Piping Designer : Qatar

+ Ask Question / Post resume
Results 1 to 7 of 7
  1. Post Count Number #1
    New recruit
    Join Date
    December 20th, 2008
    Location
    Mumbai
    Posts
    16

    Piping Designer : Qatar

    We are looking for 30 Piping Designers for an MNC consultancy to be based in their Qatar office for 3 months extendable contract.

    Candidate should be Diploma with 8+ years experience.

    Accommodation & Transportation provided by client.

    If your profile matches our requirement, Please send your detailed updated CV in Word Format to epcengg@gmail.com

    Please use the TITLE of this Job Posting as your SUBJECT LINE.

    Please inform your Friends & Colleagues about this opening who fit our required profile and are worth recommending as per your opinion.

    Thank You & Regards.

  2. Post Count Number #2
    On probation
    Join Date
    July 21st, 2010
    Location
    chennai
    Posts
    1

    Re: Piping Designers : Qatar

    V.SIVAKUMAR

    Mobile: +91 9944260708 iyyappan_vsk AT yahoo.com

    Objective
    To work in the organization which provides a challenging environment where by I can utilize my skills in enabling achievement of objectives for the organization.

    Academic Profile

    Diploma in Mechanical Engineering (DME) 2004-2007 75.04 %
    Kamaraj Polytechnic College,
    Pazhavilai.
    Higher Secondary School Leaving Certificate 2002-2004 60.00 %
    Government Higher Secondary School,
    Aralvaimozhi.
    Secondary School Leaving Certificate (SSLC) 2001-2002 80.40 %
    Government Higher Secondary School,
    Aralvaimozhi.

    Work Experience
    Working as a DraughtsPerson in M/s. RG Energy Consultancy Services Pvt., Ltd at Chennai from May 2010 to Till Date
    Worked as a Draughtsman in M/s. BGR ENERGY SYSTEMS LIMITED at Chennai from July 2007 to May 2010

    Nature of Works
    Preparation and Checking of Piping Layouts for various systems like Main Cooling Water System,Axillary Cooling Water System,DM Water System,Fuel oil Unloading System,CT Make Up System,Raw Water System,Effluent System.
    Preparation of Piping Layout for Auxillary Steam System,Turbine Bleed Lines to LP Heater, HP Heater and Deaerator.
    Preparation and Checking of Pipe Rack Layout.
    Preparation and Checking of Insert Plate Layouts.
    Preparation and Checking of Piping Fabrication Isometrics.
    Preparation and Checking of Pipe Support Detail Drawings.
    Piping Bill of Materials.
    Projects Handled
    RG Energy Consultancy Services Pvt., Ltd
    2x35 MW Captive Power Plant (Kamachi Sponge and Power Corporation)
    BGR Energy Systems Ltd
    500MW Vijayawada Thermal Power Station - Stage-IV, unit #7
    Armstrong Service – 8615 Commodity Circle, STE#17.
    500MW Khaperkheda Thermal Power Station Expansion Project.

    Computer Proficiency
    AUTOCAD 2007
    MS OFFICE

    Personal Profile
    Gender : Male
    Date of Birth : June 25, 1987
    Father’s Name : Mr.P.Veeramuthu
    Residential Address : No7/117, Owaiyar Nagar,
    Aralvaimozhi,
    Nagercoil.
    Kanyakumari - 629301.
    Tamil Nadu.
    Nationality : Indian
    Marital Status : Single
    Languages Known : Tamil, English (To Read, Write & Speak)

    Place: yours truly,

    Date:
    (V.SIVAKUMAR)

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Piping Designers : Qatar

    Curriculum vitae
    Mohammed Irshad Ali Namira apartment, Flat no.202,
    Mobile no- 9503776130 2nd floor, new colony Ambernath (w)
    Dist -Thane (Mumbai)
    State- Maharashtra, country-India
    Pin code- 421505
    Email Id : - irsh_1985 AT yahoo.com

