Meridian Solutions Cochin : HR Manager

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    Freelancer
    Join Date
    August 18th, 2010
    Location
    India
    Posts
    16,237

    Meridian Solutions Cochin : HR Manager

    1.HR Manager : MBA's specialised in Human Resources Management

    2.Marketing Manager
    : MBA's specialised in Marketing capable of meeting high targets and also well experienced in handling Sales & Marketing teams

    3.Senior Sales Co-ordinator
    : Graduates committed to meet high targets experienced in handling sales & Marketing teams

    4.Technical Support Executive
    :Intensive knowledge in variousa domains with good communication skills. Programming background is a must

    5.Business Executive
    : Graduate having pleasing personality & good communication skill in English (1year Exp)

    6.Tele-Marketing Executive
    :Graduates with good interpersonal skills and fluent in English

    7.Production Executive
    : Graduates with good interpersonal skills knowledgeable in web based softwares. Programming background is advantageous

    Email your resume to hr@meridian.net.in

    About us :
    Meridian Solutions Inc. is a multi-faceted company with its corporate base in Kochi, Kerala - one of India's leading IT destinations. A technology solution provider delivering quality products and services for the business requirements of any industry, we specialize in providing custom web applications, stunning and effective web designs for static marketing sites and dynamic e-commerce sites, dynamic presentations & 3-D animations.

    Contact us :
    Meridian Solutions Inc.
    Chakkungal Road, Palarivattom
    Cochin, Kerala - India
    http://www.meridian.net.in

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    RESUME
    Firasath.s
    Email :shaiksfirasath AT yahoo.com

    CAREER OBJECTIVE :
    To prove myself dedicated, worthful and energetic as a Clinical data Programmer (CLINICAL DATA MANAGEMENT) in a progressive organization where my skills can be effectively utilized and which offers excellent opportunities to progress and be a member of a team that dynamically works towards success and growth of the organization.

    PERSONAL SKILLS
    :
    Ability to take initiative, work in team environment, self motivation, competitive spirit, comprehensive problem solving abilities, willingness to learn more.

    PROJECT DESCRIPTION
    :
    Tuberculosis (TB) is a disease caused by bacteria called Mycobacterium tuberculosis. The bacteria usually attack the lungs. TB bacteria become active if the immune system can't stop them from growing. Gene products involved in controlling vital aspects of mycobacterial metabolism and cell wall synthesis would be attractive targets. Trehalose is present as a free disaccharide in the cytoplasm of mycobacteria and as a component of cell-wall glycolipids implicated in tissue damage associated with mycobacterial infection. Transferase protein is present in mycobacteria, used in controlling the cell wall synthesis. The trehalose inhibitors are docked with transferase protein in GOLD software.
    By calculating the binding free energy, the lowest energy inhibitor is used against TB after clinical trials.

    ACADEMIC PROFILE
    :
    Course University College/Institution Year of passing Percentage
    M.Sc., Bioinformatics Autonomous Auxilium College (vellore) 2007-2009 78%
    B.Sc., Biotechnology SVU Tirupathi. P.V.K.N. Govt., College, Chittoor. 2004-2007 68%
    Intermediate Board Of Intermediate Education, Andhra Pradesh. Adarsh vidhyarthi junior college, Chittoor. 2002-2004 80%
    S.S.C Board Of Secondary School Education, Andhra Pradesh. Indian school of English,
    Chittoor. 2001-2002 70%

    TECHNICAL SKILLS
    :
    Operating Systems Windows-98/00/XP.
    Databases DCA, C++,oracle, perl, D.T.P,
    CDM(Clinical Data Management).

    EXPERIENCE
    :
    I worked as a customer care executive in TBSS(TATA Business Support Services) for
    4 months in 2010 at begumpet,Hyderabad.

    STRENGTHS
    :
    - Planning and organizing skills.
    - Positive attitude with an amiable disposition.
    - Strong communication and technical skills.

