Mechanical Supervisor : Resume CV

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    On probation
    Join Date
    August 16th, 2010
    Location
    Siwan
    Posts
    1

    Mechanical Supervisor : Resume CV

    Mr. Rajesh Singh Work, Mob : +96896497662
    Email : rajesh78singh AT rediff.com, rajesh78singh AT gmail.com rajeshdnsingh AT yahoo.com

    OBJECTIVE :
    To be a part of your esteem organization and to excel in the field of Work which you provide as to fulfill my ambition and your expectations

    PROFESSIONAL EXPERIENCE IN ABROAD : 07 Years

    PROFESSIONAL EXPERIENCE IN INDIA : 06 Years

    EXPERIENCE AT ABROAD :
    Company : Galfar Engg. & Con S.A.O.G Oman
    Position : Equipment Supervisor
    Client : Petroleum Development Oman
    Tenure : March 2009 to Till Do

    Company : Bechtel & Co Sohar Aluminum Sohar Oman
    Position : Mechanical Supervisor
    Client : Sohar Aluminum
    Tenure : November 2007 to May 2008

    Company : Salem M.S.Al, Sgheer Gen. Con Est. K.S.A
    Position : General Foreman
    Client : Aramco, Samraf, Marafoq, petrochemiya, Hadid Steel
    Tenure : October 2002 to June 2007

    Company : Enelpower Ansaldo consortium Spa K.S.A
    Position : Millwright supervisor
    Tenure : April 2004 to June 2007

    EXPERIENCE AT INDIA :
    Company : Ketan Engg. Co, Hazira Gujarat, India
    Position : General Foreman
    Tenure : Nov 1999 to April 2002

    Company : PRV Engineering Co. Jamnagar Gujarat, India
    Position : Mechanical & Millwright Technician
    Tenure : Jun 1996 to August 1999

    ACADEMIC QUALIFICATION :
    Intermediate 1993

    COMPUTER KNOWLEDGE :
    Platforms : MS Office 2003

    Training and Seminars attended :
    1. GRE Supervisor(PDO)
    2. STOP for Supervisor
    3. Escape hood/ Confined Space
    4. Method Statement & JHA
    5. H2S / BA Certificate
    6. Fire response

    JOB RESPONSIBILITIES :
    1. Carryout leveling of the machine beds for both static and Rotating Equipments
    2. Verify the alignment of the Pump, Compressor and Turbines, fen fan & many type of heavy machinery
    3. Verify the alignment of the different type of static elements
    4. Carryout balancing of the impellor and different types of Fans and Blades
    5. Responsibility for lubrications of the different types of systems
    6. Checking for the abnormality of the systems in respect of its sound and vibrations.
    7. Handling of Different types of instruments used for leveling and alignment
    8. Supervise the maintenance of pumps and different types of valves & gearboxes
    9. Co ordinate the materials of piping, structural, according to job requirement
    10. Inspection of the all type alignment device & rotating equipment etc.
    11. Carry out the stringing of 10’’ CS Line pipes for pipeline construction.
    12. Carry out the Welding activities for the pipeline construction.
    13. Co ordinate with QA/QC personals and Clients.
    14. Updating the day to day activities. Along with client & third party
    15. Responsibility of installation, alignment, maintenance & restore the pump, compressor gearbox ,fin fan, conveyer, and many type of heavy machinery,
    16. Carryout the GRE pipeline UG / AG according to approved specification & standard
    17. Carryout the all GRE pipe joint procedure as per standard such as adhesive bonding , field coupler , threaded

    PERSONAL DETAILS :
    Date / Place of Birth : 16/08/1974 Gopipatiyao
    Nationality / Religion : Indian / Hindu
    LANGUAGE KNOWN : Hindi, English, Gujarati, Working Arabic

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    mechanical supervisor

    Experience :
    - Worked for QSGTL plant as commissioning mechanical supervisor for THC (TOYO HUNDAI CONSORTIUM) from 5 Nov 2010 to 2 Feb 2011.
    - Worked for Oman Lng Sur plant as maintenance executive with vendor from 27 May to 25 June 2010.
    - Worked for Saudi Aramco with KAUST Project as commissioning Mechanical Technician Designation) under Al-Hugayet Contracting Est. from 1st April, 2009 to 31 March 2010.
    - Worked with BOROUGE as MECHANICAL SUPERVISOR through TECNIMONT from 11th MAY 2008 To 11th JAN 2009.
    - Worked with QATAR FARTILISER (QAFCO) as MECHANICAL FOREMAN through QCON from 23OCT 2007 to 26 NOV 2007.
    - Worked with Merco (AL-OSAIS INTERNAIONAL HOLDING CO.) as a Mechanical Technician/ Foreman in Plant Maintenance Division from 18th Aug.2005 to 20th Aug 2007 in SAUDI ARABIA.
    - Worked with Khaitan Agro Ltd., as a structural fabricator on solvent extraction plant in Ratlam in MP. From 2nd June 2005 to 10th Aug. 2005.
    - Worked with Pitle Engg. Private Ltd., as as machine assembly and alignment fitter for Continuous Galvanizing Line(CGL) in Gujrat from 25th Jan. 2005 to 30th May 2005.
    - Worked with RSB Engg. As a Mechanical Technician recently completed dismantling coding, packing, loading ACHANBANCH 4 HI COLD ROLLING MILLin Aluminum Africa Ltd., Dar Es Salaam, Tanzania from 5th Oct. 2004 to 8th Dec. 2004.
    - Worked with Dassnagar Precision Engg. Pvt. Ltd .in National Steel Indore as Hydraulic Technician from 1st Aug. 2004 to 10th Sep. 2004.
    - Worked with Technological engineering contractors for Ispat Metallic India Ltd. In coal injection plant as a structure fabricator from 25th May 2004 to 28th July. 2004.
    - Worked with Ispat Metallic India Ltd. From 10th Oct. 2002 to 24th May 2004 as a Maintenance Technician in Hot roll mill.
    - From Jan.8th 2002 to Oct. 9th 2002 working for Ispat Metallic India ltd. Dolvi. Through prigo engg. As a plant MECHANICAL TECHNICIAN (operation & maintenance) Consisting.
    - Working with Alta Laboratories Pvt. Ltd. Khopoli. As a shift Engg. of14. Aug 2000 to13 Aug. 2001