Drilling Engineer, Workover Supervisor, Cementing Engineer, Mud Engineer : Kuwait

+ Ask Question / Post resume
Results 1 to 5 of 5
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    Drilling Engineer, Workover Supervisor, Cementing Engineer, Mud Engineer : Kuwait

    Client of Tangerine Kuwait : Drilling Engg/ Drilling Supervisor/ Workover Supervisor/ Cementing Engineer / Mud Engineer - Kuwait
    Company Name : Client of Tangerine
    Company Location : Kuwait
    Designation (of vacancy) : Drilling Engg/ Drilling Supervisor/ Workover Supervisor/ Cementing Engineer / Mud Engineer - Kuwait
    Company E-mail ID : charu@tangerine.org.in
    Company Website : www.tangerine.org.in

    Job Description, Candidate Profile, Company Profile, Company Address :
    Currently we are handling following below mentioned positions for our prestigious client in Kuwait :-

    1. Drilling Engineer / Sr.Drilling Engineer – Residential Position
    2. Drilling Supervisor - 28/28 Days (On/Off)
    3. Rig Workover Supervisor - 28/28 Days (On/Off)
    4. Sr.Workover Supervisor - 28/28 Days (On/Off)
    5. Sr.Workover Engineer - Residential Position
    6. Cementing Engineer - 28/28 Days (On/Off) / Residential Position
    7. Mud Engineer - 28/28 Days (On/Off) / Residential Position
    8. Drilling Material Engineer – 28/28 Days (On/Off) / Residential Position

    Years of Exp : 10 - 30 Yrs

    Location : Kuwait

    Job Type : Permanent

    Salary : - 60000 to 100000 USD Per annum plus benefits (accommodation, Family Status, Education, Medical & Travel Insurance)

    Interviews for the above mentioned position will be conducted in Mumbai and Delhi.

    In case you would like to consider this opportunity, kindly revert back with your updated CV at charu@tangerine.org.in with below mentioned details : -
    1) Current CTC
    2) Expected CTC
    3) Notice Period
    4) Current Location
    5) Immediate contact no.
    6) Date of Birth

    Please call in case of any clarifications.

    Best Regards,

    Charu

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    mud engineer

    CURICULUM VITAE
    SRI KUKIL SUNDAR BORGOHAIN
    e-mail : kborgohain AT yahoo.com
    EDUCATIONAL QUALIFICATION & DEPLOMA
    - Master in (chemistry )from Gauhati university, Assam in 2003
    - Post Graduate Diploma in Computer Application (PGDCA) from Hi-Tech computer Point Dibrugarh (Assam)
    - Six month Advanced Diploma In Hardware Engineering from Hi-Tech computer Point
    Computer Skills :- Office software (Word, Excel. Power point….)
    M-I software, Baroid,
    Well type experienced :
    Vertical/deviated/ J. Band
    Mud System Experienced :
    - Bentonite/C.lignite dispersed mud
    - Glycol/KCL/Polymer
    - PHPA mud
    - Work over/Completion Fluids
    Location and the companies benefits of my services :
    Operator Contractor filed type Block Name Rig Name Mud Type
    1. From 2003 March to December. 2010
    Worked as a Mud Engineer Rig. E1400. (J-bend. Polymer Mud System Newsco), Operator :- Oil India limited. Duliajan.
    Loc : HSD/HSE
    - Mud Used : Polymer (KCL/Glycol Mud.)
    - Mud Wt. : 76 Pcf. (1.21 Sp.gr)
    - Well Depth : 3800 / 3644 meter.
    - Well Type : J-Bend