    HOBBIES
    :
    Listening Music,cooking and watching TV.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CURRICULAM VITAE

    N.P.RATHEESH
    email id :npratheesh4u AT yahoo.co.in


    POST APPLIED FOR : -SR. INSTRUMENT TECHNICIAN
    Objective
    A Technical Position in an Organization which offers new challenges, on going Development and career advancement.
    Total Professional Experience :-

    - Having more than 05 Years in the Instrument Technician at various projects and maintenance Petrochemical projects, Oil Refineries, Sulphur Recovery Plant etc…
    Technical Qualification
    - Diploma in Instrumentation
    Educational Qualification
    - S.S.L.C. passed (Board Of public examination Kerala)
    - Pre-degree passed (Calicut University)
    Synopsis of Professional Experience :-
    - Worked as an Instrument Technician through Integrated Oilfield Supply&Services LLC, (IOSS) in O.G.C
    Nimr Compression satation, (Oman Gas Company ) Project under M/s Gulfar,LLc,Oman .
    - Worked as an commissioning Instrument Technician through Qatar Kentz forJGC/ KBR (Shell Pearl GTL)
    Rass Laffan, Qatar .

    - Worked as an Instrument technician through Saudi Arabian Kentz for Khurais Water Injection Facilities
    And Utilities (Saudi Aramco) Project under M/s Snamprogetti, K.S.A.
    - Worked as an Instrument Technician through Perfect Instruments and Controls,Mumbai on Bharat
    Petroleum Corporation Ltd , SRU Project, Kochi Refinary.
    - Worked as an Instrument Technician through S.J.Electricals,Mumbai for J.S.W Steels Limited, Vasind, Mumbai.
    - Worked as an Instrument Technician through S.J.Electricals,Mumbai for J.S.W Steels Limited,
    Bellary,Karnataka
    EXPERIENCE IN DETAILS;-
    KENTZ ENGINEERS & CONSTRUCTORS QATAR. MAY 2009 TO JANUARY 2010
    1 Project : Peral Gas To Liquid Conversion Project
    Position : Instrument commissioning Technician
    Client : Qatar shell
    NATURE OF DUTIES

    - Conducting the dry function testing & also supporting the dynamic function testing on DCS, IPS & FGS.
    - Power up, Loop checking , commissioning & Troubleshooting of Hart/FF transmitters like flow, pressure, temperature, level, vibration ( Rosemount, Endress-hauser , Honeywell yokagawa ,GE) etc
    - Commissioning, Calibration, Troubleshooting and Maintenance of Control valves , ON/OFF valve & MOV (Fisher, Dresser, Metso and Masoneilan Rotork)
    - Co-ordination between various parties involed in the commissioning like Shell, JK, Honeywell, Kentz, Entropie, Endress-Hausser and GE
    - In charge in field operation, Fault Finding / Repair of various systems under my scope of responsibility “Honeywell C300, FIM ,SAFTY MANAGER .
    - Having hands over experience in Honeywell dcs experion 310.3 series hands-over experience in recently launched FF-field bus technology for field instruments communication with 31.25kbps speed
    FIRE & GAS :
    - Calibration and maintenance of Toxic &Flammable gas detectors( Drager polytron 2xp,Detronics,General monitors(CH4,H2,CO,O2,SO2,H2S,NH3)Point Gas Detector , Heat detectors &Smoke detectors
    - Maintenance & Test of Horns, Beacon , Manual alarm call points
    - Experience about FM 200 SYSTEM,VESDA SYSTEM,HSSD SYSTEM
    INTEGRATED OILFIELD SUPPLY&SERVICES LLC,OMAN. JANUARY 2011 TO MAY 2011

