Project Installation, Commissioning : Resume CV

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    On probation
    Join Date
    June 29th, 2010
    Location
    Pune
    Posts
    1

    Project Installation, Commissioning : Resume CV

    E -mail : ajit_patil AT sify.com

    Career Objective :
    To get a suitable position in a progressive organization with a scope of career advancement so as to contribute to the progress of the organization by synergizing my hard work and learning and bring to fruition my abilities in the field.

    Work Experience :
    1. API Com Automation Pvt. Ltd.
    Duration : Presently working from Jan2008
    Designation : Asst. Manager (Project)
    Experience :
    Ø Installation & Commissioning of performance & firing engine test beds in different automobile industries.
    Ø Individual site handling experience for months time with modifying system for better performance & reducing engine test timing for to get more output.
    Ø Having experience to calibrate the system for better performance & accuracy also required for ISO audit.

    2. AVL India Pvt. Ltd. (Pune).
    Duration : Feb2003 to Dec2007
    Designation : Senior Engineer.
    Experience :
    Ø To work as a team member for developing our company business of all types of AVL instruments.
    Ø Installation, Commissioning & repairing of our different types of Gas analyzers at different customer sites related to the Automobile sector.
    Ø Installation, Commissioning & repairing of our different types of Smoke meters at different customer sites in the Automobile sector.
    Ø To do the studies of the customer system & as per the requirement suggest the suitable AVL system for their test beds, R&D level systems & at Laboratories of different Engineering colleges.
    Ø To work as senior member in the Sales & Service team & give the proper training & guideline to the subordinates.
    Ø Knowledge of performing Engine Testing on test beds
    Ø Knowledge of dealing with the ARAI for ‘COP’ Testing.

    3. Calitron Services (Chinchwad-Pune).
    Duration : 24 months.
    Designation : Engineer.
    Roles & Responsibilities :
    Ø To perform the calibration of the instruments in the field of Electrical, Mechanical & Thermal.
    Ø To do the repairing of the instruments in the field of Electrical & Thermal.

    4. Kuksons Electronics Pvt. Ltd. (Bhosari).
    Duration : 24 months.
    Designation : Service Engineer.
    Roles & Responsibilities :
    Ø As Service Engineer (Installation, commissioning & repairing of DC Drives, Invertors, UPS)

    Computer Skills : Operating knowledge of Windows & MS-Office.

    Personal Skills :
    * Strong willingness to learn new skills and abilities.
    * Acumen for taking responsibility and high interpersonal skills.
    * Good management skills, demonstrated proficiency in leading and
    mentoring individuals to maximize the level of productivity with a good
    team environment

    Personal Details :
    Date Of Birth : 05th April 1975
    Nationality : Indian
    Martial Status : Married.
    Languages : English, Marathi, Hindi

    Educational details :
    1. DET(Diploma in Electronics & Telecommunication) From Govt. Polytechnic, Washim Dist. Akola in May 1998.
    2. H.S.S.C. From Dhanaji Nana College, Faizpur in 1992 (59.33 %).
    3. S.S.C. From Madhyamik Vidhyalaya, Mhasawad. Tal & Dist Jalgaon in 1990 (76.57 %).

    Place : Pune .
    Ajit Patil

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    installation engnieer

    having 8 years of exp in comissioning and instalation of elevator and esclatora with car lifts pls contact me on erection_sahu123@rediffmail.com