    Objective : To provide the best of service to my full potential wherein being continuously as part of a team that dynamically works towards of the organization, the job being in accordance with my 3years of Professional experience and achieve excellence thereof..
    Resume Overview :
    - Over 3 yrs. of experience in Mechanical /Piping/ Steel structure/AutoCAD draughtsman.
    - Preparing Steel structure, HVAC duct, and Piping drawings.
    - Preparing Storage tank, Heat exchangers, and Pressure vessels drawings.
    - Preparation of General assembly drawings.
    - Preparation of Detail & Section drawings
    - Preparation of Isometric drawings.
    - Preparation of Bill of Material.
    - Responsible for preparing all the necessary shop drawings, Sketches.
    - Preparation of As-built drawings as per the site condition.
    - Check visual dimension.
    - Working drawings from rough detailed sketches and notes for Engineering or manufacturing purposes.
    Educational Qualifications :
    - Appeared T.Y.B.COM.(Mumbai University)
    - Diploma in Mechanical Piping Drafting & Designing (1year).
    Additional Qualifications :
    INSTITUTE COURSE
    Industrial Institute of Thane, (Mumbai) Mechanical draughtsman
    Industrial Institute of Thane, (Mumbai) Piping draughtsman
    Industrial Institute of Thane, (Mumbai) AutoCAD 2007
    NIIT Ambernath Branch ,Thane (Mumbai) Programming(oops)
    IBS Private institute, Ambernath ,Thane (Mumbai) Basic Microsoft Office &Internet
    EXPERIENCE IN ABROAD :
    COMPANY Period
    Mechanical Engineering & Contractors, Jordan (Amman) Aug 2009 to Aug 2010
    EXPERIENCE IN INDIA
    COMPANY Period
    Alpha engineering, Ambernath (w), Thane 01/07/2007 to 08/07/2008
    Hi-tech Chemo Equip Ltd ,Ambernath (E) Anandnagar,Thane 10/08/2008 to 11/08/2009
    PERSONAL INFORMATION :
    Father Name : Mr. Valil Ali
    Date of Birth : 18/05/1985
    Gender : Male
    Marital Status : Single
    Passport No : F1587748
    Date of Issue : 07/02/2005
    Date of Expiry : 01/02/2015
    Languages Known : English, Hindi, Marathi, Malayalam, Arabic.
    About me : I am hardworking person with innovative mind, having a good grasping power with sharp memory, good in mathematics & have good potential to do hard work,and eager to learn more in Mechanical/Piping engineering..

    DECLARATION
    I hereby declare that the records, which I stated above, are true and I would be able to submit the records with in your concerned interest. I am keenly interested in joining good organization and I am looking forward to positive replies.
    Date Irshad Ali

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    piping designer

    Vijayakumar k

    vijayakumarkalyan AT gmail.com

    SUMMARY
    ________________________________________
    - Profile : Male , 31 , Married
    - Nationality : India
    - Current Location : UAE
    - Current position : Sr.Piping designer
    - Company : Maritime industrial Services.Co.inc.ltd,
    (Reporting to : Engineer, Lead Engineer)
    Around 11+ years of experience in Design & Detail Engineering consultancy for EPC contracts like Gas pipe line, Jet fuel line, Cross Country Gas Pipeline, Fuel oil storage tanks and associated services and offshore new Build Rigs projects in India, Qatar, United Arab emirates.