    2 Project : Gas compression satation,(QTY3)
    Position : Instrument commissioning Technician
    Client : O.G.C .OMAN
    NATURE OF DUTIES
    - Installation and Calibration of switches ,PDI,FIC ,LIC,TG,Control valves..
    - Erection of local control panels .
    - Loop checking,seqence logic checking , pre-commissioning and commissioning
    - Handling the manpower as per the site condition.
    - Calibration of various process control instruments like DP, Mass flow, magnetic flow transmitters, DP type level Transmitters
    - Preparation of Test report , calipration report , punch list, As bulit marked up drawing, Hook up drawing segmentaldossiers and materital inspection report
    KENTZ ENGINEERS & CONSTRUCTORS SAUDI ARABIA. APRIL 2008 TO MAY 2009
    3 Project : Khurais Water Injection Facilities and Utilities(Pr.620)
    Position : Instrument commissioning Technician
    Client : Saudi Aramco,K.S.A
    NATURE OF DUTIES
    - Installation and.Calibration of switches ,PDI,FIC ,LIC,TG,Control valves.
    - Installation of Trays and conduits.
    - Erection of local control panels .
    - Loop checking, logic checking and pre-commissioning

    PERFECT INSTRUMENTS AND CONTROLS, MUMBAI. MARCH 2010 TO NOVEMBER 2010
    4 Project : Sulpher Recovery Unit for BPCL Kochi Refinary
    Position : Instrument Supervisor
    Client : Bharat petroleum corporation Ltd ,Kochi.
    NATURE OF DUTIES

    - Handling the manpower as per the site condition.
    - Documentation.
    - Calibration of DP, flow transmitters, Thermocouples, Rtds, Pressure transmitters, Temperature transmitters, I/P
    - Stroke checking of Control valves and, ON/OFF Valves (FLOWSERVE),
    - Erection of Field Bus junction box.
    - ESD Modification. Tank Gauging system of Tokyo kieso, All types of Thermocouples, Rtds, Pressure transmitters, Temperature transmitters, .
    - Documentation of As- Built Drawing.
    S.J. ELECTRICALS, MUMBAI. JUNE 2006 TO NOVEMBER 2006
    5 Project : Implementation of Hot Roll Mill unit
    Position : Instrument Technician
    Client : J.S.W.Steels Limited Vasind,Maharashtra.
    :
    NATURE OF DUTIES :-
    - Installation :-Thermal Mass Flow Meter , FT, .LT, P/I & I/P ,SWITCHES, H2S&H/Detector
    - Solenoid Valves, ON/OFF Valves , Shut down valve and Control Valves etc.
    - Conduit pipe Installation, Meggering, Cable laying glanding, termination etc.
    - Loop checking and Sequence logic Checking
    S.J. ELECTRICALS, MUMBAI. DECEMBER 2006 TO APRIL 2008
    6 Project : Implementation of Cold Roll Mill unit
    Position : Instrument Technician
    Client : J.S.W.Steels Limited Vidya nagar Bellary,Karnataka.
    NATURE OF DUTIES:-
    - Working instruments like Transmitters of Rosemount Honeywell, yokogawa, siemens .
    - Tubing works for analysers and shut down panels.
    - Internal wiring,and interlock Relay wiring
    - Loop checking in DCS honey well(HPM TDC 3000)
    SAFETY TRIANING:-
    - Shell Life Critical Activities (11 Classification)
    - Shell Life Saving Rules (LSR) (12 rules)
    - KBR & JGC Safety induction (2 days)
    - Kentz Safety induction (20 days)
    - Shell Commissioning induction
    - Saudi Aramco Safety induction
    TEST EQUIPEMENTS HAND
    - Dead weight tester
    - 275 & 375 Field communicator.
    - DRUCK DPI -812&TRX Temperature Calibrator
    - DRUCK Pressure Calibrator
    - FBT6 Fieldbus Moniter
    - ABB 691 communicator
    - DK3 Vibration meter
    - Decade Resistance box

  4. Post Count Number #4
    Unregistered
    Guest

    SENIOR PROJECT MANAGEMENT PROFESSIONAL - HVAC

    HAMSA MOHAMED RABIE
    Palakkad (Kerala) – 678 611
    E-mail : mohamedrabie AT rediffmail.com

    SENIOR PROJECT MANAGEMENT PROFESSIONAL - HVAC :
    19+ years’ rich experience in delivering optimal results & business value in high-growth environments in the areas of Project Management, Planning, estimation, tendering, Testing & Commissioning in (HVAC),coordination in plumbing & fire fighting and related Electrical installations in reputed industries and in different field capacities.