    2. Worked as a Mud Engineer Rig. E1400. HSF Dikom (Vertical Drilling. B.S. mud). Under Oil India limited. Duliajan
    - Loc : HSF
    - Mud Used : Fresh water/Barytes/Bentonite/Cl/ Xc-Polymer-Pac.
    - Mud Wt. : 76 Pcf. (1.21 Sp.gr)
    - Well Depth : meter.
    - Well Type : Vertical
    3. Worked as a Mud Engineer Chinese Electrical Rig. ZJ50 Well no.14 Under Oil India limited. Duliajan.
    - Loc : DIBA (Bhogpara)
    - Mud Used : Fresh water/Barytes/Bentonite/Cl/ Xc-Poly-Pac.
    - Mud Wt. : 76 Pcf. (1.21 Sp.gr)
    - Well Depth : 3950 meter.
    - Well Type : Deviated
    DEEP WELL EXPERIENCED
    4. Worked as a Mud Engineer in Rig.E3000 S/8, Under Oil India limited. Duliajan.
    - Loc : DGE
    - Mud Used : Xc-Polymer-Pac
    - Mud Wt. : 80 Pcf. (1.28 Sp.gr)
    - Well Depth : 4610 meter.
    - Well Type : Deviated

    - Loc : TX-Mechaki-II (Dholla)
    - Mud Used : Xc-Polymer-Pac, FLC-2000
    - Mud Wt. : 72-86 Pcf. (1.15-1.37 Sp.gr)
    - Well Depth : 5610 meter.
    - Well Type : Vertical

    Presently, working with JayBee Simplex Consortium, Rig- Chinese Electrical - ZJ50 Under Oil India limited. Duliajan. (From 05 January to till date in loc HSX in PHPA mud
    At there I faced various problem like-
    A. Faced problem of heavy cement contamination after 3rd (9 5/8) csg.(Cementing) was done. While running in bit for drilling cement top was observed 90 meter. above casing shoe. This problem was solved by adding NaHCO3 and water in mud.
    B. Fishing took placed at depth 2498 meter. While using TCR Bit tried to match on the string but failed. Then tried to engage overshoot with fish top which was successful as circulation was established. Tried to up but heavy drag observed & decided to do OIL SPOTING which was done successfully by pumping 140 barrels of LWC with 5% Pipelex.
    C. Faced problem of MUD CUT at depth of 3900 meter. While drilling it was observed that the pump pressure had gone down to 1400 psi from 2200 psi. Looked for gas kick but failed to find any. Mud Wt. viscosity and surface pressure were also found to be ok. It was decided to pull out without using Rotary table. After P/O MUD CUT was observed at a depth of 3000 meter.
    D. While drilling at a depth of 4587 meter. Using PDC bit took place again. Tried to match on the string but failed. Pull out was done and various types of overshoot were tried but failed. Then decided to run impression block for fish top impression. Mailing was done and overshoot were tried again but failed to catch the fish. So, plugged the hole at 3700 meter. (3rd casing 9 5/8 ) by Cementing and blocked the conductor casing (20”) at 150 meter.
    E. Faced Mud loss at Loc: TX-Mechaki-II (Dholla), While final circulation was given for 9 5/8” CSG at a depth of 4290 meter. It observed that there was low mud flow from Riser nipple. Measured tank depth every 20 min. interval. It was found that total 344 bbl. of Mud loss. Decided 2% LCM (Mica flakes) pill pumped with 142 bbl of Mud. Also prepared 900 bbl of fresh Mud for displaced. And Pill was work good.
    F. Faced gas kick at Loc: DGA (Barekuri) while pull out. Observed SIDPP 700 to 500psi and CICP 600 to 450 psi. Killed the well by 83pcf of mud. The well depth was 4025mtr.
    KEY SKILL
    - Dedication, hard working and confident.
    - Can work effectively in team, as well as individually.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    PERSONNEL RESUME

    CURRICULUM VITAE
    S.MUD ENGINEER
    FSR Field Services Representative
    E-mail : mansouri.youcef AT yahoo.fr

