Erection & Commissioning, Project Management : Resume

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Erection & Commissioning, Project Management : Resume

    Prahlad Thakur
    E-Mail : pthakur2007 AT yahoo.co.in , pthakur AT rdpl-india.in

    Objective :
    A versatile and hard working power plant Professional with good problem solving and analytical skills, 8.6 years of working experience in power plant Erection, Commissioning, Operations & Maintenance; seeks an assignment with higher responsibility in Power Sector.

    Professional Summary :
    Over 8 years of rich experience in Power Plant Projects/O&M
    Deft in swiftly executing the projects with competent cross-functional skills and ensuring on time deliverables.
    Rich experience in Design and Development of Nuclear power plant.
    Expertise in implementing cost saving measures to achieve substantial reduction in terms of man days, production cost, raw materials and energy consumption.
    Resourceful at strategizing techniques for maximum utilization of manpower/machinery.
    A keen planner, strategist & implementer with demonstrated abilities in planning the completion of the project within the pre set budget.
    Deft with Erection and Commissioning of Power Plants.
    Well versed with the troubleshooting operations in the Projects and normal operation & Maintenance.
    An excellent communicator with good analysing skills.
    Rich Experience in Performance Calculations & Efficiency improvement of Power Plants.

    Academia :
    B.Tech in Electrical Engineering J.R.N. Rajasthan Vidyapeeth University, Udaipur, 2006
    Diploma in Computer Application IICE, Bhilai (C.G.) 2001
    Diploma in Electrical Engineering Govt. Polytechnic college, Ujjain (M.P.) 2000

    Career Highlights :
    Present Experience :
    Nuclear Power Corporation of India Limited (A Government of India Enterprise) Rawatbhata
    Via Kota -Rajasthan
    Worked in Electrical & Instrumentation section of Nuclear Power Plant of capacity 1280 MW (180MW+220MW+220MW+220MW+220MW+220MW).
    Designation : Executive Engineer (E&I)
    Role : Project Management and Erection & Commissioning.
    Period : January- 2002– Present

    Core Competencies :
    Strategic Planning :
    - Establishing goals, short term and long term budgets and developing plans for the achievement of these goals.
    - Actively involved in planning and analysis for assessment of revenue potential in business opportunities

    Project Planning & Management :
    - Preparation of schedules, network activity, Inspection procedures and quality assurance manuals.
    - Selection of right contractors and equipment suppliers / sub-contractor agreements and Monitoring of working documentation packages within approved budget.
    - Evaluation of offers and negotiations with contractors and equipment suppliers.
    - Receiving invoices and scrutinize the same as per the terms of the orders released.
    - Follows and informs management about effective critical decisions based upon analysis and experience.
    - Co-ordination, scheduling, review engineering of various packages.
    - Consultant interaction and deal with techno-commercial issues.
    - Preparation of work methodology, safety, and quality management plan for flow line construction campaign.
    - Preparation of Electrical and Instrumentation purchase specifications / data-sheets of equipment/Preparation of specifications based on system requirement.
    - Preparation of tender specifications, bills of quantity, and construction supervision of the electrical/Instrumentation installations of 220 MW (Twin Unit) Atomic Power Project.
    - Drafting and implementing of test procedures for various Electrical & Instrumentation equipment.
    - Preparing and implementing start up procedures.
    - Listing any changes in design and recommended future design changes from experience gained in field.
    - Purchase activities related to spares like Electrical, Instrumentation, Pneumatic items and Consumables etc.
    - Regular assessment of contractors and equipment suppliers in consultation with respective system Engineers.
    - Close Coordination with User Dept. and Suppliers for timely delivery of Raw Materials, Spares and Consumables.
    - Taking stringent quality measures including preparation / maintenance of necessary documents with ISO standards.

    Erection and Commissioning :
    - Installation, Commissioning and testing of Turbo Generator (16.5kV-BHEL make), 260 MVA Generator Transformer, 2250 KW Diesel generator, 415V Motor Control Center.
    - Installation and commissioning 120 Nos. of LT / HT motor are installed along with pumps & fans in various systems in the plant.
    - 245 KV SF6 circuit breaker (M/s CGL, Nasik.), 258V D.C battery banks, 2x250 KVA (Keltron, Trivandrum) UPS, Energy Billing Metering System (220kV- Landis & Gyr make), 220kV Line Metering System (Data pro).
    - Testing and Calibration of Electrical Automation system & Annunciation loops and function checks for trips, alarms etc. including 4 - 20mA transducer signals testing for Data Acquisition Systems.
    - Installation, Commissioning and testing of ECIL make SCADA System & SIMENS make 10 Nos. of PLC.

    Operation & Maintenance :
    - Planning and effecting preventive maintenance schedules of equipments to increase their reliability.
    - Proactively identifying areas of obstruction/breakdowns and take steps to rectify the machines through application of trouble shooting tools.
    - Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in O&M Expenditures and work within the planned budget.
    - Documentation of ISO 9001-2000, 14000, OSHAS- 18001.

