September 13th, 2010, 06:25 PM
Post Count Number #1
Resume CV : X-Steel Modeler
SAMEER.KP
E-mail : smr_kp AT yahoo.com
CAREER OBJECTIVE :
Would like to find a challenging position with in company, where my previous experience can be utilized. I would undertake any additional training beneficial to a new position for the interest of the organization.
ACADEMIA :
Diploma Govt : Polytechnic, Kannur 2004 (Mechanical Engineering) Kerala (India) Pre-Degree Calicut university 2001
S.S.L.C G.H.S.S, kannadi paramba 1999 Kannur Kerala (India)
SOFTWARE TOOLS USED :
- Tekla Structures
- Auto CAD
- Pro-E
SUMMARY OF EXPERIENCE :
1. Six and half years of professional experience in preparation of design, detail, layout & fabrication drawings,3D Tekla modelling, execution and preparation of bill of quantities for heavy industrial engineering projects in the field of Oil, Gas, Power, Refinery & Petrochemical sector projects. The experience include the generation of Structural steel, 3D Tekla models, preparation of structural drawings for main frame structures, Vertical & Horizontal vessel Structures, Equipment supporting structures, Pipe Racks , high raised commercial steel Buildings & Pre-Engineering Buildings for external and Indian Clients familiarized with imperial & metric units.
2. Checking of X-steel Models and detailed drawings.
3. Experience in Site inspection & Erection. Company
Duration of Contract EESF ( Al Ahli Holding Group) , Fujairah, UAE March 2009 to till date Bechtel, India Pvt ltd January 2008 to Feb 2009
Eigen Technical services Pvt ltd (Laing O’Rourke –India) Feb 2007 to Jan 2008 Sieghart ESD, India Feb 2006 to Feb 2007
Strucon Engineers Pvt Ltd. July 2004 to Jan 2006
ORGANIZATIONAL EXPERIENCE :
Emirates Engineering Services X-steel Modeler Since March 2009 to And Factories till Date Fujairah, UAE
Key Responsibilities :
- 3D Modelling of Heavy Industrial Structures and Pre-Engineering Buildings using Tekla X-steel.
- Preparation of RFI & Advance Bill of Materials.
- Preparing GA & Detail Drawings.
- Preparing NC files & Reports.
PROJECTS HANDLED :
- Dubai Outlet Mall, Phase-2, Al Ahli Group, Dubai
- Fujairah Phase-2 Water Transmission System (FWTS2), ILF-UAE. - PROPOSED CLASSROOM BUILDING fOR HIGHER COLLEGE OF TECHNOLOGY (GIRLS)
- GUARD HOUSE WITH ENTRANCE STRUCTURE FOR FUJAIRAH STADIUM Bechtel India Pvt. Ltd. Designer (Civil/Structural) Since Jan 2008 to New Delhi Feb.2009 Key Responsibilities : - Modelling Steel Structures.
- Preparing Design & Detail Drawings. PROJECTS HANDLED
- MOTIVA Crude Expansion O&NG Project, Port Arthur Refinery, USA It’s a huge Oil n natural gas project as a “Joint Venture” of Bechtel Corporation and Jacobs.
- Prairie State Energy Campus Power Project, Lively Groove, USA It is 2X800 MW Supercritical Coal Fired Power Plant. Eigen Technical services Designer (Civil/Structural) Feb2007 to Jan 2008 Pvt Ltd. New Delhi
Key Responsibilities : Preparation of Design, Layout, detail drawings and bill of quantities by using Tekla for Heavy industrial structures in the field of Refinery and petrochemical, for projects in India and overseas.
PROJECTS HANDLED :
- Light House shopping Plaza, USA
- Mc Kinney Commerce Centre, USA
- National Harbor Building, USA
- Westfield Doncaster Shopping Complex , Australia Sieghart Engineers Pvt. Ltd. Structural Designer FEb 2006 – FEb 2007 New Delhi
PROJECTS HANDLED
- Jamnnagar Export Refinery Project .Reliance India Pvt. Ltd.
- Dubai Metro Project, Govt. of Dubai Roads & Transport Authority - Scrubber Support Structure, John Zink, USA.
- Bibralake Warehouse, Australasia Steel Co. Australia.
Bay County Library, Panama City, Florida. Schuff Steel Company. Strucon Engineers Pvt. Ltd. Structural Designer July 2004 – Jan 2006 New Delhi
PROJECTS HANDLED :
- Mc Cormic place Illinois.
- Adventist Bolingbrook Hospital.
- Comanche Expansion project .
- Enexco Packing Plant Indonesia.
PERSONAL DETAILS :
Date of Birth : 28th May 1984
Marital Status : Single.
Religion : Islam
Language Proficiency : English, Hindi & Malayalam