    WORK EXPERIENCE
    ________________________________________
    Oct 2005 - Present Maritime industrial services.Co.inc.ltd Sharjah , UAE
    Sr.Piping designer
    Achievements
    Projects (Drilling rig) :
    Super M2 Jack Up Drilling Rig (HULL-109 / 110)
    Super M2 Jack Up Drilling Rig (HULL-106 / 108)
    Super M2 Jack Up Drilling Rig (HULL-107)
    Super M2 Jack Up Drilling Rig (HULL-104 / 105)
    Client :
    SeaWolf Oritsetimeyin (Hull-104 / 105)
    KSAM2 Petro drill Offshore (Hull-107)
    MEJU contract (Hull-106/108)
    Middle East and North Africa –MENA (Hull-109/110)
    Responsibilities :
    - Piping preliminary studies, piping gad, equipment layout &
    Safety layout preparation.
    - Piping modelling such as Exhaust system, Cooling water
    system, High pressure mud system, Low pressure mud
    system, Fire water system, Preload system, Drill water system,
    Bulk and rig air system, saltwater system, Jetting system, Low pressure
    Processing system, Drill floor piping, Bilge system, Diesel oil system,
    Potable water system, Bulk mud system, Crankcase vents system, Co2
    System.
    - Production of iso and Spooling for fabrication etc was done using auto
    plant, Ship constructor-2008.
    - Responsible for all site queries.
    - Support modeling.
    - Co-ordinate with other disciplines.
    - Model review with client, by using viewing software such as
    Navisworks & naviswork manager 2009.
    - Vendor drawing review.
    - Bill of materials preparation (bulk, intermediate, final)
    - FCN (Field change notification) sketch making and issuing to site.
    Projects (onshore) :
    Project link- Jet fuel storage at hfz & Pipeline to SIA Sharjah, U.A.E.
    Ras Laffan, Woqod, HFO bunkering facility – Qatar.
    ADCO Manifold skid (8-slot, 6-slot, 4slot) – Abudhabi, U.A.E.
    SEPOC Separators (production, test) & production manifold.
    FRCL - LPG facility
    FRCL - Steam tracing, Product line Tie-in & Hot Oil Piping
    Uquo field development (EKID GAS PLANT) – Septa Energy Nigeria.ltd
    Responsibilities :
    - Preparation of plot plan, piping preliminary sketches & equipment
    Layout.
    - Piping modelling, equipment modelling by using auto plant.
    - Bill of materials preparation (bulk, intermediate, final).
    - Vendor drawing review.
    - Co-ordinate with other disciplines.
    - Model review with client by using viewing software such as navisworks
    & naviswork manager 2009.
    - Production of iso and Spooling for fabrication etc was done using auto plant.
    - 3d-modeling making using AutoCAD.
    - Checking all type of piping gad, equipment layout and detail drawings.
    - Planning of drawing deliverable.
    - Preparation of miscellaneous drawing.
    - Method study.
    - Skid modeling.
    May 2005 –
    Oct 2005 Saipem India Project limited Chennai , India
    Piping designer
    Project
    Saudi Aramco
    Client : Saudi Aramco
    Responsibilities :
    - Preparation of plot plan, piping preliminary sketches & equipment
    layout.
    - Bill of materials preparation (bulk, intermediate).
    - Preparation of miscellaneous drawing.
    - Preparation of method study.
    - Preliminary study.
    May 2003 –
    May 2005 Valdel Engineers & Constructors Banagalore , India
    Sr.Draftsman
    Projects :
    MHN & Pipeline Project.
    Platform (BA, BC, BE, ICP, BHS, SJ)
    PH, PJ & STD, PPA Platform and pipelines project.
    PS-2 Maydan mahzam field & PS-3 Bulhanine field living
    Quarters & Power upgrade project.
    Songo Songo Gas Development & Power Generation
    Project, Tanzania
    Client :
    MHN & Pipeline Project – ONGCL, India.
    PH, PJ & STD, PPA Platform project -Clough offshore
    PS-2 & PS-3 - Qatar petroleum.
    Songo Songo Gas - Larsen & Toubro Ltd., (L & T), India
    Responsibilities :
    - Preparation of plot plan, piping preliminary sketches & equipment
    layout.
    - Preparation of piping gad’s.
    - Bill of materials preparation (bulk, intermediate, final).
    - Checking all type of piping gad, equipment layout and detail
    drawings.
    - Preparation of miscellaneous drawing.
    - Preparation of piping isometric.
    - Preparation of pipe support drawing.
    May 2002 - May 2003 B.H.E.L piping center Chennai , India
    Technician
    Projects :
    Simhadri (1x500MW).
    Ramagundam(2x500MW).
    Rihand (2x500MW).
    Libya power plant (350MW).
    Client :
    (NTPC) National Thermal Power Corporation.
    Libya - Electric Power Sector.
    Responsibilities :
    - Preparation of miscellaneous drawing.
    - Preparation of piping isometric.
    - All IBR calculations, Documents for getting Statutory IBR Approval
    From Chief Inspector Boiler of Tamilnadu.
    - Preparation of Part drawings of Piping hangers and its supports,
    Nov 1999 - May 2002 J.K Design Engineers. Chennai , India
    Draftsman
    Responsibilities :
    - Preparation of piping isometric.
    - Preparation of miscellaneous drawing.
    - Preparation of P&ID drawings.
    - Preparation of hydro test isometric.
    EDUCATION
    ________________________________________
    Oct 2007 - Oct 2010 B.S Engineering Technology
    `B’-Grade - Birla institute of Technology & Science
    Apr 1997 - Apr 1999 Diploma in mechanical Engineering
    First class, Annai J.K.K.S Polytechnic
    TECHNICAL SKILLS
    ________________________________________
    - AutoCAD all version
    - Plant design system (PDS)
    - Plant design management system
    (PDMS)
    - Shipconstructor 2008
    - Auto plant V8i