    PROFILE :
    - Expertise in project planning, estimation, scheduling, monitoring and execution of HVAC projects with costing, overruns, budgeting schedules, procedures and without incidences time.
    - Thrive in a deadline intensive environment, multi-task and to perform under pressure and meet deadlines. Excellent man-management, time management and leadership skills.
    - Expertise in HVAC heat load verification, equipment selection, duct static pressure calculation, pump head calculation, design and layout verification.
    - Co-ordination with the plumbing & firefighting and electrical & BMS engineers to execute and complete the works in time and perfection.
    - Strong background in commissioning, operations and controls of wide range of sophisticated instruments and controls with proficiency in reducing downtime & enhancing operational effectiveness of equipment as well as BMS.
    - Key competencies in maintenance & repairs jobs of various HVAC equipments. Deft in Installation, Commissioning and Maintenance of Central HVAC System.
    - Proven skills to design effective plans and executes in preventive maintenance, break down maintenance and shut down maintenance schedule. Proficient in Trouble Shooting and sensitizing workforce on need of industrial safety & observing safety standards.
    - In this 11 years G.C.C. experience many projects were executed. Some of the prestigious types of projects were (G+21 building and Hospitals projects in QATAR, Supermarket and high raised buildings in U.A.E, Royal Air force hanger building, Defense Camp and multipurpose complex in OMAN).

    Key Competencies :
    - Project Management
    - Erection & Commissioning
    - Quality Management
    - Safety Management
    - Troubleshooting
    - Procurement / BOQ
    - Drawing / Testing / Inspection
    - Analytical Skills & verifications
    - Crisis Management
    - Cross Functional Coordination
    - Training & Development

    PROFESSIONAL EXPERIENCE AND ACCOMPLISHMENTS :
    TECHNICAL SOURCES (K.S.A) FROM 29 DEC 2011 TO 12 NOV 2012
    (SHUT DOWN/SHORT TERM CONTRACT)
    SITE MANAGER (MECHANICAL-FACILITY MANAGEMENT) :
    - Execution in charge for the Mechanical works in the power plant project located at RAZ AL KHIR (KSA).
    - Studying and controlling of B.O.Q and cost estimation of the project.
    - Internal co ordination processes and costing schedules.
    - Preparing reports and submitting and planning with client and consultant related to the progress of the work at site.
    - Major Materials and equipments utilize status monitoring and flow monitoring.
    - Involve in estimates of Project Manpower utilities and allotments studies.
    - Involve in temporary facilities management studies and implementation of facilities (HVAC, PLUMBING and
    FIRE FIGHTING works related installations).

    NATIONAL UNITED ENGINEERING AND CONTRACTING : 28 Jun 2009 to 28 Jun 2011
    (2 YEARS CONTRACT)
    Senior Mechanical Engineer (HVAC)
    CHILLED WATER SYSTEM PROJECTS, PROJECT CO-ORDINATION IN PLUMBING & FIREFIGHTING.
    - Guide & mentor the team in preparation of BOQ’s specifications, Estimations, Planning & Scheduling, Evaluation of Quotations.
    - Responsible for equipment selection and related specification standards, cooling load and perfect installation standards to minimize projects overrun.
    - Accomplish responsibility for completing mechanical works (all services) which included installation, review of shop drawings, testing and commissioning.
    - Efficiently manage testing and commissioning of all mechanical equipments and also inspection of pending works and review of shop drawings
    - Chart up maintenance schedules for all instruments and closely monitor the maintenance activities ensuring minimum operation free time.