    Key Projects handled :
    Title : 2X220 MW Power Project (Rajasthan Atomic Power Project – 5&6)
    Role : Team Leader
    Scope : The scope of the project was to Design, Engineering, Erection and
    Commissioning of 220/400 KV one & half scheme switchyard, 260 MVA GT and 2X220MW BHEL extraction cum condensate Turbine along with Air Cooled Condenser.

    Commissioning Activities of Boiler & Turbine :
    - Hydraullic test, Refractory dry out process, Atmospheric & Pressure alkali boil out, chemical cleaning of boiler, Steam blowing of steam lines.
    - Lines oil flushing, individual auxiliaries testing & monitoring.
    - Boiler light up & turbine rolling pre commisioning activities.
    - Turbine governor testing & calibration.

    Trainings :
    Attended trainings on :
    - Direct Trainer Skill at HCM Rajasthan State Institute of Public Administration, Jaipur during 18th to 22nd August 2008 sponsored by Department of Personnel & Training, Government of India.
    - Event Investigation and Root Cause Analysis in 2008 organized in Nuclear Training Centre by IIT, Delhi and Ministry of Power.
    - Self Assessment and Corrective Action in 2007 organized in Nuclear Training Centre by IIPM, Rourkela
    - Attended course for Advanced Simulator Instructor Training Program organized by World Association of Nuclear Operators (WANO-Tokyo center) in 2006.
    - Auditor Course on Occupational Health Safety & Management – 18001 in 2005.
    - Auditor Course on Quality Management System-9001 at Rawatbhata in 2004.
    - Acquired certificate on Electrical Authorization for operating 400/220/6.6/3.3/11/0.4 KV & HV equipments since 2003 as per Atomic Energy Regulatory Board guidelines.
    - Team Building & Effective Communication at Rawatbhata in 2003.
    - One year Orientation Training on the job training in Nuclear Engineering for O&M Engineers at Nuclear Training center in 2002.

    IT Credentials :
    MS Office applications, PM & MM modules of SAP R-3/ ERP Application, MS – Project, AUTOCAD, Applications

    Personal Vitae :
    Date of Birth : 4th July 1978
    Sex : Male
    Marital Status : Married

    (Prahlad Thakur)
    Place : Bhilai, Chhattisgarh
    Date : 02/08/2010

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Re: Erection & Commissioning, Project Management : Resume

    RESUME :

    AIM :-
    To make best utilization of each opportunity in hand for enhancing the qualities within me & thus give my best walk of life most importantly in work assigned to me.

    PERSONAL DETAILS :
    Name : Sainath D. Tirvir
    Date of Birth : 31st May, 1970.
    Marital Status : Married
    Sex : Male
    Email : tirvir¬¬_sainath AT rediffmail.com
    Languages Known : English, Hindi, Marathi, Kannada, Konkani, & Telgu.

    ACHIEVEMENTS :
    Received appreciation certificate &
    Reward from Thermax Limited for the Job done
    M/s Unique Power (Bangladesh)

    SUMMARY :
    a) Bachelor of Engineering (Mechanical) from Gulbarga University
    (Karnataka) with first class in 1996.
    b) Computer competency- Office tool like Microsoft word, Excel,
    Power Point, AutoCAD.

    WORK EXPERIENCE : - 14 YEARS 4 MONTHS
    HIGH CAPACITY EXPERIENCE :- ERECTION OF 3X210MW BOILERS AND ITS PIPING, ERECTION OF 2X750 TPH BOILERS AND ITS PIPING.

    OVERSEAS EXPERIENCE : -
    1) Worked for the erection of 4.8 Tph EGB at Overseas project
    at Bangladesh for M/S Meghna Group of Companies,i.e. Unique power plant.
    ( Also receive appreciation letter and a reward from Thermax Ltd Vice Precident
    And Thermax Engg const co ltd C.E.O. for good work done at this overseas
    Bangladesh project).
    2) Worked for the CUPL, Power plant , road no.2, Chak Leu
    District,Khan Meanchey, Phnom Penh, Combodia.For the erection of WHRB.
    3) Worked for the erection Fuel handling system for Boiler at M/s Nestle
    Philippines, Inc, Cagayan de oro. ( The new fuel handling system used
    Saw dust ,SCG and coffee water waste).
    4) Worked for the erection of WHRU for M/s Burullus Gas Project EGYPT