    CERTIFICATES
    ________________________________________
    - P.D.C.A certificate - Annai J.K.K. sampooraniammal polytechnic,
    Tamil Nadu – India.
    - CAD/CAM Training. – PSG College of Technology, Peelamedu,
    Coimbatore – India.
    - HSE – Safety training, DPC – (Dubai Petroleum corporation)
    - Auto plant administrator certificate given by Bentley
    - Ship constructor administrator certificate given by ship constructor
    LANGUAGES
    ________________________________________
    - English Fluent
    - Tamil Native
    - Hindi Basic

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    5Years Exp in Piping Designer

    CURRICULAM VITAE
    E.PANDI PRAKASH,
    pandiapk AT gmail.com
    POSITION APPLIED FOR : Designer/(D’man Mechanical)
    DIPLOMA Diploma Mechanical Engineering
    DISCIPLINE / SPECIALIZATION Mechanical/Autocad
    YEAR OF PASSING ( Diploma) 2003 to 2006
    EXPERIENCE
    M/s Enmas Andritz Pvt Ltd,Delhi 10-05-2006 to 12.03.10
    M/s.Hindustan Dorr Oliver Limited,Chennai
    02.04.10 to till date

    TOTAL YEARS OF EXPERIENCE
    IN THE DESIGNER 5 Years& 2months
    CURRENT SALARY (Currency) 3.2Lacs Per annum.
    EXPECTED SALARY Informed at the time of Interview.
    AVAILABILITY TO JOIN 30days from the date of arrival offer
    TECHNICAL WEAKNESS, WHICH
    NEEDS FURTHER
    IMPROVEMENT Piping Software (Design & Analysis),PDS,PDMS
    AREAS OF STRENGTH : Briefly emphasize on your key experience – Basic and
    Detail engineering, FEED packages related to Overall piping layout & Detail of
    Piping orthographic & isometric.

    Objective :

    Seeking a position to utilize my skills and abilities in the Engineering Industry that offers Professional growth while being resourceful, innovative and flexible.
    Qualification :

    Diploma in Mechanical Engineering from Sri Sowdambika polytechnic college, Aruppukottai, Tamilnadu on April-2006, Securing 69.2% of marks.
    Software Skills :
    Design Oriented Package : AutoCAD R2004 & R2006,R2007,R2010
    Operating System : Windows’98, 2000,XP
    Packages : Ms-Office 2003

    Current Job Profile :

    Preparation of overall piping layout for Water Treatment plant (as per ASME).
    Preparation of Flow sheet (P&ID) Diagram for Water Treatment plant.
    Detail of piping & piping supports for Water Treatment plant.
    Preparation of Isometric & Orthographic Drawing of piping Layouts for Water Treatment plant
    Material Take-off & Estimation for a piping system.
    Knowledge of various piping component standards like : ASME B16.5, B16.11 & B16.9.
    Through the knowledge of material specifications of various pipes, butt & socket Fittings, flanges, couplings.
    Experience Summary
    Name of the Contractor / Concern : M/s. Sigma Engineers consultant of
    M/s . Enmas Andritz pvt ltd.
    New Delhi.
    Period of Service : 10-05-2006 to 12.03.10
    Designation : Piping Designer
    Name of the Contractor / Concern : M/s. Hindustan Dorr Oliver Limited,
    Chennai.
    Period of Service : 02-04-2010 to till date
    Designation : Piping Designer
    Project Profile
    M/S.Enmas Andritz (P) Ltd-Delhi.

