct status)
Academic Record
Schools/
University Place From To Examinations, Diploma & Thesis % Marks Division
G.S.Hindu Higher Secondary School Srivilliputtur 1982 1983 SSLC 81%
P.A.C.Ramasamay Raja’s Polytechnics. Rajapalayam 1983 1986 Diploma( DEEE) 80%
Details of Dependants
Employment Records
S.No. Employer’s Name & Address Designation Kind of Work Period
Last Salary Drawn
Per month
From To
1. CEMENT PROJECT SERVICES MANAGEMENT SERVICES& CONSULTING GROUP, U.K.
WORKS AT SYRIA,
AL BADIA CEMEN T PROJECT.
( 5000 tpd) 1.6 MILLION TON WITH 44MW CAPTIVE POWER PLANT 8MW x 5Nos. And 4MW x 1 no. Project engineer electrical Project site supervision and Project management of Electrical contractors in all aspects related to execution of electrical equipment installation
Review of Engineering drawings and Quality control plan and process control and equipment manufacture QA/AC Review and Monitoring of (8MW x 5 and 4MW x 1) 44MW Power plant erecting, commissioning by WARTSILA ENGINES
FEB2010 Till 2500 euros
2 AhCC Cements Ltd., 3000 T.P.D.
Souk El Khamis, LIBYA.
Chief Electrical Engineer
(Planning & Maintenance) Complete In charge of the Plant Modifications, Maintenance and operation in Electrical Section. Maintenance report & Shut down of cement plant as planning , Inspection & preparation of Reports to the higher authorities. renovation Project of complete cement plant Substation including new transformer 2 x 35 MVA, 31.5 KV / 6.3 KV in AHCC cement unit and 4600 TPD cement plant complete unit project at Nalout, LIBYA
01.11.
2006 June 2009 2500$ -/
(US Dollars)
3 Vision Electro mechanical LLC.
Ras Al Khaimah UAE. Electrical engineer Complete In charge of the Shut down work at Ras Al Khaimah Cement Company, UAE.
Aug.2006 Oct.2006 5000 /
UAE Dirgams
4. J.K.Avtar Cements Ltd.,
1500T.P.D Assam, India. Chief Electrical engineer Complete In charge of the Plant Modifications, Maintenance and operation in Electrical Section.
Oct.2004 June 2006 20,000-/
INR
5. Rajapalayam Cements & Chemical (P) Ltd, 1500 T.P.D Tirunelveli dt. India. Electrical engineer Complete In charge of the Plant Modifications, Maintenance and operation in Electrical Section. Nov.2000 Oct.2004 15,000/-
INR
6. Valli Electricals ESA Contractors, Rajapalayam. India. Electrical Manager Errecting, installation & Commissioning of HT/ LT Switchgears, Transformers and related Electrical works. Tender preparation,Computerised Planning , drawings related to any Project including design & calculation of complete electrical system. 1996 1999 8,,500/-
INR
7. P.A.G. Electricals ESA Contractors, Rajapalayam. India. Electrical Site
In- charge Errecting, installation & Commissioning of HT/ LT Switchgears, Transformers and related Electrical works. Tender preparation,Computerised Planning , drawings related to any Project including design & calculation of complete electrical system. 1993 1996 6,000/-
INR
8. Vijay Spinners Ltd,, Rajapalayam. India. Electrical Supervisor Errecting, installation & Operation & maintenance of Textile unit. 1989 1993 5,000/-
INR
9 Sri Ramachandra Medical College & Hospital, Porur.Chennai. India. Electrical Supervisor Operation & maintenance of Hospital & College. 1986 1989 4,000/-
INR
Employment Record (Contd.)
Present Emoluments in EUROS Per month
Basic 2500/ Magazine/Newspaper FREE
Dearness - Electricity Free
House Rent Free Furnishing Free
Conveyance Free Telephone Free
Lunch Subsidy Free Bonus -
City Compensatory Free Medical Free
Entertainment FREE LTC FREE
TAX FREE Total 2500 EURO
Company's Contribution to :
Provident Fund p.a.
Superannuation p.a. One month salary
Pension (Yes/No) --
Gratuity in days of Salary/Yrs of service -
In last function since : PROJECT Electrical Engineer
Who is your direct superior : PROJECT MANAGER (Function/Designation)
Minimum Time to Join : Immediate
Present Salary : 2500 EURO
Expected Salary (Negotiable) : 5000 USD
FREE Family Accommodation + Food + Local Transport and other benefits
as perrules.
Availability : ASAP
PLEASE CONDUCT TELEPHONIC INTERVIEW .