    Presently working with M/S THERMAX ENGINEERING CONSTRUCTION CO, LTD, Since June 2003 as Asst. Manager Construction. During this period completed.
    a) Worked for the revamping of 75 tph Russian design oil fired
    Boiler at I.O.C.L Barauni Bihar.
    b) Worked for the revamping of 50 x 2 tph texmech design
    make boiler at Mawana U.P for Seal sugars.
    c) Worked for the revamping of 75 tph Russian design boiler
    at I.O.C.L. Barauni.
    d) Worked for the erection of piping and burners of
    WHRB. at IPCL Nagothane.
    e) Worked for the replacement of inbed coils at JCT Pagwara.
    f) Worked for the Erection of 14.5 tph WHRB at Dehaj a unit
    of Birla Copper.
    g) Worked for the Erection of 1.5 tph EGB at Rajashree Polyfils
    Ltd which is the unit Of Century Enka Ltd Pune.
    h) Worked for the Erection of 4.02tph EGB at Jindal Polyfilms
    Ltd, Nasik.
    i) Worked for the Erection of 2.5 tph EGB at Videocon Narmada
    Glass Ltd, Bharuch.
    j) Worked for the Erection of 12.85 X 3 tph WHRB at Gujarat
    Florochemicals Ltd, Dehaj.
    k) Worked for the erection of 4.870tph EGB at M/S
    Garden Silk Mills Ltd, Jolwa SURAT.
    l ) Worked for the erection of 105 TPH AFBC boiler at M/S
    Gallant Metals ltd samkhalye Gandhidham.
    m) Worked for the erection of 1x30 tph HRSG boiler
    erection at M/S Alok Industries ltd. Vapi.
    n) Worked with the erection of 1x16 tph HRSG at
    GHCL ltd. Bhilad.
    (o) Worked for the shut down job At Indian Rayons Verival Gujarat for the CFBC boiler.
    (p) Worked for the erection of 135TPH Chamundeshwri sugars ltd at
    Mandya near Bangalore Karnataka.
    (q) Worked for the erection of 3 nos 1.5tph one nos and 2.285 Tph 2
    nos Exhaust gas boilers at Alok Industries ltd (silvassa).
    (r) Worked for the erection of 9 nos of E.G.B’S at Alok
    Industries ltd (Silvassa)
    (s) Worked for the erection of 30 TPH BFG/FO fired FM boiler at Kirloskar Ferrous Industries Ltd KOPPAL Karnataka.
    (t) Presently working for the erection of 2X750 TPH pulvarised fuel utility boiler at Essar Power Jamnagar.

    I. Worked for the erection testing and commissioning of 2x210 MW coal fired boilers of RTPS(unit V & VI), with steam generating capacity of 675 tons/hr Boilers, under M/S INDWELL CONSTRUCTIONS PVT,LTD, as a SITE ENGINEER from August 1997 to November 2001.

    II. Worked for the erection testing and commissioning of
    1X210MW Boiler of R.T.P.S Unit VII under M/S BHAVANI
    ERECTORS PVT., LTD., as an SITE ENGINEER since December
    2001 to May 2003.

    III. Worked for the Construction and Maintenance works of Boilers at
    VTPS, Vijayawada, KTPS, Palvancha from 14-08-1996 to 31-07-
    1997 for 11 months under M/S BHAVANI ERECTORS.
    Involved in the activities such as axis marking of boilers. Erection of structures and its alignments, Erection of pressure parts, i.e. Drum, Headers, Hangers, Radient roof tubes, Waterwalls, Raiser tubes, Link tubes, Saturated link tubes, Economiser coils, LTSH tubes and coils, plattend coils,Reheater coils, final superheater coils, steam cooled spacers, Desh links, Reheater coils, Eco hanger and Eco coils, Eco links to drum, Down commers and guides, HFO, LFO, Station and its pipings. Reheater, Superheater spray Station and its pipings, sampling lines, soot blowers, wall blowers, temperature probe, LRSB’s Drum safety valves, CRH, RH, EMRV, PRDS safety valves, etc. Ductings, Seal boxes, doors, vibration snubbers, HP drain and Vents, ceiling girders, columns and buckstays.

    Welding :-
    Inspection of HP joints i.e., MS, HRH, CRH, Critical piping, HP bypass, LP bypass, Strainer to turbine piping joints, Nozzeles, PRDS, soot blowers, wall blowers pipings. RH, SH spray stations and its pipings. HP, LP dosing , Extraction, RH, SH, LTSH, Economiser, Raiser, Saturated links, Eco links, Down Commers, Thermowells, HP and LP drains and vent
    Inspection of Structure Welding, Ducting, Columns, Ceiling girders, skin casing, Supports and Guides etc.

    Commissioning Activities :
    Involved in activities like Hydraulic test, Acid Cleaning, Steam blowing etc. Involved in light up activities of boiler i.e. boiler filling, line up of boiler, ID fan FD fan, mills, PA fan, HFO. LFO lineup. Involved in commissioning of safety valves, soot blowers, wall blowers, LRSB’s, Temperature probes, charging of steam from unit V PRDS to Automizing station and SCAP Commissioning of PRDS, CBD tank, soot blower header, Deaerator, safety valves and EMRV etc.,

    Maintenance Activities :
    Involved in replacement of I'st pass rear water wall tubes at 33 meters elevation. Maintenance of soot blowers, walls blowers, LRSB’s, Temperature probes, Fouress valves (Pneumatic), NRV’s EMRV’s, Feed line block valves, motor operated valves, safety valves, steam traps, dampers. Attending of leaks during shut down of units. Replacement of Asbestos for doors of ducts and boiler.

    Quality Control Activities :
    Involved in all the quality control activities of Boiler Piping & S.G.Piping.Involved in flaring of boiler tubes.

    Declaration :
    I would be extremely thankful to you if you give me a chance to serve your organization and I assure you that I would put best of my efforts to fulfill your requirements.

    Date : - 11-10-2010 Yours Faithfully,
    Place : - PUNE (Sainath D. Tirvir)