    Project Title : The ABHISHEK INDUSTRIES LTD, PUNJAB,
    Type of evaporator : Lamella & Long tube vertical (falling film tubular).
    Capacity : 170. TPH Water evaporation
    Description : Detailing of Evaporator Piping layout.
    Project Title : The ABHISHEK INDUSTRIES LTD, PUNJAB.
    Type of Boiler : Chemical Recovery Boiler
    Capacity : 400 tds/day.
    Description : Detailing of Supports.
    Project Title : The ABHISHEK INDUSTRIES LTD, PUNJAB.
    Type of Boiler : AFBC Boiler (Power Boiler)
    Capacity : 2x130 TPH.
    Description : Detailing of Supports.
    Project Title : MAGLAJ NATRON HAYAT, BOSNIA,
    Type of Evaporator : Lamella/raising film
    Capacity : 98 TPH Water evaporation.
    Description : Detailing of Piping Involved In Evaporator.
    Project Title : The SVILOCELL COMPANY, BULGARIA.
    Type of evaporator : Lamella/raising film.
    Capacity : 130 TPH Water evaporation.
    Description : Detailing of Piping Involved In Evaporator.
    Customer : ABC PAPERS LIMITED, PUNJAB
    Type of evaporator : Lamella & Long tube vertical (falling film tubular)
    Capacity : 90 TPH NEW EVAPORATOR
    Description : Piping, Piping layout, Piping supports, and BOM
    Preparing Detail & Assembly Drawings for Evaporator bodies.
    Project Title : ORIENT PAPER MILLS LTD, AMLAI, MATHYA PRADESH.,
    Type of boiler : Lamella/raising film.
    Capacity : 90TPH Water Evaporation.
    Description : Detailing of Piping &Overall piping layout, piping supports.
    Project Title : CENTURY PULP AND PAPERS, LALKUA,NAINITAL.
    Type of Evaporator : Tubular /raising film.
    Capacity : 240 TPH Water Evaporation.
    Description : Detailing of Piping &Overall piping layout,piping supports.
    Project Profile
    M/S.Hindustan Dorr Oliver LTD,

    Project Title : M/S.CHENNAI PETROLEUM CORPORATION LIMITED,
    : EFFLUENT TREATMENT PLANT,
    Description : Prepare the piping layout, supports details, Isometric….
    Project Title : M/S.JAIPUR DEVELOPMENT AUTHORITY,
    : 30MLD SEWAGE TREATMENT PLANT,
    Description : Prepare the piping layout, supports details, Isometric, pedestal location..
    Project Title : M/S. UTKAL ALUMINA INTERNATIONAL LTD,,
    : UTKAL ALUMINA REFINERY PROJECT.
    Description : Prepare the piping layout, supports details, Isometric, etc..
    Project Title : M/S. ANRAK ALUMINIUM LIMITED
    : ANRAK ALUMINA REFINERY.
    Description : Prepare the piping layout, supports details, Isometric, etc..

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    PIPING ENGINEER WITH MORE THAN 6 YEARS EXPERIENCE(4 YEARS GULF EXPERIENCED)

    Resume
    Mohammad shifa salim
    E-mail :shifa2529 AT gmail.com
    Piping Engineer
    CAREER OBJECTIVE