    Key Achievements :
    - Credited for completing and commissioning of chilled water system of HANGER building in 2010 for RAFO - SALALAH (MOD-OMAN) with VFD/DDC controls, air balancing and water balancing works in coordination of I2I Qatar.
    - Distinction of being appointed to monitor the Commercial/Residential multipurpose complex project to coordinate with sub contractors and mechanical services such as HVAC (1500 TR (CARRIER) chilled water system and 300 TR DX system completed on 22/01/2011) / Plumbing / Fire Fighting / Kitchen & Laundry Equipments/Water purification system and LPG system in compliance to DW-142 & 143, ASHRAE, SMACNA, IHVE, BS, CIBSE, ANSI & ASTM standards.
    - Judiciously handled various types of HVAC projects including high rise buildings which are mainly executed in the multi project environment.
    - Closely monitored installation/maintenance of various equipments ranging from chiller to DX type equipments in multistory building complexes and commissioned successfully.
    - Proactively contributed in layout design verification, equipment selection, Pump head calculation and duct static pressure calculation related to the consultant and client approval.
    - Associate closely to work out the heat load estimation for projects and cross check the designing standards of the system to minimize the technical problems towards the project execution.
    - Actively involved in commissioning of 3 nos. Trane, Air cooled screwed type chillers, all sewerage pumps and cooling tower, Fire Fighting System, FM200 for all sub-stations, Cold/Hot Water system, BMS system, LPG system and Grey water treatment system etc in RAFO SALALAH (MOD-OMAN) and commissioning coordination of army camps of (MOD-UK) in MUSANA.
    - Coordinated with the electrical professionals for the completion of the power installation for the equipments, tested and completed the works as required by the client.

    AI MALKI (ARABIAN AIR CONDITIONING COMPANY) QATAR : May 2006 to Nov 2008
    (2 YEARS CONTRACT)
    Project Engineer/In charge (HVAC) – Details Attached
    - Maintained reasonable inventory of critical spares to avoid costly emergency procurements.
    - Overseen all phases of project execution; approve engineering/design changes, troubleshoot and resolve complex technical problems, consistently meeting project deadlines and highest possible quality standards.
    - Having credential of optimizing maintenance systems that resulted into Reduced Energy consumption by equipments
    - Scheduled, conducted and participated in Project meetings.
    - Negotiated subcontract agreements, purchase orders and general contracts with clients
    - Provided leadership to project teams and integrated their efforts to maximize operational productivity
    - Drawn up project plans, schedule of activities, budget, & cost estimates, planned, procured, mobilized, and deployed resources to deliver the project within defined time and costliness.
    - Instrumental in framing on-site and off-site Emergency Management Plans and conduct safety drills periodically to familiarize the personnel with Emergency Management Plans.
    - Organized various training sessions for the team to enhance their performance.
    - Work experience in project with BMS personnel’s to link the equipments and machineries with interfaces to bring their I/O and connect them in a system to control and monitor.

    Key Achievements :
    - Credited for commissioning and Air – balancing of the sensitive system and HMC project for ASGHAL in QATAR.
    - Worked in the environment of multi project system and executed high rise building project and hospital projects.
    - Interface and coordinate with ASGHAL, QATARKENTZ, SHELL ENGINEERS & KPL, GULF HOUSING, ARCON, ARABTEC, QATAR ENGINEERS & ASSOCIATES, QATARI DIAR, COWI and various clients.

    AL MAILAM & SHALAN CO., KUWAIT : Aug 2003 to Aug 2005
    Maintenance Incharge (Kuwait Municipality)
    - Drawn up plan for preventive maintenance, TPM, OEE concepts & instruments to increase machine up time and equipment reliability
    - Devised effective strategies for designing and erection of planting & drainage system including commissioning.
    - Established plan for integrated testing of ECS, TVS and Fire Alarm System with BMS System.
    - Managed resources while creating estimates for the project, Work Breakdown Structure, Project Plan, Contingency Plan & Schedules, identifying risks within defined scope, quality, time and cost constraints

    Key Achievements :
    - Coordinated successfully in maintenance project of Kuwait Municipality for effectively controlling and making them to work to their maximum potential.