Present Contact mobile No. + 919150334910
Responsibilities Of Chief Electrical Engineer In AhCC Cement Industry
Complete day by day maintenance & planning activities in Electrical section of Rotary Cement plant of ISO 9001 – 2000 Certified Company, Plant capacity –3000 TPD.
a). Maintenance of 31.5 / 6.3 KV Substation
Including overhauling, testing & calibration of Relays, Transformers.
Maximum demand - 45 MW.
Three nos. of Transformers – 17.3 MVA 31.5 KV / 6.3 KV
One Lime plant transformer – 10 MVA 31.5 KV / 11 KV
14 nos of Distribution Transformers – 2 MVA 6.3 KV / 0.4 KV.
b). Maintenance of 31.5 / 6.3 KV OMCB 2500A Switchgears and Lime plant 11 KV VCB 1600A Switchgears in the Substation.
c). Maintenance of 6.3 KV HT Slip ring motors min 410 KW to 2100 KW.
d). Maintenance of 380V LT Star / Delta & DOL Starter type motors 230 KW. & DC drive motors 230 KW.
e). Maintenance of 380V LT Motor Control Centres & DC Thristor Panels.
f). Maintenance of PLC systems in Electro static Precipitator systems & Pulse jetFilter systems & Pfister Weigh feeders system.
g. Maintenance of PLC systems in Ventomatic Automatic Electronics Roto packer System of 120T / hr. of packing plant.
2. Complete Renovation of Electrical substation (31.5 KV / 6.3 KV) in the sameUnit & preparations of Tender, Computerized drawings & Project report including design & calculation of complete electrical system.
3. Complete record maintenances for ISO 9001 record
4. Store stock record maintenance for spare parts and make regular procurement.
5. Renovation of all electrical systems with new updated systems.
6. Involment and implements of Energy management systems.
7.Complete Electrical substation (33 KV / 6.6 KV) & preparations of Tender, Computerized schematic drawings & Project report including design & calculation of complete electrical system for plant capacity of 4600 TPD in Nalout , LIBYA.
Responsibilities Of Project Engineer Electrical With CPS Ltd at Al Badia Cement Project (5000tpd) 1.6 Million Ton, Syria.
1. Project site supervision and Project management of Electrical contractors in all aspects related to execution of electrical equipment installation.
2. Responsibility for review of project errection plan, technical installation documentation and data, along with engineering documentation for CPS Ltd projects.
3. Errection and commissioning of various electrical systems like VSD, MV and LV capacitors, Liquid rotor starters, laying of various type of cables used in Cement Industry.
4. Installation calibration and commissioning of field instruments.
5. Installation calibration and commissioning of Gas analyzers, dynamic weighing systems, static weighing systems, on line analysers.
6. PLC panels, Testing of I/O’s and its interacting with all MV and LV panels.
7. Installation calibration and commissioning of LV panels and MCCs.
8. Installation of HT panels, testing of protection relays and commissioning.
9. Problem analyzes and trouble shooting.
10. Review of engineering drawings and Quality control plan and process control and equipment manufacture QA/AC.
11. Review and Monitoring of (8MW x 5 and 4MW x 1) 44MW Power plant erecting, commissioning by WARTSILA ENGINES.
-
November 7th, 2011, 10:23 PM
Post Count Number #4
Manager Electrical
RESUME
1.NAME : TEJENDRA SINGH BIRDI
: birdits AT gmail.com
5.QUALIFICATION : Three Years Diploma in Electrical Engineering
with 75.76 % passed in 1976 from Government Polytechnic,
Ambala City,India.
6.SALARY : Negotiable + perks and family status.
7. PRESENT : Joined as DGM Electical in Saurashrta Cement Ltd., Ranavav
In Sep. 2010 and heading the electrical Deptt. Of 4000 TPD cement
Plant. & left again handling own buisness.
EXPERIENCE :Worked as Suptdg. Engineer Electrical in ACC LTD.
( 1978 – 1996 ) 18 Years Experience in ACC Cement Plants in India & Iraq
2X 3200 TPD of Erection, Maintenance and Repairs of all HT LT
Electrical Equipments.
Planning and Execution of TPM for Electrical
Equipments to have Zero Down Time.150 MW
Connected Load Handled.
Power plant, DG Sets paralell operation, loading and synchronizing with the Grid power.
PLC DCS --Administration for Instrumentation supported by Tech Inst. staff.
Comply with Safety Policy, Standards and Awareness of Electrical Risks, Hazards etc.
Training to Junior Staff for Smooth Running of Plant.
Excellent Interpersonal and Communication Skills.