    To be part of a highly motivated team which gives challenging work life where my skills and abilities will greatly enhance the companies growth. Also feel that being a hardworking engineer with 6 years of experience shall contribute to the fulfillment of the goal of the organization I am working for
    EDUCATIONAL QUALIFICATION
    - Bachelor of Technology with First class in MECHANICAL ENGINEERING Kannur University, from L.B.S College of Engineering, Kerala, India (from 1999-2003)
    - Certified course in PIPE STRESS ANALYSYS using CAESAR II (5.00) from KLG SYSTEL LTD. Chennai, India
    - Certified course in PIPING ENGINEERING from Design techniques Bangalore, India
    - Certified course in PDS (plant design system) from sivabalan engineers and Consultants, chennai, India.
    - Certified course in NDT Level II in radiographic testing from Thane Maharashtra India.
    Technical Skills
    P&ID Study, Plant co-ordinate System readout. Prepare isometric & spool drawings. Preparation of MTO-Material Take Off.
    Pipe support selection and span calculations. Isometric to Ortho Conversions, Ortho to Isometric Conversion, knowledge in Pump Piping Layout.
    3D Modeling of Plant Equipment & Piping using PDS
    Generation of isometrics and G.A drawings using PDS
    Knowledge in fabrication of pressure vessels
    PROFESSIONAL EXPERIENCE
    Position : PIPING ENGINEER
    Company : M/S. CRISTAL GLOBAL. Yanbu, Saudi Arabia.
    Project : CEP II, P-07 (Plant Expansion Project),6th line expansion project
    Duration : November 2008 to till date
    JOB PROFILE
    - Responsibilities involves the activity of project in the field of Engineering, Technical Queries, drawing review, executing the project
    - Line routing for instrument air, service water lines, slurry lines, tickle lines, liquid oxygen and nitrogen discharge lines, gaseous oxygen lines ,acid lines, process gas lines and all other utility lines for the plant improvement project. Considering process requirement, operating level, head room level, Maintenance space, walkway spacing and economic route.
    - Prepare piping plan as per P&ID and Prepare isometric drawing for plant maintenance project
    - Prepare MTO (material take off) for piping Isometric drawing according to crystal piping material specification standards.
    - Selection of piping supports, span calculation and assign proper pipe support
    - Co-ordinate with stress group for finalizing pipe-routing and placing of Supports., for critical lines
    - Prepare material requisition for piping materials and evaluating quotation of different vendors and preparing technical recommendations for materials.
    - Piping of metallic and nonmetallic piping(cpvc &bonstrand)
    - Monitoring the installation of piping and preparing as built drawing for the maintenances project
    - Resolve the site queries made by the construction team regarding site problems.
    - Generating the Tie in drawings coordinating with process engineers.
    - Reviewing plant model using Plant Design Management System (PDMS) according to the P&ID and Process Flow Diagram. Updating according to the site condition in the model as per review comments and generates new isometrics to issue for construction for the plant expansion project
    - Review isometric Drawing, piping plan, equipment drawing and structural drawing. for the plant expansion project.
    - Reporting the daily progress of the project activity to the Engineering manager
    Position : Piping Engineer
    Company : M/S. HITACHI Plant Technologies Saudi Arabia.
    Client : Saudi Aramco
    Project : Petro Rabigh Project (Petro chemical), Rabigh, K.S.A
    Duration : Dec 2006 to August 2008
    JOB PROFILE
    - Design review of drawings I.e. isometrics and piping plan with respect to P&ID,piping specification and standards
    - Check the piping plan with respect to the p & id and prepare technical queries regarding design problems
    - Check the bill of materials in the isometrics with respect to Aramco material specification standards.
    - Identify problems in the isometric drawing and make corrections and issue for fabrication
    - Make piping isometrics from piping plan for utility and underground services.
    - Prepare spool drawings of piping isometrics for fabrication
    - Resolve the site queries made by the construction team regarding site problems.
    - Line routing for instrument air, service water lines for the project. Considering process requirement, operating level, head room level, Maintenance space, walkway spacing and economic route.
    - Verify the availability and adequacy of piping material requirement with the help of material controller and make requisition for for shortage materials
    - Monitoring the erection of piping and preparing as built drawings
    - Coordination of engineering department, fabrication yard, site construction team and other external vendor inspector and expedition

    Position : MECHANICAL/ PIPING ENGINEER
    Company : M/S. FURNACE FABRICA (INDIA) LTD, INDIA
    Duration : SEP 2003 to Nov 2006
    JOB PROFILE
    - Production of various process equipments like heat exchangers, columns, reactors, gas driers, knocks out drums etc. My responsibilities involves forming planning schedules for execution, estimation, raising PR’s, following fabrication procedures etc.
    - Plans, Organizes and executes fabrication works in accordance with project schedule and sequence.
    - Supervise all mechanical/piping construction activities to ensure all the works are carried out as per project specification and schedule
    - Organizes materials and equipments for upcoming jobs in advance
    - Prepares daily progress reports and forward to planning department.
    - Receives drawings and schedules and bill of materials checks for correctness and completeness of the materials.
    - Supervises fabrication crew.
    - Prepare work schedules of all related activities to ensure smooth operation of the task/project
    - Assign manpower and equipment in accordance with priorities..
    - Managing and controlling the resources required for the production progress.
    - Managing and controlling production as per quality specification.
    - Maintaining records and registers as per ISO 9001 :2000 standards for identification and trace ability.
    - Take part in the internal audit with Production Department.
    - Preparing, Updating and systematic arrangement of all documents like Quality Policy, Flowcharts, Bar charts, Manpower Planning, Process map, Objective, Registers, Drawings, Organization Chart, Documents list, Work Instructions etc for satisfying the requirement for the impletion of ISO 9001-2000 quality management system
    Computer skills
    - Caesar -II (version 5.0)
    - Pds software.
    - Primavera Project planner (P-3, 3.1), AutoCAD - 2004,
    - Knowledge of OS/Platforms like Windows 9X/NT/2000/XP.
    - Working Knowledge of MS OFFICE
    Professional Attributes