    Career History
    Year Job title Company
    2004-2011 SENIOR MUD ENGINEER FOR Drilling. & work over Rigs. Baroid Algeria (HALLIBURTON)
    10/07/2004-13/08/2004
    ENAGEO HASSI MESSAOUD
    TECHNICAL MANAGER OF Maintenance
    25/02/2004 -29/04/2004
    EXPERT OF VEHICLE INSURANCE ALGERIA
    Skills
    Arabic- English French - languages Speaking & Writing (Fluently)
    Computer Computer Literate in Microsoft word, Excel, power point, photo Editor, Paint, , Scanning, out Internet Explorer.
    O8 YEARS AS MUD ENGINEER
    - I am working now as a mud engineer . on drilling rig. These are a brief description of the jobs has been done in the above-mentioned duration with related job title.
    TYPE OF MUD USED :
    - WATER BASE MUD (K/CL POLYMERE, PERFOMADRILL , THERMADRILL)
    - OIL BASE MUD (INVERMUL OBM) (COREDRILL-N OBM)
    Companies : STATOILHYDRO ,SINOPEC ,SONATRACH ;BP,REPSOLE,BPXA ,BG,PETROCELTIC
    Ensuring safe, efficient and cost effective execution of the mud and drilling programmes.
    - Directs and controls all operational activities related to the mud and drilling, work over, well completion carried out by the companies on assigned rig, includes directing the proper implementation of various operational programs, e.g. : drilling, work over, completion, logging, testing, acidizing, etc.
    - Proposing and executing amendments to approved programs in response to changing operational parameters.
    - Ensures that all mixing of mud and operations on the rig site consistent with safety, environment rules and regulations.
    - Prepares the daily mud report, summarizing all rig activities in the previous 24 hrs including cost details.
    - Perform all necessary communications with the crew to perform the job in good way on assigned rig.
    - Ensure well control and authorizes remedial/ preventive actions in case of emergency or hazards to safety e.g. : detection of blow out, overflow, and kick as per company policies and emergency procedures.
    - Monitor, controls the activities on site running and pulling Casing & Tubing, running Completion's, acidizing, cementing, coring, cementing, production testing, sampling, etc.
    - Controls all supply activities related to company materials and products on assigned rig,
    - Prepares a variety of cost and activity reports including daily cost/expenditure reports materials consumption and general work progress, Etc.
    -
    Relevant Qualifications
    - WCF certification test “Surface BOPs driller level / 2006
    - STATE ENGINEER ON « MECHANIC »
    - Degree in Petroleum Engineering Specialize– Engineer on motors and applications (IAP)/2004

    Relevant Training and Development
    DATE COURSE NAME LOCATION COMPANY
    02-99 / 08-99
    Training about conception and realisation of drive pinion (GLISON) 16/41axle housing 1320 LORY(TB 340) ALGERIA SNVI -DVI
    16/12/2002
    to 31/12/2002 Training about EMD(electro motors division) ALGERIA /HASSI MESSAOUD ENTP
    23/03/2003 to 06/04/2003 Training about Turbines, Compressors, Pumps.
    ALGERIA – DP HASSI-R'MEL SONATRACH
    01/09/2001
    16/10/2001
    Training about diagnostic of vehicles
    ALGERIA PEUGEOT
    06/04/2002
    02/07/2002 Intensive training in English language
    ( general and technical ) ALGERIA Algerian institute of petroleum
    Engineering school of BOUMERDES
    15/08/2004 SOLIDE CONTROLE ENGINEER ALGERIA
    HASSI MESSAOUD BAROID
    ALGERIA DE SERVICES AUX PUITS (BASP)
    25/11/2004
    22/12/2004 MUD ENGINEER
    HALLIBURTON ALGERIA
    HASSI MESSAOUD BAROID
    ALGERIA DE SERVICES AUX PUITS (BASP)
    11/01/2005
    13/01/2005 WELLSIGHT 2000
    HALLIBURTON ALGERIA
    HASSI
    MESSAOUD BAROID
    ALGERIA DE SERVICES AUX PUITS (BASP)
    03/04/2006 NAFTOGAZ ALGERIA
    HASSI
    MESSAOUD NAFTOGAZ
    13 /04/2008 DRILLING FLUIDE GRAPHICS ALGERIA
    HASSI
    MESSAOUD HALLIBURTON
    2012 EXPERT OF INDUSTRIAL RISK ALGERIA UNION ALGERINNE DES SCIETE DASSURANCE ET DE REASURANCE
    UAR

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    BHATTACHARYYA

    SIR,
    HAVE ANY VACANCY WITH YOUR COMPANY NOW?

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    I am Mud Engineer having 5 years Experience.