CURRICULUM VITAE :
SENTHIL.S
Email : senthilvst AT yahoo.com

Career Objective :
Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will help me to explore myself full and realize my potential. Willing to work as a key player in challenging & creative environment.

PROFESSIONAL HIGHLIGHTS :
Company : Nasser S.al-hajri corporation,Saudi Arabia.
Profile : Founded in 1978, NSH made remarkable growth within a very Short time placing itself in a distinguished position among the Leading contractors in Middle East.
Project : Saudi Kayan Olefins Project(SKOP)
Owner : saudikayan
Client :Kellogg brown and root Saudi limited(KBR)
Position : QA/QC EQUIPMENT INSPECTOR
Period : JULY 2008 TO 2010 TILL DATE
JOB RESPONSIBITY & NATURE OF WORK :
- Responsibilities include monitoring and inspection according to the Inspection and test plan for the entire Equipment erection and installation at the Pyrolisis('Cracker') Furnace, Steam Boiler ,Heater’s, Radiant, Convection and Breeching module, Radiant coil, Primary and Secondary quench exchanger, Steamdrum, Burner’s, Heat exchanger, Vessel, Column’s, Reactor , Induced draft fan, Forced draft fan, Steam Turbine , Centrifugal and Reciprocating Pump’s and Compressor, Agitator, Lube oil and Fuel skid.
- Ensuring the works are performed in accordance with the specifications/Method statement and Inspection and Test Plan procedures
- Ensuring implementation of Quality Control Plan, Procedure and Inspection & Test plan
- Responsible for Inspection of ROTARY Equipments Alignment as per API 686 & 610and Manufacturer recommended tolerance.
- Responsible for Inspection of STATIC Equipments Alignment along with as per ASME Section-V111 and Manufacturer recommended tolerance.
- Inspection of Radiantcoil, primary and secondary quench exchanger in the pyrolisis‘PYROLISIS CRACKER’ FURNACE,
- .Inspection and ensuring the installation of radiant , convection and breeching modules at the ‘PYROLISIS CRACKER’ FURNACE,
- Inspection and ensuring the installation of boiler ,economizer, duct’s and stack at the BOILER package.
- Inspection of foundation - pad plate, anchor bolt projections are in accordance with clients specification and respected drawing.
- Ensuring centering, orientation, position, plumbness, leveling and elevation of the respective equipment.
- Equipment internal inspection.
- Inspection of preliminary coupling alignment(rotary equipment)
- Ensuring the shims are in accordance with codes and standards.
- Inspection of saddle soft boot as per codes and standards.
- Documentation approval for grouting.
- Documentation approval for solo run and other activities.
- Inspection of final coupling alignment (with and without pipe)
- Inspection of anchor bolt and bed bolts tightening, torquing (as per specification and vendor recommendation).
- Inspection of driver and driven base bolt’s tightening and torquing (as per standard and vendor recommendation)
- Installation and inspection of spacer coupling and fasteners tightening.
- checking the fixture sagging and responding with the corrective action
- Inspection and ensuring the installation of structure at the FURNACE AND BOILER package.
- To Prepare Inspection Reports & Test Packages
- Maintain records of inspection and submitting to the client for reference.
- Rectify the clients complient’s .
- Coordinate with construction activities.

Company : M/s. Tamilnadu Petroproducts Ltd.
Profile : Industrial contractor.
Position : QA/QC EQUIPMENT INSPECTOR
Period : JULY 2006 TO JULY 2008
JOB RESPONSIBITY & NATURE OF WORK :
- Responsibilities include monitoring and inspection according to the Inspection and test plan for the entire Equipment erection and installation at the , Boiler ,heater’s, heat exchanger ,reformers,vessel,drums,agitator, lube oil and fuel skid, turbine , centrifugal and reciprocating pump’s and compressor.
- Ensuring the works are performed in accordance with the specifications/Method statement and Inspection and Test Plan procedures
- Ensuring implementation of Quality Control Plan, Procedure and Inspection & Test plan
- Responsible for Inspection of Rotating Equipments Alignment as per API 686 & 610and Manufacturer recommended tolerance.
- Responsible for Inspection of STATIC Equipments Alignment along with as per ASME Section-V111 and Manufacturer recommended tolerance.
- Installation and start-up of rotary equipments - Compressors, Pumps, Agitators, Generators
- Installation and start-up of static equipments – Drums, Exchangers, Heaters, Boilers, Reformers, Vessels, Heat-Exchangers.
- Coordinated with vendor specialists for alignment of equipments after erection on foundation.
- To make sure that the foundations are ready before the equipments arrived on site through coordination with the logistic department
- Field verified line-numbers and tie-ins before installation of piping and other major mechanical equipments.
- Direct field personnel through foremen to implement work as per drawings and specifications.
- Inspection of foundations and anchor bolts, base plates for installation of equipments.
- To Prepare Inspection Reports & Test Packages
- Maintain records of inspection and submitting to the client for reference.

Company : Q plus technologies,Coimbatore, tamilnadu,India.
Profile : This is CNC machinery company, Making the machinery
Quality compent’s
Product : Valve and Automobile spare part’s
: CNC and Spindle machine spare part’s
: Aeromatic compents
: Compressor, Pump’s, Turbine spare part’s.
Customer : flowserve, northstem, lakshmi machine work’s,pricol limited,
Position : QA/QC Inspector-CNC machine shop
Period : JULY 2004 TO JULY 2006
Knowledge of instrument’s;
Vernier caliper(inside,outside and depth caliper),Micrometer(inside,outside and depth micrometer),Dial caliper(lever and puppy dial),Slip gauge ,Bore gauge, Electronic height master (Make : electro optima) and basic knowledge of Coordinate measuring machine(CMM).
Nature of Work :
- Prepare the quality plan and inspection procedure.
- Line and stage inspection
- Prepare the inspection sequence
- Provide the inspection tool’s
- Prepare the instrument calibration
- Rectified the customer complaints
- Following the iso and company requirements
- making the compents history chart.
- following the vendor quality activities.
- To maintain records of inspection and submitting to the client for reference.

Education :
DME in diploma in mechanical engg from government poly technic college,kanya kumarai ,tamil nadu,india

Strength :
- Knowledge in international standards like ASME,AWS,ASTM,API,DIN,BS & EN
- Knowledge in inspection methods UT,RT,LPT,MPI
- Good communication skills, hard working, team player, enthusiast, and optimistic.
- Effective in Time management

Computer skills :
Software : AutoCAD 2004,2005,MS office
Operating Systems : Windows 98/2000/XP

Language skills :
ENGLISH,TAMIL,HINDI,MALAYAM.

Personal Profile :
Nationality : Indian
Date of Birth : 03-03-1985