    - Ability to work for the best improvement of the company under pressurized conditions.
    - Excellent analytical skills
    - Able to work within in the framework of established workplace regulations and Policies
    - Good communication skills

  7. Post Count Number #7
    On probation
    Join Date
    November 30th, 2011
    Location
    kuwait
    Posts
    1

    piping designer

    Subject : Application for the Designer (Piping / Structural)
    Dear Sir,
    I am very happy to perceive your requirement for Designer (Piping / Structural). I have been seeking just such an opportunity as this. I enclose my resume as a first step in exploring the possibilities of employment with your Organization.
    I have very rich experience in the field of Piping & Structural Designs and Drawings where is used for Power, Boiler industry, Oil & Gas Industries. I have been working in AutoCAD Release 2011, 2004….,Cad worx plant Release 2010, Micro station (V4 to v8), pdms 11.6, Plant space design serious & support modular for the past 5 years (Includes three month deputation to USA). In my Eight years Design Drafting experience, I have a thorough understanding of most of the aspect in this field.
    I’m very much willing to work in your company. If suitable opportunity is given to me to work with you, I’ll be grateful to you. I’ll be very much thankful if your esteemed organization gives me a chance to show my exceptional abilities. I’m eagerly waiting for reply from you.
    S.RAJASEKAR
    Email : rajasekar7784 AT rediffmail.com , rajasekar7784 AT gmail.com
    ¬¬¬¬¬¬¬
    Professional Objective
    Seeking Suitable position (Diploma holder in Mechanical Engineering) in a progressive company, this promotes teamwork and professionalism and secures a responsible position in the company through hard work and sincerity
    Academic Profile : Diploma in Mechanical Engineering
    Industrial Profile : 8+ years of industrial experience in Design and Detail Engineering of Heavy industry, power, Oil & Gas industry projects.
    Computer Knowledge : Fully conversant & experience in
    PDMS 11.6, Microstation(V8), AutoCAD (2011),
    CADWorx 2009,Plantspace design serious &
    support modular, Mechanical Desktop 6 (powerpack),
    PRO-E2001, X-Steel (TEKLA) 13.1
    & Have experience in operating systems like Windows XP, Vista, NT, LAN Netware, Microsoft Office, MS-word 2007, MS-excel & MS-PowerPoint.
    Qualifications
    Course Certifying Body/ Institution Year
    Diploma in Mechanical Engineering State Board of Technical Education
    Tamilnadu, India 2004
    Diploma in Petroleum Refining Engineering Annamalai university
    Chittambaram, Tamilnadu 2007
    STD X State Board of Education, ST ANDREWS Higher Secondary school in CHENNAI 2001
    Additional Qualification
    - Completed B.B.A at Tamil-Nadu open University
    - Studying B.Tech in Rajasthan University
    - Completed AutoCAD course at Advanced training institute, Chennai
    - Completed Mechanical Desktop 6 at L&T Demag
    Projects Done During D.M.E
    - Design, Drafting and fabrication of Battery Charger and Testing.
    Elective Subject

    - Process Planning and Cost Estimation
    Professional Experience
    1. Organization : M/s. GULF SPIC CONTRACTING CO.W.L.L
    Period : From AUG 10TH 2009 to FEB 19TH 2012

    Position : OIL AND GAS Piping DESIGN AND DRAFTING
    Department : Engineering
    PROJECT EXPERIENCE
    - Worked at M/S. Gulf Spic General Trading & Contracting Co W.L.L. Kuwait. (From May 2009 to Till) in piping Design Draftsman and handled Various Projects in KOC.
    Current Project : RFP-2172-Construction of new export Transit Pipelines from
    New BS-171 to AGRP at Mina Ahmadi
    Client : Kuwait oil Company (KOC)
    Project : RFP-2089-Improvement to Crude Sampling Points At All South and East Kuwait GC’s
    Client : Kuwait oil Company (KOC).

