July 19th, 2010, 09:25 AM
Post Count Number #1
PIPING SUPERVISOR : Resume CV
RESUME :
ASHOK KUMAR MANI TRIPATHI
Email- shiviashok AT yahoo.co.in , shiviashok AT rediff.com , shiviashok AT gmail.com
TO,
RESPECTED SIR,
SUB :-APPLICATION FOR POST OF – PIPING SUPERVISOR
DEAR SIR,
BEING GIVEN TO UNDERSTAND THAT YOU HAVE BEEN RECRUITING PERSONAL FOR THE ABOVE POST, I AM TAKING THIS OPPORTUNITY OF SUBMIT MY CANDIDATURE WITH RELEVENT DETAIL FOR YOUR KIND CONSIDERATION.
Personal Details :
Date of Birth : 08th April1970
Language Known : English, Hindi, ARABIC.
Marital Status : Married.
Nationality/Religion : Indian
Educational Qualification :
Intermediate (10+2) with science and mathematics from U.P. Board Allahabad, In 1992.
Technical Qualification :
Diploma in Mechanical Engineering from Government Polytechnic Collage, Muzaffarpur, (Bihar) during in 1992 to 1995.
Total Experience :
12 years + experience.
A. 10 Years experience in various contracting companies in Abroad.
B. 2 Years experience in various contracting companies in India.
Page 1 of 4
COMPANY : REDIS CONSTRUCTION AFRICA LTD
DESIGNATION : PIPING SUPERVISOR
DURATION : 1/07/2007 TO TILL DATE.
COMPANY : INTEGRATED OIL & GAS SERVICES FZC (OMAN)
DESIGNATION : PIPING SUPERVISOR
DURATION : 01/05/2007 TO 14/06/2007.
COMPANY : BECHTEL INTERNATIONAL INC
DESIGNATION : PIPING SUPERVISOR
DURATION : 02/09/2006 TO 15/12/2006.
COMPANY : SIAMCO ENGINEERING CO. (LLC) (UAE).
DESIGNATION : PIPING SUPERVISOR
DURATION : 05/12/2005 TO 03/07/2006
COMPANY : AL JABER GRINAKER-LTA (A.L.E.C) (UAE)
DESIGNATION : PIPING FOREMAN.
DURATION : 07/10/2004 TO 31/10/2005
COMPANY : REWA ENGINEERING & CONTRACTORS (INDIA)
DESIGNATION : PIPING SUPERVISOR.
DURATION : 23/01/2004 TO 14/08/2004
COMPANY : AL HASAN ENGG. CO. S.A.O.G. (OMAN)
DESIGNATION : PIPING FOREMAN.
DURATION : 15/10/2002 TO 10/10/2003
COMPANY : DODSAL PTE LTD. DOHA QATAR
DESIGNATION : PIPING FOREMAN.
DURATION : 25/03/2001 TO 09/05/2002
COMPANY : REWA ENGINEERING & CONTRACTORS (INDIA)
DESIGNATION : PIPING SUPERVISOR.
DURATION : 14/03/2000 TO 23/02/2001
COMPANY : DODSAL & CO. L.L.C. (OMAN)
DESIGNATION : PIPING FOREMAN.
DURATION : 13/07/1998 TO 31/01/2000
COMPANY : REWA ENGINEERING & CONTRACTORS (INDIA)
DESIGNATION : PIPING SUPERVISOR.
DURATION : 05/01/1998 TO 15/06/1998
COMPANY : POWER TRANSMISSION GULF,(ABUDHABI) UAE
DESIGNATION : PIPING FITTER
DURATION : 15/08/1995 TO 24/09/1997
JOB RESPONSIBILITIES :
- Filed Fabrication & installation of process piping & UTILITY piping & support pre-commissioning as per test pack And QA/QC Co-ordination Inspection Activities of Redis Construction Ltd, KAMOTO REDEVELOPMENT PROJECT in Katanga (Copper & Cobalt) Mining Refinery, Democratic Republic of Congo, Africa.
- Activities of Erection & Fabrication of pipe’s (CS, SS, DSS) Petrofac International & Galfar for PDO (Petroleum Development of OMAN) in Kauther Gas plant (KGP) as per project specification.
- Filed Fabrication & installation of process piping, Utility Piping & HVAC piping & support pre-commissioning as per test pack & systems, SGP (Second Gas Injection & Second Generation Project). In Russia (Kazakhstan) as per PFD (Parson & Flour & Denial) standard with BECHTEL INTERNATIONAL INC. - Fabrication of pipe spool in workshop for many client , material CS,SS, LTCS ,NI-ALLOYS, ALLOY STEEL, SKID Fabrication, Ship piping as per client requirment.
- Fabrication & Installation of process piping in TAKREER RFINARY (U.A.E.) New extant ion project ULG-LSGO (Unloaded Gasoline & Low Sulphar Gas Oil Project) in CCR Unit (Continuous Catalyst Resolution Unit) as per TECHNIP ITALY Standard pre-commissioning, revision, modification work, also doing with direct supply with TECHNIP in this project.