(1982 – 1986 ) 5 Years on deputation in IRAQ in a 2 X 3200 TPD Cement
Plant of Kawasaki Heavy Industries, Japan, for
Maintenance of HT LT Electrical Equipments.
( 1996 – Till Date ) : Excellent marketing skills to impress upon the customers
with sound technical background in the maintenance,
repairs, erection and trouble shooting with a experience of
30 years.
Providing consultancy in industry to improve the availability and reliability of electrical equipments.
Breakdown analysis, Trouble shooting and providing the solution.
Guidance on TPM to have minimum downtime.
Protection system up gradation and testing.
Parallel of DG sets and with Grid.
Commissioning & Overhauling of HT Motors, Transformers.
Generators at site.
Improvement of Power Factor & It’s panels.
Harmonic analysis and it’s solution
Rewinding / Repairs of Motors Workshop up to 5 MW H.T /L.T/ DC Motors V.P.I. installed for Varnishing of Motors / Armatures ( Vessel 1 M DIA. X 3MTS. LONG)
Rewinding of H.T. Motors with Moulded coils
With Samica Therm Tape.
Dynamic Balancing of Rotors, Armatures , Fans,
Shafts etc. as per IS Grades on a Computerized
Machine with Balancers Software.
Authorized Service Centre of M/S Crompton Greaves Ltd.
& EPCOS Siemens.
8. WORKED ON EQUIPMENTS AS BELOW :-
H.T. Motors up to 6 MW of FUJI, AEG , SIEMENS,
CROMPTON GREAVES , KIRLOSKER , GEC , ABB,
BHEL ETC.
132 KV Switch Yard Erection and Maintenance.
Power Transformers up to 30 MVA ONAF of ABB,
132 / 6.6, 6.6 / 380, 6.6 / 415.
ESP’S ELEX Make of Switzerland
DG Sets up to 4.25 MVA,6.6 KV, TOYO DENKI , WARTSILA, AVKSC KIRLOSKER, STAMPFORD ETC.
SF- 6 Breakers 132 / 6.6 KV, CROMPTON GREAVES,ABB
Protection Relays Testing. ABB, ENGLISH ELECTRIC, SIEMENS.
V.C.B. / MOCB / ACB of GEC,MISTUBISHI,ENGLISH ELECTRIC,LARSON & TOURBO,TELEMCHANIC,SIEMENS
9.ACHIEVEMENT : Minimum Down Time of Machines by implementing TPM.
Planning & Minimum Inventory of Spares.
Maximum Utilization of Spares.
Training to Junior Staff for Smooth Running of Plant.
Safety Procedures to have Zero Accident.
10.PROFESSIONAL OBJECTIVE : Seeking a Responsible Position to Effectively Utilize
Expertise and Experience and Where Hard work is Valued.
-
February 16th, 2012, 09:46 PM
Post Count Number #5
resume for SK jain,
CV
Name : SHAILENDRA KUMAR JAIN
Mail : skj04 AT hotmail.com
Qualifications : U.P. Technical University, Lucknow, India/IERT Allahabad.
Diploma in Instrumentation and Control Engineering
Profile : A professional Project Engineer with 30 years experience of all aspects of Electrical engineering and project Management within the cement industry. Specialised in the cement Instrumentation and Control, Plant Commissioning and Operations. Management and Supervision of Electrical works in Projects and Plant Operations. Operation team Manager
Trained Trainer for Engineers and Technicians. Design training programs as per training need .
Experience : Projects & skills:
Experience of site Management of all aspects related to project execution. Electrical and General Maintenance in Cement industries, Plant operation trouble shootings and optimisation.
Other Responsibilities :
1. Review of engineering design drawings
2. Preparation of electrical tenders
3. Evaluating offers from various contractors
4. Review of process control systems engineering and design review
5. Equipment manufacture QA/QC
6. Detailed engineering for process and electrical scope of supply
7. Site management
8. Supervision and commissioning
9. Project management duties
10. Managing Team of Professionals and Technicians.
11. Training/ Trained Trainer.
July 2009 to June 2011 Cement Project Services and Management consultants, UK.
Engaged at Syria, Al Badia Cement for a 5000TPD green Field cement Project :
After finishing Review of Engineering Design, drawings approvals and equipment inspections, now engaged at project site supervision and daily site activities, quality control, planning and execution, commissioning, Till PGT and PAC.
2005 to 2009 Fushe kruje Cement, Albania.
Electrical Maintenance Manager
After commissioning and completion of the project, became part of Operations team responsible for Electrical engineering, Instrumentation, Automation and IT departments.
2000 – 2005 Seament, CMO Cement Plant, Lebanon.