    Project : RFP-2005- Remove the Exciting line and Replace the New
    Underground line (18 Kilo meters)
    Client : Kuwait oil Company (KOC)
    Project : 36678 - Updating of As-Built Drawings in South Kuwait, East Kuwait, North Kuwait, West Kuwait, Tank Farms & Export Facilities including Mina Al Ahmadi and the Ex-Ministry Crude and Fuel Oil Pipelines located anywhere within State of Kuwait and performing all work which could be reasonably deemed necessary to complete.
    Client : Kuwait oil Company (KOC)
    - Job Responsibilities :
    - Preparation of Piping & structural layout Dwgs by using 3D modeling.
    - Preparation of General Arrangement of plant layout & Foundation details.
    - Support drawing preparation by using 2D & 3D modeling (by Micro station &
    plant space).
    - Fabrication Drawings for Piping Isometrics, Pipe Supports, Supporting structures, Framing Plan, Grating detail etc.,
    - Preparation of GAD For tanks
    - As-built for KOC and KNPC.
    - Improvement to crude sampling points at all sampling points at all south and east Kuwait Gc’s for KOC
    - Bill of Material for Fabrication Dwgs. Checking & Update As-built Dwgs.
    - Gathering center full GAD and ISO preparing

    - Clients :
    - Kuwait oil company (KOC)
    - Kuwait national petroleum company (KNPC)
    - EQUATE
    - AMEC
    - LINDE
    - TECHNIP
    - GASCO
    .
    2. Organization : M/s. EPT ENGINEERING SERVICES
    Period : From Nov 2005 to Aug 2009
    (Includes three month visit to USA-Hitachi power system for Ameren project)
    Position : Piping / Structural Designer
    Department : Engineering
    - Job Responsibilities :
    - Preparation of Piping & structural layout Dwgs by using 3D modeling.
    - Preparation of General Arrangement of plant layout & Foundation details.
    - Support drawing preparation by using 2D & 3D modeling (by Micro station & plantspace).
    - Fabrication Drawings for Piping Isometrics, Pressure Vessels, Drawings for Storage Tanks, buck stay Dwgs, ducting Dwgs., Reserve water tank, Blow down tank, Ladders & Platform, Pipe Supports, Supporting structures, Framing Plan, Grating detail etc.,
    - Preparation of Pressure parts details, Super heater, Economizer, Riser tubes, & piping skid packages, their material selection, welding and fabrication.
    - Bill of Material for Fabrication Dwgs., and complete Dwg. Checking & Update As-built Dwgs.
    - Preparation of estimation upon receipt of basic engineering package.
    - Air Quality Control System
    - Service air Piping & Supports in Vcheck Project
    - Forney piping &Supports
    - Clients :
    - Foster wheeler, BHEL, Metso, Volvo, Varo, Hitachi, Enprima
    3. Organization : M/s. L&T-Demag Plastics Machinery Ltd.
    Period : From Feb 2005 to OCT 2005
    Position : Draftsman
    Department : Engineering
    - Job Responsibilities:

    - Detailing of drawings using MDT Power pack 6
    - Designing of jigs & fixtures had designed.
    - Plant layout design.
    - Form tool design/detailing.
    - Trolley for machine shop had designing.
    - Stage drawings had done for production.
    - Gauge’s/Templates had designing.
    - Payment work’s like – PURCHASE ORDER’S, GRN, BILL MATCHING.
    - Inspecting the tools & fixtures, jigs – from vendors.
    Project Title:
    - Cross head fixture development for Aswa model fixture.
    - Assembling of bearing housing for all models & design.
    4. Organization : M/s. DELPHI TVS DIESEL SYSTEM PVT LTD
    Period : Performed as Technical Apprentice
    28/04/2004 TO 21/02/2005
    Position : Technical Trainee
    Department : Manufacturing System Engineering
    - Job Responsibilities:

    - Preparation of shop drawings, cutting plan & MTO
    - Preparation of OLE – over all line effective plans
    - Preparation of OPP-Output per person
    - Monitoring of productivity
    - Designing of Jigs & Fixtures
    - Vendor Development