- Fabrication & Installation of new spool replacement of old spool in LUBRIZOL INDIA (Limited.) NAVI MUMBAI & much maintenance work related with piping & support to process piping utility piping stem piping as per requirment of Government client
- Fabrication of many types of pipes support spools in work shop of AL-HASSAN ENGINEERING CO.SOAG (OMAN) as per client standard.
- Fabrication of all types of supports (Electrical, Instrument & Piping Supports) maintaining the documents and quality as per K.B.R.T. (Kellog Brown and Root/Technip) Standard. Fabrication and installation of C.S,S.S & LTCS Pipes And Non metallic Pipe( GRP,PVC,RTR,FRP,HDPE ) Dodsal Pet. Ltd. In Qatar Chemical Project Doha Qatar.
- Maintenance & Shut-down work is doing in LUBRIZOL INDIA (Limited.) NAVI MUMBAI with REWA ENGINEERING & CONTRATORS as per client requirement.
- Fabrication and Installation of CS,SS & LTCS,Alloy Steel spool & pipe support checking of welding & fabrication items, dimension in fabricated as per (CFW) CHIWADA FOSTER WHLLER QA/QC REQUIREMENT & Maintain ISO 9002. Erection of spools & supports in Cryogenic area as per client requirement & follow the project specification for OMAN LNG Project QALHAT SUR (OMAN) with DODSAL & CO. LLC.
- Working in National Organic Chemical Industries Limited (NOCIL) NAVI MUMBAI with REWA ENGINEERING & CONTRACTORS to maintenance & shut-down job like Redevelopment Project.
- Fabrication of spools to relate of chiller plant erection of chiller plant connected pipes support, Fire water piping, Fabrication & Installation. In ADMA OPCO ADGAS HEADQARTER COMPLEX (ABU DHABI) & CHIKAGO BEACH HOTEL (DUBAI).
I have good experience of project like Oil & Gas Refinery, Petrochemical, Gas Plant, LNG Plant piping,HAVC Plant,Power Plant, Water Treatment Plant, Pipe line Project, Copper Cobalt Minning Refinery.
Fabrication & Installation of activities with related job. I have good knowledge of P&ID (Plant & Instrumentation Diagram) General arrangement drawing (GA) & Isometric Drawing( ISO ) & Processes Flow Diagram (PFD) & Knowledge of International code & Specification, Pro Active of handling the material And Manpower & Safety etc,,,,,
February 28th, 2012, 06:43 PM
Post Count Number #2
BIO DATA :
SUDHISH .S.M
Email : sudhishshanmukh AT gmail.com
Career Objectives :
To obtain challenging career in a professionally managed organization which will take full advantage of my Technical and Functional knowledge-
Educational Qualification :
- SSLC passed in 2002
- HSSE passed in 2004
- BSc (Chemistry) passed in 2007
Current company :M/S R&H CONTRACTORS
Designations :PRODUCTION SUPERVISOR / FOREMAN (PIPING & STRUCTURE)
Software skills :
Operating Systems : Windows, XP, Internet,
Office Suit : MS-Word, MS-Office
PROJECT SITE :
M/S LARSEN & TUBRO LIMITED
Total 5 years Experience in Fabrication & Erection.
1 Fabrication Of GSPC PLQP -Living Quarter Module For GSPC Project at L&T Hazira (1500 MT)
2 Fabrication Of MHN MLQ -Living Quarter Module For MHN Project at L&T Hazira (5300 MT)
3 Fabrication &Erection Of Maersk Oil Qatar IA Deck & Building Module (Structural & Piping Fabrication And Erection)(2400 MT)
4 Fabrication Of MNW-NF Bridge Project ( ONGC) (106MTR & 56MTR)
5 Fabrication Of MNW-NF Pile Project (DIA 1219) & Fabrication Of Transition Piece (Tripod Deck) (ONGC)
6 Fabrication Of Transition Piece RS-15 (ONGC)
7 Fabrication and Erection Of FD VII Spudcan Ring Tank For Lyne Mouth Drilling Limited Inc S.A
Responsibilities :
- Knowledge and experience in studying Plant Layout, Piping Layout, Isometric and P&ID drawings etc. .
- Knowledge in using Carbon steel, Alloy steel, Stainless steel materials in Plant Piping works.
- Fabrication, Erection, Testing Co ordination of Plant Piping and piping components.
- Co ordination with NDT for piping works.
- Knowledge Codes and standards for piping works.
- Review of inspection reports.
- Documentation of completed jobs.
- Fabrication, erection and Inspection of different types of supports and making inspection reports..
Declaration :
I hereby declare that all the information furnished above is true to the best of my Knowledge.
Place : Surat
SUDHISH.S.M