    FRESH AIR TECHNICAL SYSTEM (LLC), DUBAI : Apr 1999 to Aug 2003
    HVAC Engineer (Project and Estimation)
    - Instrumental in framing on-site and off-site Emergency Management Plans and conduct safety drills periodically to familiarize the personnel with Emergency Management Plans
    - Developed Vendors and negotiated with them to supply the best qualitative products on most competitive prices
    - Comprehension and assimilation of contractual obligations, rights, and scope of work Engineered preparation of MOU’s, Legal Drafting and other contractual documents
    - Built & nurtured relations with Govt. Authorities and obtained approvals for the projects
    - Initiated procurement activities with defined schedules and tendered all capital & revenue nature of works Regularly followed up with suppliers to ensure deliveries on time
    - Periodically conducted condition monitoring and initiated advance action to prevent major breakdowns
    - Propagated Quality Circle movement and developed quality culture in the work force to achieve quality leadership in the industry

    Key Achievements :
    - Credited for handling installation projects of large AHUs, PACUs, DX-split units, Duct works, including Electrical works Testing & commissioning and Air balancing etc.
    - Distinction of being nominated as an “Incident Controller” to respond to the emergency within the shortest possible time and guide the staff to handle the emergency in safe and effective manner.
    - Judiciously handled heat load calculations in compliance to the Dubai Municipality standards and specifications.
    - Geared the activities to manage Pre- commissioning check-ups for the equipments, pipelines, ducting layouts, Electrical and Mechanical installations.


    ATLAS AIR CONDITIONING, SHARJAH (U.A.E.) : Jan 1998 to Feb 1999
    Mechanical Engineer

    BANU ENGINEERING : Feb 1991 to Dec 1997
    Junior Engineer (Mechanical)

    CORDITE FACTORY (MOD – INDIA) : Dec 1989 to Dec 1990
    Engineer Apprentice

    EDUCATIONAL CREDENTIALS :
    3 years Diploma in Mechanical Engineering with 68% in the year 1987 Govt. Polytechnic, Udhagamandam The Nilagiris
    Diploma in system management NIIT
    SSLC with 75% in the year 1984 St. Antoney’s Higher Secondary School, Coonoor, The Nilagiris
    Pursuing M.Tech(Mechanical) on distance education. CMJ unviersity.

    I.T. Skills :
    COBOL, DBASE 111, FOXPRO, VIP Planner, M.S. Office, Auto Cad, MS project, System analysis and Designing

    Date of Birth : 7th Apr 1969
    Languages known : English, Hindi, Malayalam and Arabic.
    Driving License : Valid L.M.V driving license of OMAN and India

    HAMSA MOHAMED RABIE.

    One of the executed project details :-
    Duration : July 2009 -Feb 2010 (On site)
    Project Name : RAFO Hanger building (Salalah – Oman)
    Client : Royal Air force of Oman (MOD - Oman)
    Team Size :
    Location : RAFO
    Details of the project :-
    1. Supply & Installation of chilled water FCU’S & AHU’S A/C Equipments with necessary accessories (TRANE).
    2. Supply & Installation of Air cooled screw type chillers 3 nos.
    3. Supply & Installation of roof mounted extract fans with accessories.
    4. Supply & Installation of chilled water 100% fresh Air handling units with necessary accessories.
    5. Supply & Installation of G.I during works and fitting with necessary fiberglass insulation and accessories.
    6. Supply & Installation of G.I extract ducts with fitting and necessary accessories.
    7. Supply and Installation chilled water pipes with necessary insulation and accessories.
    8. Supply & Installation of necessary valves, fittings, test points and accessories in the pipe lines.
    9. Supply and installation of Air flow sensors and detectors in the ducting system.
    10. Supply and installation of VCDS, Fire dampers, NRDS & SD in the ducting system.
    11. Supply and installation of access panels, Grills & diffusers.
    12. Testing & commissioning of the air conditioning systems.
    13. Flushing and cleaning of the chilled water piping system.
    14. Air balancing of ducting and water balancing of the piping systems.
    15. As built drawings, commissioning reports, Air balancing reports, water balancing reports, technical documents, and O & M manuals and labeling of the complete system.

    Skills used :
    Bill of quantities preparations, Project management, Estimation, Heat, load verifications, Planning schedules, Communication skills, co-ordination skills, Technical Know ledges and document preparations, Air balancing, water balancing, Testing & Commissioning, Training and handing over.