Electrical Project Manager & Electrical Manager
In Charge of Electrical and Instrumentation works related to the plant modernization project with erection and commissioning of new equipment and over all plant.
Later appointed as ‘Head of the Maintenance Department’, working for plant maintenance and upgrade of the plant and continued as ‘Plant Manager’.
1997 – 2000 J.K. Udaipur Udyog Ltd. Cement Plant
Manager, Instrumentation
1 million tonne/yr plant : Equipped with L&T U84 PLC and other modern instrumentation systems, Siemens MCC’s and MV system.
1990 – 1997 Manager Instrumentation :
Lakshmi Cement Plant, Jaykaypuram (a division of J.K. Corp. Ltd.) Sirohi, Rajasthan.
Technical Engineer :
Worked as Head of the Instrumentation and automation department, coordinated with other departments, maintenance of all instrumentation systems, initiated development activities pertaining to the instrumentation department. Updated the system in order to run the plant trouble free, inventory control, annual budgeting of the consumption and its implementation, Man power control, update the knowledge of the workmen and staff, planning and co-ordinations with all day to day activities.
Later, Joined Project Department at Lakshmi Cement unit-2 phase-2, a One Million Tonnes/yr cement project. Equipment included, TDC 3000, Honeywell DCS system and all other most modern instrumentation and Automation systems. Siemens MCC’s and ABB MV equipment.
1989 - 1990 Nihon Nirman Ltd. Gotan White cement plant.
(Collaboration with Nihon Cement Co, JAPAN)
Technical Engineer
White Cement Project in collaboration with Nihon Cement Co. Ltd. Japan. Siemens Ltd. and Nihon Cement Co. Ltd., Japan supplied all the equipments/ system.
RESPONSIBILITIES : Worked as Head of Instrumentation and Automation Dept., coordinated with M/s. Holtec, Siemens and Nihon Cement Co. Ltd. to complete all project activities pertaining to Instrumentation and Control related to installation and commissioning of the plant.
1987 – 1989 Cement Corporation of Gujarat Ltd., Veraval, Gujarat.
Technical Engineer.
Inst. Engr. at. Worked on maintenance of most modern computerized One Million Ton cement Plant supplied by FLS Denmark as a turnkey project equipped with Yaskawa 584 PLC SDR computer FLS 500 system gas analyzer supplied by H& BW Germany. And all imported instrumentation system such as Heat Generator, ESP, Water Spray System, Weigh Feeders, Indicators, Transmitters and other field instrumentation from FLS.
1986 – 1987 JK Cement Works, Nimbahera,
Instrumentation and Control Engineer. Engaged in its expansion project using precalciner technology, Yaskawa U84 PLC FLS SDR system and all instrumentation system from L&T.
1982 – 1986 Asst. Engr. Inst. at Satna Cement Works, Satna in its 2500 tpd Dry process cement plant. Worked on erection commissioning and maintenance of most modern instrumentation and electrical system used with Siemens PLC SIEMATIC-S-5-150k and R-30 Computer, DC Drive and Gas Analyser supplied by L&T and Siemens with other instrumentation.
1980 – 1982 Foreman Inst. at Cement Corporation of India Ltd. in its Akaltara, (M.P.) units. Worked on commissioning and maintenance of modern instrumentation system being used in medium size dry process cement plant.
1980 Tech. Asst. at Toshniwal Ind. Pvt. Ltd., Ajmer in its R&D Section. Looking after fabrication, testing and calibration of recorders, indicators, controller and other instruments.
TRAINING :
1. Gone through one month “Inplant Training” at Nihon Cement Co. Ltd., Tokyo, Japan.
2. Gone through four days training on “Dynamic Weighing System” at Jenson & Nicholson, Ranchi, Bihar.
3. Gone through one-week training on “Managerial Skills for Decision-making” at NITIE, Mumbai.
4. Gone through one-week training on “Managerial Skills for Technical Personnel” at NITIE, Mumbai.
5. Gone through two weeks training on Cement Ind. HRD Projects, “Training of Trainers” at Technical Training Institute, Bhopal.
6. Gone through one week training at “ABB on SPRS and VVVF drives” at Bangalore.
7. Gone through two days training on “Calibration” by National Physical Laboratory New Delhi.
8. Part Time Trainer at Regional Training Center, Nimbahera.
9. Trained internal Auditor for ISO 9002 certification and System.
10. In plant Training organised by CBMI (A Chinese Cement Plant construction and operation and Management Company) at various Plants at china.
11. Training : By LLOYDS REGISTERED, Jordan: ‘Internal Auditor of IMS ( ISO 9002 and 14001)”
(S.K.Jain)